Letter of compliance | | | 11/26/2003 | | DONE |
|
|
|
Letter of Compliance #24363 issued 11-26-03.
|
BLD-Final | 11/25/2003 | 11/25/2003 | 11/25/2003 | P | PASS |
Jim Storey
|
|
|
final ok 11/25/2003 5:25:29 PM
|
BLD-Final | 11/21/2003 | 11/24/2003 | 11/24/2003 | P | FAIL |
Jim Storey
|
|
|
Chris; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes stairs ans handrail not per chapter 10 or aproved plans. 11/24/2003 5:01:18 PM
|
FIRE-Final Inspection | 11/20/2003 | 11/21/2003 | 11/21/2003 | A | PASS |
Troy Cobbley
|
|
|
life safety finaled 11/21/2003 9:54:51 AM
|
Code Occupancy Approval | | | 11/20/2003 | | PASS |
|
|
|
FINAL SIGNED OFF.
|
Print Occupancy Form | | | 11/18/2003 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 11/14/2003 | 11/17/2003 | 11/17/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scott --- acoutsical ceiling; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes grid ok pending elec ok 11/17/2003 9:17:22 AM
|
BLD-Framing/Rough-in | 10/16/2003 | 10/16/2003 | 10/16/2003 | P | PASS |
Jim Sly
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 9/15/2003 | 9/16/2003 | 9/16/2003 | A | CANC |
Jim Sly
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Annette Moore out of time 9/15/2003 7:51:04 PM
|
BLD-Framing/Rough-in | 9/15/2003 | 9/16/2003 | 9/16/2003 | P | PART |
Jim Sly
|
|
|
Shear wall nailing OK...OK to cover ext.... Add retro fit HDs (hilti quick bolt OK per eng) at studs marked with X.....will check @ frame. 9/16/2003 3:40:14 PM
|
BLD-Wall cover | 8/27/2003 | 8/27/2003 | 8/27/2003 | P | PART |
Tom Arcoraci
|
|
|
RUSS; Phone #: ###-#### Internet Inspection Request from: Marc Lileks needs eng app for shear wall changes due to window and door changes nailing is 2 inch on center ok to cover ext pending approval from eng 8/27/2003 3:34:23 PM 8/27/2003 3:35:04 PM
|
BLD-Framing/Rough-in | 5/28/2003 | 5/28/2003 | 5/28/2003 | P | PART |
Russ Owen
|
|
|
russ; Phone #: ###-#### Internet Inspection Request from: Annette Moore. Roof ok. 5/29/2003 12:46:08 PM
|
BLD-Foundation | 4/9/2003 | 4/10/2003 | 4/10/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/9/2003 at 10:17:24 PM.
|
BLD-Concrete | 4/1/2003 | 4/2/2003 | 4/2/2003 | A | PASS |
Tom Arcoraci
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore footings ok 4/2/2003 10:02:31 AM
|
(F) Reprint permit | | | 3/18/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/17/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/14/2003 | | DONE |
|
|
|
|
Telephone call | | | 3/14/2003 | | DONE |
|
|
|
permit ready
|
Plan assigned to (MLO) | 2/7/2003 | | 3/14/2003 | | PASS |
Mike Otto
|
|
|
3/14/2003 14:43:42 MLO - activity updated through activity BLDA022 from case BLD03-00174.
|
Routing Off Site -Energy | 2/7/2003 | | 3/14/2003 | | PASS |
|
|
|
called Eric Makela to pick up for outside energy review. dkl
|
Routing - PLAN CHECK | 3/11/2003 | | 3/14/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/11/2003 | | |
|
|
|
received three sets of plans with letter.rad
|
Routing - FIRE | 3/6/2003 | | 3/7/2003 | | PASS |
|
|
|
NO CORRECTIONS REQUIRED
|
Plan Review Completed(1st rev) | | | 3/7/2003 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 3/6/2003 | | DONE |
|
|
|
UBC corrections
|
Routing - PLAN CHECK | 2/25/2003 | | 3/6/2003 | | FAIL |
|
|
|
corrections faxed and mailed to architect
|
Routing - PLUMBING | 2/20/2003 | | 2/25/2003 | | PASS |
|
|
|
IS 11/4" WATER SERVICE LARGE ENOUGH FOR INTENDED USE OF BUILDING?
|
Routing - PLANNING | 2/12/2003 | | 2/20/2003 | | PASS |
|
|
|
Approve per DRH00-242
|
Routing - Erosion and Sediment | 2/11/2003 | | 2/12/2003 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 2/7/2003 | | 2/11/2003 | | PASS |
|
|
|
Original Grading/Drainage under Bld01-00257.
|
Routing - PLANNING Land Div | 2/7/2003 | | 2/7/2003 | | PASS |
|
|
|
Lot 2, Block 1, Times Square Subdivision.
|
Plans ACCEPTED BY PLAN TECH | | | 2/7/2003 | | DONE |
|
|
|
1. No plumbing, mechanical, or electrical plans were submitted. I was informed by applicant (Morgan Const) that this was for shell only.
2. Plans not fully dimensioned.
3. "Accept plans as is", per Marlene Southard.
|
Application received | | | 2/5/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/5/2003 | | DONE |
|
|
|
|
Fee Review-notes | 2/5/2003 | 2/5/2003 | | | |
|
|
|
|