Permit Information
Permit NumberBLD03-00194
StatusFinaled
Name VISSER BUILDING CO
Site Address 2425 E PLATEAU CT
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 5901 sq. ft. two story single family dwelling with a 2223 sq. ft. finished basement, a 1500 sq. ft. attached four car garage/storage area and multiple concrete patios/terraces per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible space will be maintained. (1st floor 4418 sq. ft.)(2nd floor 1483 sq. ft.) PC #068 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection9/21/20049/22/20049/22/2004ADONE
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/21/2004 at 12:33:10 PM. Contact: ###-####. Fire not required to sign 9/22/2004 8:51:11 AM
BLD-Final9/21/20049/22/20049/22/2004ACANC
DetailsTroy James
Scheduled by a contractor via Hello! on 9/21/2004 at 12:35:39 PM. Contact: ###-####. Ran out of time. 9/22/2004 10:02:24 AM
BLD-Final9/22/20049/22/20049/22/2004PPASS
DetailsTroy James
BLD-Grading Inspection9/22/20049/22/20049/22/2004 DONE
Final grading and drainage approved
DOC - Permit Finaled9/22/20049/22/20049/22/2004PPASS
DetailsTroy James
Finaled by inspector at 9/22/2004 4:25:27 PM
BLD-Final8/24/20048/25/20048/25/2004ACANC
DetailsTroy James
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore
ran out of time 8/25/2004 10:09:55 AM
BLD-Final8/25/20048/25/20048/25/2004PDONE
DetailsDave Hannah
meet at 2:00pm
BLD-Foundation6/8/20046/8/20046/8/2004PPART
DetailsDave Hannah
Bob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughesplanter and retainning wall ftgs 6/8/2004 4:16:22 PM
BLD-Energy code compliance2/20/20042/23/20042/23/2004APASS
DetailsTroy James
Bob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in1/21/20041/21/20041/21/2004PFAIL
DetailsTroy James
bob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
need nailing at hangers main level and positive plate attachment at corners exterior walls. ok to insulate 1/21/2004 3:38:35 PM
BLD-Energy code compliance12/30/200312/30/200312/30/2003PPART
DetailsTony Young
Bob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
ok to cover lower mechanical room walls pending trades 12/30/2003 4:13:00 PM
BLD-Framing/Rough-in12/29/200312/29/200312/29/2003PPART
DetailsJim Storey
Bob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes sheer ok/ ok to rock 3 mech rooms with reinsp on insulation levels at exterior walls of 2 rm,s. 12/29/2003 2:48:39 PM
BLD-Framing/Rough-in11/14/200311/14/200311/14/2003PPART
DetailsDave Hannah
shear -bob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie nailing ok but missing two holddowns and two fl to fl straps 11/14/2003 1:27:54 PM
BLD-Foundation10/7/200310/7/200310/7/2003PPASS
DetailsSteven Webb
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore 2-pour in place concrete fireplace caps, rebar per plans. 10/7/2003 4:38:07 PM
BLD-Framing/Rough-in9/10/20039/10/20039/10/2003PPART
DetailsRuss Owen
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore. roof to concrete wall straps. 9/10/2003 12:41:20 AM
BLD-Foundation7/28/20037/29/20037/29/2003APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/28/2003 at 8:48:53 AM. Contact: ###-####.second pour on fire places 7/29/2003 12:29:09 PM
BLD-Foundation7/10/20037/14/20037/14/2003APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/10/2003 at 9:06:08 AM. Contact: ###-####. fire places 7/14/2003 12:52:50 PM
BLD-Foundation7/1/20037/1/20037/1/2003ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/1/2003 at 5:55:59 AM. Contact: ###-####.
BLD-Footing7/1/20037/1/20037/1/2003PPART
DetailsDave Hannah
upper level walls 7/2/2003 8:36:36 AM
BLD-Foundation6/24/20036/25/20036/25/2003APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/24/2003 at 4:46:01 PM. upper nw walls 6/26/2003 7:14:58 AM
BLD-Foundation6/15/20036/16/20036/16/2003APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/15/2003 at 9:35:17 PM. Contact: ###-####.
BLD-Foundation6/13/20036/13/20036/13/2003PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/13/2003 at 10:05:54 AM. Contact: ###-####.upper area living roomnorth side 6/13/2003 1:35:52 PM
BLD-Foundation6/9/20036/10/20036/10/2003APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/9/2003 at 12:17:57 PM. Contact: ###-####. header over garage back walls of garage upper footings second pour on column 6/10/2003 10:56:03 AM
BLD-Foundation5/23/20035/23/20035/23/2003PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/23/2003 at 8:07:05 AM. garage fronts 5/23/2003 1:19:08 PM
BLD-Foundation5/23/20035/23/20035/23/2003PPART
DetailsDave Hannah
###-####
BLD-Foundation5/20/20035/21/20035/21/2003APART
DetailsDave Hannah
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moorefirst pour on four columns 5/21/2003 11:47:11 AM
BLD-Framing/Rough-in5/12/20035/13/20035/13/2003ANR
DetailsDave Hannah
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Foundation5/13/20035/13/20035/13/2003APART
DetailsDave Hannah
high wall around garage ok to pour
BLD-Grading Inspection5/8/20035/8/20035/8/2003 PASS
DetailsRita DeYoung
work in progress 5/8/2003 2:45:45 PM
BLD-Grading Inspection5/8/20035/8/20035/8/2003 PASS
DetailsRita DeYoung
Geotech engineer approved garage footing subgrade.
BLD-Footing5/6/20035/7/20035/7/2003APART
DetailsDave Hannah
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore this the garage area and guest area crew is 75 % completed 5/7/2003 10:41:52 AM
BLD-Foundation4/23/20034/23/20034/23/2003PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/23/2003 at 10:05:19 AM. BASE MENT WALLS ok to pour 4/23/2003 4:33:59 PM
BLD-Footing4/15/20034/15/20034/15/2003PPART
DetailsDave Hannah
BOB; Phone #: ###-#### Internet Inspection Request from: Darla Downs basement level ok pour 4/15/2003 4:45:23 PM
BLD-Grading Inspection4/15/20034/15/20034/15/2003 DONE
DetailsRita DeYoung
GEOTECH ENGINEER HAS APPROVED THE FOOTING SUBGRADE
Issue PAID IN FULL permit  3/27/2003 DONE
Plan assigned to (DJO)3/11/20033/11/20033/21/2003 PASS
DetailsDan Overy
3/21/2003 14:15:18 DJO - activity updated through activity BLDA022 from case BLD03-00194.
PLANS/APPL TAKEN TO FRONT DESK  3/21/2003 DONE
Inspection Record Card- Bld  3/21/2003  
Print Occupancy Form  3/21/2003  
Telephone call  3/21/2003 DONE
LEFT MESS THAT PERMIT IS READY
Plans ACCEPTED BY PLAN CHECK  3/11/2003  
Plan Reviewer's activity  3/11/2003 PEND
plans being held up for revision sheets.
Case Summary (BLD)  3/11/2003 PEND
Plan Review Report  3/11/2003 PEND
Routing - FIRE2/18/2003 2/20/2003 DONE
Need FD interpretation of plat note to determine if AS requirements apply. Awaiting D. Miller response
2/20/03-Okayed by DM with No fire sprinklers required.
Routing - PLANNING2/14/2003 2/18/2003 PASS
Routing - Erosion and Sediment2/18/2003 2/18/2003 PASS
ESC approved with attached conditions.
Routing - PUBLIC WORKS GRADING2/7/2003 2/14/2003 PASS
DetailsRita DeYoung
Approved as Category 3 with conditions of approval in letter attached to the plans and this case.
Routing - PUBLIC WORKS2/14/2003 2/14/2003 PASS
Application received  2/7/2003  
Pending Assignment by DJO2/7/2003    
DetailsDan Overy
Routing - PLAN CHECK2/20/2003