Permit Information
Permit NumberBLD03-00119
StatusFinaled
Name PATIENT CARE SYSTEM
Site Address 1404 W IDAHO ST Unit: 102
Project Name 
Customer Number 
ePlanReviewNo
Description
(PATIENT CARE SYSTEM, C.J. HUNT) (Robbie Musheno Bldg-Space 102 & 104) (Occupancy Use Change) To remodel the WEST 933 sq. ft. of the main level and 2,014 sq. ft. basement, total tenant area 2,947 sq. ft., of existing building for retail/office/support services, including exterior modifications under DRH02-00253. Work includes new wall frame construction, sheetrock, & finishes; new storefront glazing; electrical, mechanical & plumbing upgrades to meet tenant needs and minimum code compliance. All per approved plans to include all reviewing agency plan check conditions / comments attached to plans and red-line comments on the plan sheets, as part of the approved plans. PC#03-027/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/31/2008  
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 8/19/20044/26/2005 DONE
First Notice Sent 8/3/20044/26/2005 DONE
Permanent occupancy  8/19/2004 DONE
Perm. Occ. Cert. # 10264 issued 8-19-04 to Patient Care System.
Permanent Occupancy 8/17/20048/17/2004 DONE
Details
DOC - Permit Finaled8/3/20048/3/20048/3/2004PPASS
DetailsTony Young
Finaled by inspector at 8/3/2004 4:02:19 PM
BLD-Aging Inspection8/2/20048/2/20048/2/2004 DONE
DetailsTony Young
BLD-Aging Inspection8/2/20048/2/20048/2/2004 DONE
DetailsTony Young
Office Staff conference/action  2/9/2004 DONE
Extended temp. occ. cert. until 5-14-04 as per letter from Jenifer. Waiting on completion of exterior site requirements.
Case Summary (BLD)  12/23/2003  
BLD-Final11/12/200311/12/200311/12/2003PPASS
DetailsTom Arcoraci
rob; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for perm if others have signed perm occ 11/12/2003 1:58:29 PM
Case Summary (BLD)  10/30/2003  
BLD-Final9/18/20039/19/20039/19/2003AFAIL
DetailsTom Arcoraci
call Rory 1st ###-#### cn posted on ext ramp and stairs 9/19/2003 11:47:05 AM
BLD-Final9/17/20039/18/20039/18/2003ANR
DetailsTony Young
rory; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Final9/18/20039/18/20039/18/2003PCANC
DetailsTony Young
rory
need trades 1st,, no inspection 9/18/2003 2:05:09 PM
BLD-Final9/2/20039/3/20039/3/2003AFAIL
DetailsDave Hannah
no one on site also needs a plumbing final 9/3/2003 8:40:04 AM
BLD-Final9/2/20039/2/20039/2/2003PCANC
DetailsDave Hannah
rory; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Final8/26/20038/27/20038/27/2003ANR
DetailsTom Arcoraci
RORY; Phone #: ###-#### Internet Inspection Request from: Marc Lileks needs all sigs on card 8/27/2003 10:30:19 AM
FIRE-Final Inspection8/26/20038/26/20038/26/2003PPASS
DetailsRick Jackson
BLD-Final8/21/20038/21/20038/21/2003PNR
DetailsSteven Webb
RORY TEMP FINAL; Phone #: ###-#### Internet Inspection Request from: Darla Downs More conference than final--not ready even for Temp. Needs trades to sign for temp on occ. card. Will complete and re-call. 8/21/2003 2:56:08 PM
FIRE-Final Inspection8/18/20038/19/20038/19/2003AFAIL
DetailsRick Jackson
rory; Phone #: ###-#### Internet Inspection Request from: Barbara Moore door hardware; need method of exiting from common restroom hallway; extinguishers need mounting and tagged; 8/19/2003 3:29:47 PM
BLD-Framing/Rough-in8/14/20038/15/20038/15/2003APART
DetailsCarl Dependahl
rory; Phone #: ###-#### Internet Inspection Request from: Darla Downs....complete misc items, ok to continue 8/15/2003 11:43:18 AM
BLD-Final8/4/20038/5/20038/5/2003ANR
DetailsCarl Dependahl
basement only//###-#### brad...need trade oks 8/5/2003 9:37:03 AM
BLD-Conference8/5/20038/5/20038/5/2003PNR
DetailsCarl Dependahl
BLD-Framing/Rough-in6/16/20036/16/20036/16/2003PPART
DetailsCarl Dependahl
###-#### rory, chk rails, & steps at final...walls ok to cover. 6/16/2003 4:47:34 PM
Issue PAID IN FULL permit  5/8/2003  
Telephone call  5/7/2003 DONE
LEFT MESS THAT PERMIT IS READY
Routing - PUBLIC WORKS5/5/2003 5/6/2003 PASS
Louise Waldorf returned the approved plans with new fee sheets.
Routing - PLAN CHECK5/6/2003 5/6/2003 PASS
Approved as noted on plans & attached plan review comments / conditions.
PLANS/APPL TAKEN TO FRONT DESK  5/6/2003 PASS
To permit desk for issue.
Inspection Record Card- Bld  5/6/2003  
Print Occupancy Form  5/6/2003  
Telephone call  5/6/2003 DONE
LEFT MESS THAT PERMIT IS READY
Plan assigned to (DRS)1/31/2003 5/6/2003 PASS
DetailsDan Stuart
5/6/2003 11:27:27 DRS - activity updated through activity BLDA022 from case BLD03-00119.
Routing Off Site -Energy1/28/2003 5/5/2003 PASS
Routed off site to Eric Makela. 4/28/03 - Energy review sheets provided with energy code analysis and signed certification of compliance. Plans provided show analysis of existing facility before remodel?? and a new sheet showing upgrades. Comments for energy code modifications on sheet e2.11 for wall insulation; overhead door glazing; attic insulation; storefront/door glazing; HVAC upgrades, insulation & joint seal. Okay as noted on the plans and attached plan review comments / conditions as part of the approved plans. drs
Routing - PLAN CHECK3/7/2003 5/5/2003 PEND
Inserted new plan sheets into original; reviewed corrections made by architect; added notes to plans for field verification and noted architects response to my fax plan review comments of 3/3/03. Routing to PW for re-review based on Walt Baumgartner review and added restroom, sink & drinking fountain on resubmittals.
Plan resubmittals received  4/29/2003 DONE
Received structural engineering calcs & load analysis for installing new HVAC on roof & interior landing / ramp.
Plan resubmittals received  4/28/2003 DONE
received two sets of A0.01 A1.01, A1.11, A1.12, A2.01, A2.11, A3.11, A4.11, E2.11 envelope compliance certificate and lighting compliance certificate. taken to Dan S.
Plan resubmittals received  4/28/2003 DONE
Recieved new 1st time sheets a1.12, a4.11, p1.1, p1.0, en1.0 & m1.0; new plan resubmittal sheets with corrections: a0.01, a1.01, a2.01, a2.11, a3.11, e2.11 & un-numbered energy code analsysis sheet.
Routing - PUBLIC WORKS3/6/2003 3/7/2003 PASS
Plan Review Completed(1st rev)  3/6/2003 FAIL
Routing - FIRE3/3/2003 3/6/2003 PASS
no corrections required
Plan resubmittals requested  3/3/2003 FAIL
Submitted plans incomplete. Corections & clarification list sent to architect for response.
Routing - PLAN CHECK2/21/2003 3/3/2003 FAIL
Initial plan review failed. Plans to incomplete to allow proper review for permit. Forwarded general corrections list for this project to architect for new plan submittal. Forwarded plans to fire code analyst for review.
Routing - PLANNING2/10/2003 2/21/2003 PASS
Approved per DRH02-253, and as noted.
Routing - Erosion and Sediment2/6/2003 2/10/2003 PASS
ESC approved with conditions attached to plans.
Plan resubmittals requested  2/6/2003 FAIL
Received copy of energy code review from Eric Makela. Additional information required. eric sent copy of plan deficiencies requiring response to applicant.
Routing - PUBLIC WORKS1/31/2003 2/6/2003 FAIL
No plumbing plans or site investigation documentation on ouside down ramp drain and interior sump connections per conversations with Ryan. Per Walt Baumgartner. Requires street light plan per Bill Colson. kmm
Plans ACCEPTED BY PLAN TECH  1/31/2003 DONE
Received two copies of ESC plan and narrative. Put with plans. kmm
Plans ACCEPTED BY PLAN TECH  1/29/2003 PEND
Applicant may want an interior demo. Told him that a revised cert. reflecting demo. and a cert. for demo would be required. Arch. is working on submitting ESC plan. kmm
Plans ACCEPTED BY PLAN TECH  1/28/2003 FAIL
Contacted Arch. about COM check-EZ software must be incorporated into the plans- not just attached, have asked for three copies of plan sheets. Jim Rogers is requiring ESC plan and permit, have asked for two copies of ESC plan and faxed application to Mr. McCaene. Arch./Eng. sheet needs to be signed. kmm Received COM check-EZ sheets.
Application received  1/27/2003  
Recd Pcfee & Taken To Pln CK  1/27/2003 DONE
Fee Review-notes1/27/20031/27/2003