Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD03-00133
StatusFinaled
Name BEACHWOOD BUILDERS INC
Site Address 13177 W PERSIMMON LN
Project NameMahogany Office Park
Customer Number 
ePlanReviewNo
Description
Ricketts & Associates (Shell & Core) - To construct a new 2580 square foot, one story, wood framed office building shell & core and related site improvements. The core areas to be finished include the main entry, the restrooms and mechanical rooms. This building will have two separate tenant spaces. The 1665 square foot Ricketts & Associates tenant improvement is being done under BLD03-00517. The other teant space is 675 square feet and will have a vanilla finishes. A separate tenant improvement permit will be required to finish the remaining space for occupancy. All construction per the approved plans and attached comment list. DRH02-00239/PC#030-03/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes1/29/20031/29/20034/23/2004 DONE
value came in at 200,000.00 permit was split into shell, grading & TI.
Sub values okay. adh.
FIRE-Final Inspection7/8/20037/9/20037/9/2003APASS
DetailsTroy Cobbley
fire life safety finaled 7/9/2003 8:55:28 AM
BLD-Final7/8/20037/9/20037/9/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 7/8/2003 at 2:56:45 PM. Contact: ###-####.
DOC - Permit Finaled7/9/20037/9/20037/9/2003PPASS
DetailsJim Sly
Finaled by inspector at 7/9/2003 3:07:32 PM
FIRE-Final Inspection7/1/20037/2/20037/2/2003ACANC
DetailsTroy Cobbley
###-#### ###-#### Contractor is not ready. Still waiting on door hardware 7/2/2003 11:04:45 AM
BLD-Conference7/2/20037/2/20037/2/2003PDONE
DetailsJim Sly
###-#### call for a phone conference
FIRE-Conference7/1/20037/1/20037/1/2003PDONE
DetailsTroy Cobbley
at 3pm ###-#### I spoke with the contractor about life safety items. The door hardware on the rear exits and the restrooms is not approved type. And needs to be changed out. 7/1/2003 3:49:38 PM
BLD-Other5/23/20035/23/20035/23/2003APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/23/2003 at 7:04:10 AM. Contact: ###-####. Truss rocked for draftstop.......Need to inspect for complying door at final. (Draftstop not shown on appr plan). 5/23/2003 12:25:52 PM
BLD-Energy code compliance5/21/20035/22/20035/22/2003APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/21/2003 at 12:41:03 PM. Contact: ###-####.
BLD-Framing/Rough-in5/20/20035/20/20035/20/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/20/2003 at 11:14:02 AM. Contact: ###-####. 5/20/2003 1:19:16 PM
BLD-Other4/24/20034/24/20034/24/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/24/2003 at 8:36:14 AM. Contact: ###-####. Shear OK. 4/24/2003 4:53:43 PM
BLD-Foundation4/4/20034/4/20034/4/2003PPASS
DetailsJim Sly
manual; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Footing4/3/20034/3/20034/3/2003PPASS
DetailsRuss Owen
###-####The approved plans indicated a 3500 psi concrete design, I asked the contractor if he had anything taht stated a lower design strength he handed me a lettter from the architect that read 3000 to 3500 psi would meet the specifications for the enguneering calculations, The engineer called back and said 2500 psi is ok. Then I went to sign the job card which was in a folder that was handed to me by the contractor with the stamped enginneering cals they clearly indicated 2500 psi. I then told the contractor to allway keep all information with plans . As this all could have been avoided. I spent almost an hour on a 2500 sq ft foundation inspection. 4/3/2003 4:54:05 PM
(F) Reprint permit  3/18/2003  
(F) Reprint permit  3/18/2003  
Telephone call  3/17/2003 DONE
LEFT MESS THAT PERMIT IS READY
Issue PAID IN FULL permit  3/17/2003  
PLANS/APPL TAKEN TO FRONT DESK  3/12/2003 PASS
Inspection Record Card- Bld  3/12/2003 DONE
CHANGE STATUS TO (PND)  3/12/2003  
john menard has the plans
Plan assigned to (JCM)1/30/2003 3/12/2003 PASS
DetailsJohn Menard
3/12/2003 14:44:39 JCM - activity updated through activity BLDA022 from case BLD03-00133.
Routing - PLAN CHECK3/5/2003 3/10/2003  
Routing - PUBLIC WORKS3/10/2003 3/10/2003 PASS
Routing - PLAN CHECK3/10/2003 3/10/2003 PASS
Routing - FIRE2/28/2003 3/5/2003 PASS
Routing - PLUMBING2/26/2003 2/28/2003 PASS
per plans and 2000 upc
Routing - PLAN CHECK2/19/2003 2/26/2003  
Plan resubmittals received  2/25/2003 DONE
Received four sets of resubmittal sheets C1, A2, A4, A5, A8, A9, A10 with cover/comment letter. Routed to John Menard.
Plan resubmittals received  2/25/2003 DONE
Received four sets of resubmittal sheet C2.0, (1) United Water Letter, and cover/response letter addressed to Richard Dailey. Routed to John Menard.
Plan resubmittals received  2/25/2003 DONE
Received four sets of resubmittal sheets A10 with cover/response letter addressed to Bill VanDeGrift. Routed to John Menard.
Plan resubmittals received  2/25/2003 DONE
Received four sets of resubmittal sheets A9 and A10, (4) Heat Load Calc. Sheet, and cover/response letter addressed to Eric Makela. Routed to John Menard.
Routing - PUBLIC WORKS2/14/2003 2/19/2003 PASS
Send plans to PW after Plumbing review. dkl
Plan Review Completed(1st rev)  2/14/2003 FAIL
Routing - FIRE2/13/2003 2/14/2003 FAIL
WATER QUOTE & HYDRANT LOCATION
Routing - PLAN CHECK2/10/2003 2/13/2003 FAIL
Plan resubmittals requested  2/13/2003  
Mailed the architect a copy of the plan review comment list requesting revisions. JCM
Routing Off Site -Energy1/31/2003 2/12/2003 FAIL
Contacted outside energy reviewer for pickup on 1/30/03. kmm Received a fax from the energy reviewer indicating that he had sent a fax to the architect requesting revisions. JCM
Routing - PLUMBING2/6/2003 2/10/2003 FAIL
please provide a plumbing piping plan addressing the above listed items, you'll need a drip pan under the the water heater with a drain, if you install an r.p. at the service you will need to locate an indirect waster receptor under it to recieve the full discharge.
Routing - PLANNING2/5/2003 2/6/2003 PASS
Approved per DRH02-239.
Routing - Erosion and Sediment2/5/2003 2/5/2003 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS1/31/2003 2/5/2003 FAIL
Requires Drainage Plan per Brian Murphy.
Routing - PLANNING Land Div1/30/2003 1/31/2003 PASS
Lot 7, Block 1 Streeper Subdivision
Plans ACCEPTED BY PLAN TECH  1/30/2003 DONE
Plan routing begun/NEW & ADDTN  1/30/2003 DONE
Application received  1/29/2003  
Recd Pcfee & Taken To Pln CK  1/29/2003 DONE