BLD-Final | 4/12/2004 | 4/12/2004 | 4/12/2004 | P | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 4/8/2004 | 4/9/2004 | 4/9/2004 | P | PASS |
Dave Hannah
|
|
|
TODD; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
DOC - Permit Finaled | 4/9/2004 | 4/9/2004 | 4/9/2004 | P | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 4/9/2004 4:08:53 PM
|
BLD-Final | 4/7/2004 | 4/8/2004 | 4/8/2004 | P | PART |
Dave Hannah
|
|
|
TODD; Phone #: ###-#### Internet Inspection Request from: Darla Downs everything ok but need mec c/n items completed 4/8/2004 5:21:11 PM
|
BLD-Final | 4/1/2004 | 4/2/2004 | 4/2/2004 | P | CANC |
Dave Hannah
|
|
|
todd- ###-####
|
BLD-Final | 3/24/2004 | 3/25/2004 | 3/25/2004 | P | FAIL |
Dave Hannah
|
|
|
TODD; Phone #: ###-#### Internet Inspection Request from: Darla Downs needs other trade sign offs 3/25/2004 2:30:15 PM
|
BLD-Grading Inspection | 3/25/2004 | 3/25/2004 | 3/25/2004 | | BND |
Rita DeYoung
|
|
|
Rough grading is completed. Fine grading and revegetation are not complete. A$1000.00 bond has been submitted. therefore the grading and drainage is conditionally approved
|
BLD-Conference | 3/22/2004 | 3/23/2004 | 3/23/2004 | A | DONE |
Dave Hannah
|
|
|
todd martin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Energy code compliance | 1/30/2004 | 2/2/2004 | 2/2/2004 | A | PASS |
Dave Hannah
|
|
|
dave ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 12/1/2003 | 12/2/2003 | 12/2/2003 | P | PART |
Dave Hannah
|
|
|
Randy --- please call first. thanks.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes sheetrock sheer ok to tape and texture 12/2/2003 1:44:52 PM
|
BLD-Energy code compliance | 10/10/2003 | 10/13/2003 | 10/13/2003 | A | PASS |
Dave Hannah
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok to start covering 10/13/2003 10:56:09 AM
|
BLD-Framing/Rough-in | 10/6/2003 | 10/7/2003 | 10/7/2003 | A | FAIL |
Dave Hannah
|
|
|
###-#### bob meet with builder and framer engineering for fixs coming ok to start insulateing all but for areas on c/n 10/7/2003 10:34:07 AM
|
BLD-Framing/Rough-in | 10/3/2003 | 10/6/2003 | 10/6/2003 | P | CANC |
Russ Owen
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 10/2/2003 | 10/3/2003 | 10/3/2003 | A | FAIL |
Russ Owen
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Darla Downs Went over exterior shear is ok to side, also performed an interior frame inspection posted c/n inside. 10/2/2003 9:40:54 PM
|
BLD-Framing/Rough-in | 8/26/2003 | 8/27/2003 | 8/26/2003 | A | CANC |
Dave Hannah
|
|
|
shear
|
BLD-Framing/Rough-in | 8/25/2003 | 8/26/2003 | 8/26/2003 | A | NR |
Dave Hannah
|
|
|
randy sheer wall; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
|
BLD-Framing/Rough-in | 8/26/2003 | 8/26/2003 | 8/26/2003 | P | CANC |
Dave Hannah
|
|
|
RANDY SHEAR WALL; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Foundation | 7/1/2003 | 7/1/2003 | 7/1/2003 | P | PASS |
Dave Hannah
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Footing | 6/25/2003 | 6/26/2003 | 6/26/2003 | A | PART |
Dave Hannah
|
|
|
DONNY; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie all the remainning ftgs 6/26/2003 12:13:32 PM
|
BLD-Footing | 6/20/2003 | 6/23/2003 | 6/23/2003 | P | PART |
Dave Hannah
|
|
|
donny early afternoon please; Phone #: ###-#### Internet Inspection Request from: Barbara Moore main part of house 6/23/2003 1:47:46 PM
|
BLD-Grading Inspection | 6/19/2003 | 6/19/2003 | 6/19/2003 | | PASS |
Rita DeYoung
|
|
|
Geotechnical engineer has approved the footing subgrade.
|
Issue PAID IN FULL permit | | | 5/13/2003 | | DONE |
|
|
|
|
Telephone call | | | 4/14/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Telephone call | | | 4/2/2003 | | DONE |
|
|
|
TALKED TO RANDY HEMMER-CUSTOMER WILL PICKUP BY JUNE.....
|
Inspection Record Card- Bld | | | 2/13/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/13/2003 | | DONE |
|
|
|
|
Telephone call | | | 2/13/2003 | | DONE |
|
|
|
permit ready and fees due
|
Plan assigned to (DJO) | 2/4/2003 | 2/4/2003 | 2/12/2003 | | PASS |
Dan Overy
|
|
|
2/12/2003 11:31:42 DJO - activity updated through activity BLDA022 from case BLD03-00065.
|
Plan Reviewer's activity | | | 2/12/2003 | | DONE |
|
|
|
received satisfaction of non-build agreement. ok to issue permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2003 | | DONE |
|
|
|
|
Plan Review Report | | | 2/10/2003 | | PEND |
|
|
|
|
Case Summary (BLD) | | | 2/6/2003 | | PEND |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 2/4/2003 | | |
|
|
|
|
Plan Reviewer's activity | | | 2/4/2003 | | PEND |
|
|
|
fire department satisfaction required before issuance of permit.
|
Routing - FIRE | 1/24/2003 | | 1/27/2003 | | DONE |
|
|
|
No fire sprinklers required (Nativa Terrace Block 3, Lot 21).
|
Routing - Erosion and Sediment | 1/23/2003 | | 1/24/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PLANNING | 1/22/2003 | | 1/23/2003 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 1/21/2003 | | 1/22/2003 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 1/17/2003 | | 1/21/2003 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3 with conditions of approval in letter frpm Boise Public Works attached to the plan and this case.
|
Application received | | | 1/17/2003 | | |
|
|
|
|
Pending Assignment by DJO | 1/17/2003 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 1/27/2003 | | | | |
|
|
|
|