Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD03-00250
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 1055 N CURTIS RD
Project NameST ALS-EAST LOBBBY ADDITION
Customer Number 
ePlanReviewNo
Description
(St. Alphonsus Medical Center, South Tower, East Lobby Demo & Shell Addition) - To demolish some exterior store front glazing and entry doors, interior partitions, ceilings, concrete slab area, mechanical, electrical, etc. at an approximate 2700 square foot area of the east entry lobby and office and out patient pharmacy areas in preparation for the renovation of this area; and to construct a new 563 square foot, one story, entry shell addition. This permit also includes the infill of an existing 20 lineal feet of the north exterior wall of the adjoining building. All construction per the approved plans and attached comment list. There is no occupancy allowed under this permit. These areas will be finished under tenant improvement permit BLD03-00379. PC# 56-03/JCM DRH02-00256
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/18/20042/18/20042/18/2004PPASS
DetailsTom Arcoraci
Tony, ###-####
DOC - Permit Finaled2/18/20042/18/20042/18/2004PPASS
DetailsTom Arcoraci
Finaled by inspector at 2/18/2004 3:30:40 PM
BLD-Aging Inspection1/16/20041/16/20041/16/2004 NR
DetailsTom Arcoraci
Code Occupancy Approval  11/20/2003 PASS
LANDSCAPE PART OF DRIEWAY SO SIGNED FINAL.
BLD-Framing/Rough-in11/5/200311/6/200311/6/2003APASS
DetailsTom Arcoraci
tony; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in10/21/200310/21/200310/21/2003PFAIL
DetailsRuss Owen
Tony; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes . c/n grid ceiling. 10/21/2003 12:39:55 AM
BLD-Framing/Rough-in8/25/20038/26/20038/26/2003APART
DetailsTom Arcoraci
tony ; Phone #: ###-#### Internet Inspection Request from: Annette Moore wip ok 8/26/2003 9:03:21 AM
BLD-Framing/Rough-in8/4/20038/4/20038/4/2003PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/4/2003 at 7:57:32 AM. Contact: ###-####. struc steel w/spec insp wip 8/4/2003 1:10:23 PM
BLD-Footing6/10/20036/10/20036/10/2003PPART
DetailsRuss Owen
###-#### tony. Teragon on site to perform special inspection. 6/10/2003 2:32:13 PM
(F) Reprint permit  6/10/2003 DONE
CHANGE STATUS TO (ISS)  6/10/2003 DONE
CHANGED STATUS TO ISSUED
Override - Parcel Holds  6/10/2003  
Plan assigned to (JCM)4/17/2003 4/21/2003 PASS
DetailsJohn Menard
4/21/2003 11:20:03 JCM - activity updated through activity BLDA022 from case BLD03-00250.
Plan Reviewer's activity  4/21/2003 PASS
Reviewed and approved plan modification to remove a structural column and extend the existing structural beam. The structural modifications were reviewed and approved by an outside consulting structural engineer. JCM
PLANS/APPL TAKEN TO FRONT DESK  4/21/2003 PASS
Override - Parcel Holds  4/21/2003  
Override - Parcel Holds  4/21/2003  
Inspection Record Card- Bld  4/21/2003 DONE
Telephone Call  4/21/2003  
LEFT MESS THAT PERMIT IS READY
Plans ACCEPTED BY PLAN TECH  4/17/2003 DONE
Plan modification
Received Certificate of Value  4/17/2003 DONE
For plan modification of 4/17/03
Plan Modification Accepted  4/17/2003 DONE
Plans were submitted as resubs on 4/9/03 and changed to plan mod on 4/17/03 after all sets were submitted. kmm
Routing Off Site - STRUCTURAL4/16/2003 4/14/2003 PASS
Contacted PDQ to take (plan modification) to outside engineering.
Telephone call  4/11/2003 DONE
Called and left message with Eric McArthur that a plan modification form needs to be submitted with $500 fee.
Plan resubmittals received  4/9/2003 DONE
Received one more set of revised sheets S-102, S-305, (1) changes to structural drawings, (2) addendum Structural Calculations, (1) cover letter, and transmittal. Routed to Tom Aroraci. Changed to plan mod. on 4/17/03
Inspection Record Card- Bld  4/8/2003 DONE
Issue PAID IN FULL permit  4/8/2003 DONE
Plan resubmittals received  4/8/2003 DONE
Received two sets of S-102, S-305, (1) changes to structural drawings, (2) addendum Structural Calculations, (1) cover letter, and transmittal. Routed to Tom Aroraci. Changed to plan mod on 4/17/03
Plan resubmittals received  4/2/2003 DONE
Received three copies of revised sheets S-101, S-102, S-303, S-304, routed to John M. kmm
Routing - PLAN CHECK3/12/2003 3/13/2003  
taken to John M.
Routing - Erosion and Sediment3/13/2003 3/13/2003 PASS
ESC approved with attached conditions.
Routing - PLAN CHECK3/13/2003 3/13/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/13/2003 PASS
Inspection Record Card- Bld  3/13/2003  
Telephone call  3/13/2003 DONE
LEFT MESS THAT PERMIT IS READY
Plan assigned to (JCM)2/13/2003 3/13/2003 PASS
DetailsJohn Menard
3/13/2003 11:28:50 JCM - activity updated through activity BLDA022 from case BLD03-00250.
Routing - FIRE3/7/2003 3/12/2003 PASS
Routing Off Site - STRUCTURAL3/5/2003 3/10/2003 PASS
Revised drawings and calcs. of 3/5/03 Received letter from consulting structural engineer approving resubmittals. JCM
Plan Reviewer's activity  3/7/2003 PASS
Plans reviewed and approved as submitted with attached comment list. JCM
Routing - PLAN CHECK3/4/2003 3/7/2003 PASS
Plan resubmittals received  3/5/2003 DONE
Received three copies of revised sheets S-001, SD-101, S-101, S-102, S-301, S-302, S-303, S-304. Three copies of struct. calcs. one response letter. Routed two copies of the above information to John M and one copy to outside eng.
Routing - PLANNING3/3/2003 3/4/2003 PASS
Approved per DRH02-00256.
Routing - PLAN CHECK2/25/2003 3/3/2003  
Routing Off Site -Energy2/14/2003 2/28/2003 PASS
called ron oltman for outside energy review. dkl
Plan resubmittals received  2/28/2003 DONE
Received two copies of revised ESC sheet C-101 and two copies of supplemental/requested text write-up for esc plan. Routed to John M. kmm
Plan resubmittals requested  2/26/2003  
Faxed the architect a copy of the structural review comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL2/13/2003 2/26/2003 FAIL
called pdq to take to outside engineering. dkl Received a comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLUMBING2/21/2003 2/25/2003 PASS
GROUND WORK IS FOR FUTURE TI.
Routing - PLANNING2/20/2003 2/21/2003 FAIL
The landscape plan for the Donor Garden and surrounding area has not been provided as required in DRH02-256. Rick Hunter of HDR (###-####) has been notified.
Routing - Erosion and Sediment2/19/2003 2/20/2003 FAIL
ESC plan not sufficient--contacted plan designer-- informed him to re-do and resubmitt.
Routing - PUBLIC WORKS2/14/2003 2/19/2003 PASS
Additional plans submitted  2/14/2003 DONE
Received 1 more set of plans with signed Registere Design Professional in Responsible Charge. Attached with plans.
Routing - PLANNING Land Div2/13/2003 2/14/2003 PASS
Parcel is over 5 acres in size.
Plans ACCEPTED BY PLAN TECH  2/13/2003 DONE
1. Called Rick Hunter to have the "Design Professionals" sheet completed and faxed back to me as soon as possible and to have 1 more set of plans for energy review.
Pending Assignment by JCM2/13/2003 2/13/2003 DONE
DetailsJohn Menard
2/13/2003 13:07:11 JCM - activity updated through activity BLDA166 from case BLD03-00250.
Application received  2/12/2003  
Recd Pcfee & Taken To Pln CK  2/12/2003 DONE
Fee Review-notes2/12/20032/12/2003   
Routing - PLAN CHECK4/17/2003    
plan modification