PubWorks Occupancy Approval | 5/12/2004 | 5/12/2004 | 5/12/2004 | | DONE |
|
|
|
Drainage project complete, as-built as per plans by M.Strasser.
|
DOC-Permit Expired | 12/8/2003 | 12/8/2003 | 12/8/2003 | | DONE |
Tom Arcoraci
|
|
|
Permit expired by limitations.
|
DOC-Permit Expired | 10/7/2003 | 10/7/2003 | 10/7/2003 | | CANC |
Tom Arcoraci
|
|
|
Permit expired by limitations. wip ok 10/7/2003 8:19:19 AM
|
BLD-Aging Inspection | 8/6/2003 | 8/6/2003 | 8/6/2003 | | PASS |
Tom Arcoraci
|
|
|
wip 8/6/2003 8:34:56 AM
|
Override - Parcel Holds | | | 5/7/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/7/2003 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/6/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/6/2003 | | DONE |
|
|
|
|
Telephone call | | | 3/6/2003 | | |
|
|
|
|
Routing - PUBLIC WORKS | 3/3/2003 | | 3/5/2003 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 3/5/2003 | | 3/5/2003 | | PASS |
|
|
|
ESC approved with conditions.
|
Routing - FIRE | 2/25/2003 | | 3/3/2003 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 3/3/2003 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 3/3/2003 | | 3/3/2003 | | |
|
|
|
Placed in "hold box" until additional requirements are submitted.dl
|
Routing - PLUMBING | 2/24/2003 | | 2/25/2003 | | PASS |
|
|
|
|
Routing - PLANNING | 2/18/2003 | | 2/23/2003 | | DONE |
|
|
|
Susan Riggs
|
Routing - Erosion and Sediment | 2/14/2003 | | 2/18/2003 | | FAIL |
|
|
|
Need checklist tables for rp according to Plan Designer Appendix C
|
Routing - PUBLIC WORKS | 2/11/2003 | | 2/14/2003 | | FAIL |
|
|
|
Requires Drainage Plan revision
|
Application received | | | 2/11/2003 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/11/2003 | | DONE |
|
|
|
1. Called applicant for ESC permit application. Kirk Morris will fax as soon as possible.
|
Routing - PLANNING Land Div | 2/11/2003 | | 2/11/2003 | | PASS |
|
|
|
Site is over 5 acres in size as per ROS 4861.
|
Routing - PLAN CHECK | 3/6/2003 | | | | |
|
|
|
|