Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD03-00268
StatusFinaled
Name TOM MCLEOD CONSTRUCTION
Site Address 3582 N HYACINTH LN
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2114 sq. ft. two story townhouse with a 472 sq. ft. attached two car garage and a 113 sq. ft. concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. (1st floor 1253 sq. ft.)(2nd floor 861 sq. ft.) PC #060 CUP #01-110 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/29/20039/30/20039/30/2003APASS
DetailsTony Young
michael; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
DOC - Permit Finaled9/30/20039/30/20039/30/2003PPASS
DetailsTony Young
Finaled by inspector at 9/30/2003 11:50:58 AM
BLD-Framing/Rough-in7/7/20037/8/20037/8/2003APART
DetailsTony Young
mike smith; Phone #: ###-#### Internet Inspection Request from: Linda Hartwell
energy code inspection, need proper calcs 7/8/2003 10:59:05 AM
BLD-Framing/Rough-in7/3/20037/7/20037/7/2003APASS
DetailsTony Young
michael; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in7/1/20037/1/20037/1/2003PPART
DetailsTony Young
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
seal chases, need truss specs, etc. ,,,,ok to insulate 7/1/2003 5:38:00 PM
BLD-Framing/Rough-in6/2/20036/3/20036/3/2003APART
DetailsTony Young
michael shear panel; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ext. nailing ok, need to verify hds at frame insp. 6/3/2003 1:08:15 PM
BLD-Conference5/21/20035/21/20035/21/2003PPART
DetailsTony Young
MIKE FIRE WALL; Phone #: ###-#### Internet Inspection Request from: Darla Downs
attic ok to place 5/21/2003 3:55:38 PM
BLD-Conference5/14/20035/15/20035/15/2003APART
DetailsTony Young
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
upper firewalls ok to stand 5/15/2003 11:57:28 AM
BLD-Conference5/1/20035/2/20035/2/2003ANR
DetailsTony Young
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Other5/2/20035/2/20035/2/2003PPART
DetailsTony Young
firewall, 1st level ok to stand 5/2/2003 2:22:55 PM
BLD-Foundation3/31/20034/1/20034/1/2003APASS
DetailsJim Sly
FOUND WALL--ED; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Footing3/21/20033/21/20033/21/2003PPART
DetailsTony Young
wip 3/21/2003 3:46:44 PM
BLD-Foundation3/19/20033/19/20033/19/2003PPART
DetailsTony Young
MKIE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
conference on soil only, ok w/ wider ftgs 3/19/2003 3:58:13 PM
Issue PAID IN FULL permit  3/11/2003 DONE
Inspection Record Card- Bld  3/5/2003  
Telephone call  3/5/2003 DONE
left mess that permits are ready
Plan assigned to (DJO)3/4/20033/4/20033/4/2003 PASS
DetailsDan Overy
3/4/2003 14:59:46 DJO - activity updated through activity BLDA022 from case BLD03-00268.
PLANS/APPL TAKEN TO FRONT DESK  3/4/2003 DONE
Case Summary (BLD)  3/4/2003 DONE
Plan Review Report  3/4/2003 DONE
Plans ACCEPTED BY PLAN CHECK  3/4/2003  
Routing - PUBLIC WORKS2/18/2003 2/18/2003 PASS
Routing - PLANNING2/14/2003 2/18/2003 PASS
Approved as per CUP01-00110.
Application received  2/14/2003  
Pending Assignment by DJO2/14/2003    
DetailsDan Overy
Routing - PLAN CHECK2/18/2003