Permit Information
Permit NumberBLD03-00201
StatusFinaled
Name HOLLAND JOHN & JANET FAMILY TRUST
Site Address 516 S CAPITOL BLVD Unit: 100
Project NameBOULEVARD INVESTORS
Customer Number 
ePlanReviewNo
Description
(HOLLAND REALTY)(BOULEVARD INVESTORS BLDG-1ST FLR-SUITE 100) Remodel to an existing 3,664 sq.ft. tenant space on first floor of existing building for a new office tenant per approved plans on file. Work to include some minor interior demolition work, remodeling reception/waiting area, new manager's office, a new conference room, a new tech/break room, remodeling restrooms, some new one-hour rated corridor walls, two new 20 minute rated doors in rated exit corridor walls, 45 minute rated wire glass window in rated exit corridor, two new 60 minute temperature rated doors in existing one-hour rated stair enclosures, interior finish, some new ceiling work, cabinets/counters, mechanical work, plumbing work, and electrical work. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is NOT fire sprinklered. (PC#042-03) JCB
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  1/29/2019 DONE
BLD-Aging Inspection6/16/20046/16/20046/16/2004 PASS
DetailsDave Hannah
All required inspection completed, need to issue C of O and change status to FNL
DOC - Permit Expired6/16/20046/16/20046/16/2004APASS
DetailsDave Hannah
Expired by inspector at 6/16/2004 9:50:22 AM
BLD-Final5/15/20035/16/20035/16/2003APASS
DetailsCarl Dependahl
rick ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Final Inspection5/15/20035/15/20035/15/2003PPASS
DetailsRick Jackson
rick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Final5/8/20035/9/20035/9/2003APART
DetailsDave Hannah
rick; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for temp occ needs smoke detectors in ducts and fire life safteys sign off 5/9/2003 11:19:38 AM
FIRE-Final Inspection5/7/20035/8/20035/8/2003PPART
DetailsRick Jackson
RICK; Phone #: ###-#### Internet Inspection Request from: Darla Downs fire/life safety on temp per approval from Dave Miller pending installation/testing of in-duct detectors for damper release 5/8/2003 2:32:49 PM
FIRE-Final Inspection5/2/20035/5/20035/5/2003PFAIL
DetailsRick Jackson
###-#### need detectors to operate smoke/fire dampers; extinguishers needed; repair exit sign on NE stair exit; doors not latching in corridor; exit sign needed as shown on plnas at main exit 5/5/2003 4:41:02 PM
BLD-Framing/Rough-in4/28/20034/29/20034/29/2003PPART
DetailsCarl Dependahl
rick ceiling grid; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...ok to tile, fire dampers ok. 4/29/2003 4:31:18 PM
BLD-Framing/Rough-in4/22/20034/22/20034/22/2003PFAIL
DetailsCarl Dependahl
rick celing grid; Phone #: ###-#### Internet Inspection Request from: Darla Downs...need ele r/i, wire lites. 4/22/2003 4:38:46 PM
BLD-Conference4/3/20034/4/20034/4/2003AFAIL
DetailsCarl Dependahl
c/n issued: add SF dampers at lobby 4/4/2003 10:35:55 AM
BLD-Conference4/3/20034/3/20034/3/2003PPASS
DetailsCarl Dependahl
w/Ron, RM mech...need permit, SF dampers at exit system. 4/3/2003 6:10:05 PM
BLD-Conference4/2/20034/2/20034/2/2003APASS
DetailsCarl Dependahl
w/ RM Mech re hvac at corridor 4/2/2003 4:59:16 PM
BLD-Framing/Rough-in3/27/20033/28/20033/28/2003PPART
DetailsCarl Dependahl
richard; Phone #: ###-#### Internet Inspection Request from: Annette Moore...ok to cover wallschk firestops at drywall w/ clg insp...hvac? 3/28/2003 5:15:38 PM
BLD-Conference3/13/20033/14/20033/14/2003APASS
DetailsCarl Dependahl
richard; Phone #: ###-#### Internet Inspection Request from: Annette Moore...re 1hr corridors: remove or protect flex duct, seal penetrations, etc. 3/14/2003 9:58:04 AM
Routing - PLAN CHECK3/3/2003 3/10/2003 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  3/10/2003 PASS
Inspection Record Card- Bld  3/10/2003  
Print Occupancy Form  3/10/2003  
Telephone call  3/10/2003 DONE
LEFT MESS WITH ELIZABETH THAT PERMIT IS READY
Issue PAID IN FULL permit  3/10/2003 DONE
Plan assigned to (JCB)2/11/2003 3/10/2003 PASS
DetailsJason Blais
3/10/2003 09:35:33 JCB - activity updated through activity BLDA022 from case BLD03-00201.
Plan resubmittals received  3/3/2003 DONE
Received two copies of revised sheetsA0.0, A0.1, A1.0, A2.0, A3.0, E1.0. One copy of response letter. Routed to Jason B. kmm
Routing - FIRE2/26/2003 3/3/2003 PASS
no corrections required
Plan resubmittals requested  2/26/2003  
Plan resubmittals and written response required for further review.
Routing - PLAN CHECK2/13/2003 2/26/2003 FAIL
Plan review report sent and e-mailed to architect. Plan resubmittals and written response required for further review. Plans routed to Fire Dept. for review.
Routing - PUBLIC WORKS2/12/2003 2/13/2003 PASS
Fee Review-notes2/7/20032/7/20032/7/2003 DONE
Plans ACCEPTED BY PLAN TECH  2/7/2003 DONE
Application received  2/7/2003  
Recd Pcfee & Taken To Pln CK  2/7/2003 DONE
Routing Off Site -Energy2/12/2003    
Ron Oltman to pick up plans for energy review. kmm