Case Summary (BLD) | | | 1/31/2008 | | |
|
|
|
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice Sent | | 8/3/2004 | 4/26/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/6/2004 | | |
|
|
|
|
Permanent Occupancy | | 8/17/2004 | 8/17/2004 | | DONE |
|
|
|
|
DOC - Permit Finaled | 8/3/2004 | 8/3/2004 | 8/3/2004 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 8/3/2004 4:02:01 PM
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | DONE |
Tony Young
|
|
|
|
Office Staff conference/action | | | 2/9/2004 | | DONE |
|
|
|
Temp. Occ. Cert. extended until 5-14-04 as per letter from Jenifer.
|
BLD-Final | 11/12/2003 | 11/12/2003 | 11/12/2003 | P | PASS |
Tom Arcoraci
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for perm if others have signed perm occ 11/12/2003 1:57:58 PM
|
Case Summary (BLD) | | | 10/30/2003 | | |
|
|
|
|
BLD-Final | 9/19/2003 | 9/19/2003 | 9/19/2003 | P | FAIL |
Tom Arcoraci
|
|
|
left 2nd c/notice on ramp 9/19/2003 2:19:38 PM
|
FIRE-Final Inspection | 8/26/2003 | 8/26/2003 | 8/26/2003 | P | PASS |
Rick Jackson
|
|
|
|
BLD-Framing/Rough-in | 6/16/2003 | 6/16/2003 | 6/16/2003 | P | PART |
Carl Dependahl
|
|
|
###-#### rory...chk rails, steps at next insp. 6/16/2003 4:45:48 PM
|
BLD-Framing/Rough-in | 6/13/2003 | 6/13/2003 | 6/16/2003 | P | CANC |
Carl Dependahl
|
|
|
###-#### call for access
|
BLD-Framing/Rough-in | 6/12/2003 | 6/13/2003 | 6/13/2003 | A | CANC |
Tom Arcoraci
|
|
|
rory; Phone #: ###-#### Internet Inspection Request from: Annette Moore needs fire final 6/13/2003 8:00:38 AM
|
BLD-Framing/Rough-in | 6/13/2003 | 6/13/2003 | 6/13/2003 | A | NH |
Tom Arcoraci
|
|
|
canc by mistake no access no one at site 6/13/2003 9:29:35 AM
|
Issue PAID IN FULL permit | | | 5/8/2003 | | |
|
|
|
|
Telephone call | | | 5/7/2003 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Routing - PUBLIC WORKS | 5/5/2003 | | 5/6/2003 | | PASS |
|
|
|
Louise Waldorf returned plans with approvals and new sewer use fee's.
|
Routing - PLAN CHECK | 5/6/2003 | | 5/6/2003 | | PASS |
|
|
|
Approved as noted on and attached plan review conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/6/2003 | | PASS |
|
|
|
To permit desk.
|
Inspection Record Card- Bld | | | 5/6/2003 | | |
|
|
|
|
Print Occupancy Form | | | 5/6/2003 | | |
|
|
|
|
Telephone call | | | 5/6/2003 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Plan assigned to (DRS) | 1/31/2003 | | 5/6/2003 | | PASS |
Dan Stuart
|
|
|
5/6/2003 11:22:41 DRS - activity updated through activity BLDA022 from case BLD03-00118.
|
Routing Off Site -Energy | 1/28/2003 | | 5/5/2003 | | PASS |
|
|
|
Route off site to Eric Makela. 4/28/03 recieved copy of energy analysis of the existing structure and for the proposed tenant improvents. Based on report and work declared to be done by design professionals, the project will meet or exceed the requirements of the code for an existing building remodel. New glazing to meet current code and be double pane, to include remaining overhead doors with glass; R-30 Insulation in ceiling; R-5, 1" EPS insulation board on interior side of all exterior masonry walls (requires thermal barrier separation and flame spread rating less than or equal to 75 / smoke developement rating of 450 or less, all per chapter 26 IBC); and insulation / joint sealing of new duct work per section 803 IECC & sheet m1.0; nor new water heating service declared.
|
Routing - PLAN CHECK | 3/7/2003 | | 5/5/2003 | | PEND |
|
|
|
Inserted new plan sheets & resubmittals received 4/28/03 into original plans & entered architects responses, and clarification notes of items to be brought into code compliance if NEW, on the plan review comment sheet given to architect on 2/21/03 and red-line notes on plan sheets.. Routing to PW for re-review for added restroom, sink & drinking fountain.
|
Plan resubmittals received | | | 4/29/2003 | | DONE |
|
|
|
Received two sets of engineering design calcs & details from Thomas Scofield, ZGA, acting in behalf of Ryan McCaene while Ryan is out of town.
|
Plan resubmittals received | | | 4/28/2003 | | DONE |
|
|
|
Plan resubmittals received. New re-submittal copies of Sheets a0.01, a1.01, a1.11, a2.01, a2.11, a3.11, e2.11, energy code analysis sheet and new first time sheets a1.12, a4.11, p1.1, p1.0, en1.0 & m1.0.
|
Routing - PUBLIC WORKS | 3/6/2003 | | 3/7/2003 | | PASS |
|
|
|
|
Routing - FIRE | 3/3/2003 | | 3/6/2003 | | PASS |
|
|
|
no correction required
|
Plan Review Completed(1st rev) | | | 3/6/2003 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 3/3/2003 | | FAIL |
|
|
|
To many issues not answered on submitted plans. Prepaired general list of items needing details or added to plans to allow code review and faxed, mailed & e-mailed to architect. Routing to fire code analyst for initial review.
|
Routing - PLAN CHECK | 2/21/2003 | | 3/3/2003 | | FAIL |
|
|
|
Initital plan review failed. General list of items needing to be addressed and shown on the plans before a plan review can be done was sent to the architect. Forwarding plans to fire code analyst for initial review.
|
Routing - PLANNING | 2/10/2003 | | 2/21/2003 | | PASS |
|
|
|
Approved per DRH02-253, and as noted.
|
Routing - Erosion and Sediment | 2/6/2003 | | 2/10/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Plan resubmittals requested | | | 2/6/2003 | | FAIL |
|
|
|
Copy of energy cod plan review received from Eric Makela. Plans failed. Eric provided copy of additional information required to the design professional.
|
Routing - PUBLIC WORKS | 1/31/2003 | | 2/6/2003 | | FAIL |
|
|
|
No plumbing plans or site investigation documentation on ouside down ramp drain and interior sump connections per conversations with Ryan. Per Walt Baumgartner. Requires street light plan per Bill Colson. kmm
|
Plans ACCEPTED BY PLAN TECH | | | 1/31/2003 | | DONE |
|
|
|
Received two copies of ESC plans and narrative, put with plans. kmm
|
Plans ACCEPTED BY PLAN TECH | | | 1/29/2003 | | PEND |
|
|
|
Applicant may want an interior demo. Told him that a revised cert. reflecting demo. and a cert. for demo would be required. Arch. is working on submitting ESC plan. kmm
|
Plans ACCEPTED BY PLAN TECH | | | 1/28/2003 | | FAIL |
|
|
|
Contacted Arch. about COM check-EZ software must be incorporated into the plans- not just attached, have asked for three copies of plan sheets. Jim Rogers is requiring ESC plan and permit, have asked for two copies of ESC plan and faxed application to Mr. McCaene. Arch./Eng. form needs to be signed. kmm Received COM check-EZ sheets.
|
Application received | | | 1/27/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/27/2003 | | DONE |
|
|
|
|
Fee Review-notes | 1/27/2003 | 1/27/2003 | | | |
|
|
|
|