BLD-Final | 6/20/2003 | 6/20/2003 | 6/20/2003 | P | PASS |
Dave Hannah
|
|
|
kyle late afternoon; Phone #: ###-#### Internet Inspection Request from: Barbara Moore c.c # 23967 issued 6/20/2003 3:11:01 PM
|
DOC - Permit Finaled | 6/20/2003 | 6/20/2003 | 6/20/2003 | P | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 6/20/2003 3:11:07 PM
|
BLD-Final | 6/18/2003 | 6/18/2003 | 6/18/2003 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/18/2003 at 7:34:54 AM. c/n on site 6/18/2003 3:02:59 PM
|
BLD-Framing/Rough-in | 4/22/2003 | 4/23/2003 | 4/23/2003 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/22/2003 at 4:46:38 PM. Contact: ###-####. ALL C/N ITEMS COMPLETED SHEAR OK ENGINEER REDID SHEAR CREW MADE FIX SHEAR OK 4/23/2003 3:21:01 PM
|
BLD-Energy code compliance | 4/22/2003 | 4/23/2003 | 4/23/2003 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/22/2003 at 4:47:18 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/11/2003 | 4/11/2003 | 4/11/2003 | P | PART |
Steven Webb
|
|
|
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs Interior ok--exterior is sided but no shear inspection was performed--c/notice issued to provide engineering on shear. Ok to insulate. 4/11/2003 2:09:12 PM
|
BLD-Foundation | 2/25/2003 | 2/26/2003 | 2/26/2003 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Footing | 2/24/2003 | 2/24/2003 | 2/24/2003 | P | PASS |
Carl Dependahl
|
|
|
lazaro; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie p.l. staked & strung forms/steel ok 2/24/2003 5:07:32 PM
|
Plan Reviewer's activity | | | 2/10/2003 | | DONE |
|
|
|
have edited verbage of permit body to include demolishion of existing structures.
|
Case Summary (BLD) | | | 2/10/2003 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/10/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/10/2003 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 2/6/2003 | 2/6/2003 | 2/6/2003 | | PASS |
Dan Overy
|
|
|
2/6/2003 10:42:52 DJO - activity updated through activity BLDA022 from case BLD03-00120.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2003 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 2/6/2003 | | |
|
|
|
|
Case Summary (BLD) | | | 2/6/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/6/2003 | | DONE |
|
|
|
|
Telephone call | | | 2/6/2003 | | DONE |
|
|
|
permit ready and fees due
|
Plan Reviewer's activity | | | 2/4/2003 | | DONE |
|
|
|
plans sent back to planning/zoning for revised site plans.
|
Routing - PUBLIC WORKS | 1/29/2003 | | 1/29/2003 | | PASS |
|
|
|
REPLACING AN EXISTING SFD
|
Routing - PLANNING | 1/29/2003 | | 1/29/2003 | | PASS |
|
|
|
Designer updated. PASS. AKT
|
Routing - PLANNING | 1/28/2003 | | 1/29/2003 | | FAIL |
|
|
|
Fail: Rooms must be connected/may NOT be used as ind. lvg. unit. Called 1/29 please update w/connection. AKT.
|
Application received | | | 1/28/2003 | | |
|
|
|
|
Pending Assignment by DJO | 1/28/2003 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | | | | | |
|
|
|
|
Routing - PLANNING Land Div | 2/3/2003 | | | | FAIL |
|
|
|
Per ACHD and our aerial photos property line is inside sidewalk aprox. 6 ft.
|