Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 7/27/2004 | 4/26/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 7/27/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10244 issued 7-27-04 to Inland Crane, Inc.
|
BLD-Final | 7/22/2004 | 7/22/2004 | 7/22/2004 | A | PASS |
Jim Storey
|
|
|
|
Code Occupancy Approval | 7/20/2004 | 7/20/2004 | 7/20/2004 | A | PASS |
Wm. Michael Meloy
|
|
|
Compliance met 7/20/2004 10:00:00 AM
|
Permanent Occupancy | | 7/20/2004 | 7/20/2004 | | DONE |
|
|
|
|
BLD-Aging Inspection | 6/15/2004 | 6/15/2004 | 6/15/2004 | | PASS |
Jim Storey
|
|
|
wip 6/15/2004 7:34:57 AM
|
BLD-Aging Inspection | 4/13/2004 | 4/13/2004 | 4/13/2004 | | NR |
Jim Storey
|
|
|
wip 4/13/2004 12:38:01 PM
|
BLD-Aging Inspection | 2/11/2004 | 2/11/2004 | 2/11/2004 | | PART |
Jim Storey
|
|
|
wip 2/11/2004 9:51:19 AM
|
FIRE-Final Inspection | 12/10/2003 | 12/11/2003 | 12/11/2003 | A | PASS |
Rick Jackson
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Final | 12/9/2003 | 12/10/2003 | 12/10/2003 | P | PART |
Jim Storey
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie temp occ ok pending fire. 12/10/2003 4:33:58 PM
|
FIRE-Final Inspection | 12/10/2003 | 12/10/2003 | 12/10/2003 | P | FAIL |
Rick Jackson
|
|
|
David; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes lower fire extinguishers; need detectors for AHU shutdown 12/10/2003 11:19:11 AM
|
BLD-Conference | 11/20/2003 | 11/21/2003 | 11/21/2003 | A | PASS |
Jim Storey
|
|
|
David ###-#### conf ok 11/21/2003 3:02:34 PM
|
CHANGE STATUS TO (ISS) | | | 11/20/2003 | | DONE |
|
|
|
changed to Pending in error.
|
Plan Modification Accepted | | | 11/5/2003 | | DONE |
|
|
|
Received four sets of Mechanical drawings sheets M1.0,M3.0, taken to John M.
|
CHANGE STATUS TO (PND) | | | 11/5/2003 | | DONE |
|
|
|
Mechanical mod. taken to John M.
|
Override - Parcel Holds | | | 10/17/2003 | | |
|
|
|
|
Override - Parcel Holds | | | 10/17/2003 | | |
|
|
|
|
Override - Parcel Holds | | | 10/17/2003 | | |
|
|
|
|
BLD-Framing/Rough-in | 10/1/2003 | 10/2/2003 | 10/2/2003 | A | PART |
Jim Storey
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Annette Moore confrance only. 10/2/2003 9:13:10 AM
|
BLD-Framing/Rough-in | 8/21/2003 | 8/22/2003 | 8/22/2003 | A | PASS |
Jim Storey
|
|
|
c/n made ok. 8/22/2003 2:08:17 PM
|
BLD-Framing/Rough-in | 8/21/2003 | 8/21/2003 | 8/21/2003 | P | CANC |
Jim Storey
|
|
|
TODD; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 8/19/2003 | 8/20/2003 | 8/20/2003 | A | FAIL |
Jim Storey
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Barbara Moore nail sheer at butt foints/ justify gable truss header at entry. 8/20/2003 9:21:55 AM
|
BLD-Framing/Rough-in | 8/18/2003 | 8/19/2003 | 8/19/2003 | P | NR |
Jim Storey
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Conference | 8/11/2003 | 8/11/2003 | 8/11/2003 | A | CANC |
Tom Arcoraci
|
|
|
sced for pm 8/11/2003 10:37:51 AM
|
BLD-Conference | 8/11/2003 | 8/11/2003 | 8/11/2003 | P | PASS |
Tom Arcoraci
|
|
|
install 4x8 headers per plan ok to dry sheet roof 8/11/2003 2:25:22 PM
|
BLD-Foundation | 7/22/2003 | 7/22/2003 | 7/22/2003 | P | PART |
Jim Storey
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Barbara Moore placed with special insp. 7/22/2003 3:35:31 PM
|
BLD-Footing | 7/16/2003 | 7/17/2003 | 7/17/2003 | P | PART |
Jim Storey
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Barbara Moorerebar ok placed with special insp pending report. 7/17/2003 2:56:56 PM
|
BLD-Conference | 7/8/2003 | 7/9/2003 | 7/9/2003 | A | PASS |
Jim Storey
|
|
|
###-####
|
(F) Reprint permit | | | 6/10/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/9/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/3/2003 | | 6/4/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2003 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 6/4/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/4/2003 | | DONE |
|
|
|
|
Telephone call | | | 6/4/2003 | | DONE |
|
|
|
left mess that the permit is ready
|
Plan assigned to (JCM) | 1/17/2003 | | 6/4/2003 | | PASS |
John Menard
|
|
|
6/4/2003 09:03:12 JCM - activity updated through activity BLDA022 from case BLD03-00063.
|
Routing - PLAN CHECK | 6/3/2003 | | 6/3/2003 | | |
|
|
|
|
Routing - PLANNING Land Div | 6/3/2003 | | 6/3/2003 | | PASS |
|
|
|
Approved, deed recorded describing parcel by metes and bounds and new tax parcel #.
|
Plan resubmittals received | | | 6/3/2003 | | DONE |
|
|
|
Received two copies of revised sheet 1 of 37. Routed to John M. kmm
|
Plan resubmittals received | | | 6/3/2003 | | DONE |
|
|
|
Received two copies of revised sheet 1 0f 37. Routed to John M. kmm
|
Plan resubmittals received | | | 6/3/2003 | | DONE |
|
|
|
received letter of transmittal from Leavitt & Assoc., Response letter to Sam R. Response letter to John M. two fire code review comments to Mr. Reese, two copies of EO-3,E4, M1.0, M3.0 and taken to John M.
|
Routing - FIRE | 5/22/2003 | | 6/2/2003 | | PASS |
|
|
|
Occupancy classification and additional information from architect acceptable.
|
Routing - PLAN CHECK | 5/22/2003 | | 5/22/2003 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 5/22/2003 | | PASS |
|
|
|
Plans revisions approved as submitted. JCM
|
Routing - PLANNING Land Div | 5/21/2003 | | 5/21/2003 | | FAIL |
|
|
|
Need to submit recorded deed with one metes and bounds description and one new tax parcel number.
|
Routing - FIRE | 5/8/2003 | | 5/20/2003 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 5/19/2003 | | DONE |
|
|
|
received transmittal letter, letter of response from Leavitt & Assoc., letter of transmittal form Engineering Consultants Inc.,3 page Letter from Jon Rose., Product information from Fibrex. Two sets of 2 of 37, 3-37, 5-37, 15-37, 31-37, 32-37, 33-37, 34-37, 35-37, 36-37, 37-37 M1.0, M3.0, ES-2, E-4, EO-2, 3 ofA-1,
|
Plan Reviewer's activity | | | 5/8/2003 | | |
|
|
|
Spoke with Jim Wylie about the flood plain condition on this site. He indicated that this building was not located within the flood plaina areas and no elevation certificate would be required. JCM
|
Plan resubmittals requested | | | 5/7/2003 | | |
|
|
|
Faxed the engineer a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 4/21/2003 | | 5/7/2003 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 4/17/2003 | | 4/21/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 4/16/2003 | | 4/17/2003 | | CANC |
|
|
|
Louise needed them back
|
Routing - PUBLIC WORKS | 4/15/2003 | | 4/16/2003 | | FAIL |
|
|
|
No plumbing plans for wash pod and valve arangement. Additional review required by public works environmental. WBP
|
Routing - PLUMBING | 4/14/2003 | | 4/15/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 4/11/2003 | | 4/14/2003 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/7/2003 | | 4/11/2003 | | PASS |
|
|
|
Contacted PDQ to take revised plans of 4/4/03 to outside engineering. kmm Received a letter from the consulting structural engineer approving the resubmittals for this office building. JCM
|
Routing - PLAN CHECK | 3/5/2003 | | 4/11/2003 | | |
|
|
|
|
Plan resubmittals received | | | 4/7/2003 | | DONE |
|
|
|
Received three sets of resubmittal sheets "1of 37, 2of 37, 3of 37, 4of 37, 5of 37, 6of 37, 7of 37, 8of 37, 9of 37, 10of 37, 11of 37, 12of 37, 13of 37, 14of 37, 15of 37, 16of 37, 17of 37, 18of 37, 18A of 37, 18B of 37, 19 of 37, 20 of 37, 21 of 37, 22 of 37, 23 of 37, 24 of 37, 25 of 37, 26 of 37, 27 of 37, 28 of 37, 29 of 37, 30 of 37, 31 of 37, 32 of 37, 33 of 37, 34 of 37, 35 of 37, 36 of 37, 37 of 37, EN1.0, EN2.0, EO-1, E0-2, E0-3, SE-1, E-4, E-5, ES-1, ES-2, ES-3, P1.0, P2.0, P3.0, M1.0, M2.0, M3.0, (1) Office HVAC Energy Loads, (1) Shop HVAC Energy Loads, (3) Volume 5 Structural Calculations, (3) Volume 4 Revised Structural Calculations and comment letter. Routed to John Menard.
|
Routing - FIRE | 2/28/2003 | | 3/5/2003 | | FAIL |
|
|
|
No written review done at this time. Awaiting resubmittals to John Menard
|
Routing - PLAN CHECK | 1/24/2003 | | 2/28/2003 | | |
|
|
|
|
Routing - PUBLIC WORKS | 2/28/2003 | | 2/28/2003 | | FAIL |
|
|
|
send to PW as soon as possible per Brian Murphy. dkl
|
Plan resubmittals requested | | | 2/26/2003 | | |
|
|
|
Faxed the engineer of record a copy of the plan review comment list from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 1/17/2003 | | 2/25/2003 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside eng. kmm 2/25/2003-Received structural review from outside engineer and forwarded to John Menard.
|
Routing - PLUMBING | 1/23/2003 | | 1/24/2003 | | FAIL |
|
|
|
office needs plumbing drawings. premise backflow protection and thermal expansion protection will be required.
|
Routing - PLANNING | 1/23/2003 | | 1/23/2003 | | PASS |
|
|
|
Approved per DRH02-143. Under BLD03-00027 there were some floodplain issues that needed to be addresses through Public Works.
|
Routing - PUBLIC WORKS | 1/21/2003 | | 1/22/2003 | | FAIL |
|
|
|
grading permit reviewed under bld03-00027. Requires drainage plan revisions per Brian M. kmm
|
Routing - Erosion and Sediment | 1/22/2003 | | 1/22/2003 | | PASS |
|
|
|
ESC reviewed under esc 03-00015
|
Plans ACCEPTED BY PLAN TECH | | | 1/17/2003 | | DONE |
|
|
|
Requires arch/eng form. We are routing shop and office under same set of plans. Separate building permits. kmm
|
Plan routing begun/NEW & ADDTN | | | 1/17/2003 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 1/17/2003 | | 1/17/2003 | | FAIL |
|
|
|
Need recorded deed with legal description of entire parcel and new tax parcel #.
|
Application received | | | 1/16/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/16/2003 | | DONE |
|
|
|
|
Fee Review-notes | 1/16/2003 | 1/16/2003 | | | |
|
|
|
|