Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD03-00274
StatusFinaled
Name MERIDIAN JOINT SCHOOL DIST NO 2
Site Address 12435 W USTICK RD
Project NameUstick Elementary
Customer Number 
ePlanReviewNo
Description
(Administration and Library Addition) - To construct a 2,086 sq. ft. one story Type VB addition to existing elementary school offices. Other work includes all site improvements and landscaping per approved plans and attachments.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection12/18/200612/18/200612/21/2006 DEFR
DetailsJim Sly
Sent to Fire for final......
BLD-Aging Inspection10/6/200610/6/200610/13/2006 DONE
DetailsJim Sly
Talked to Ed ###-#### Same as prev. note.
BLD-Aging Inspection5/31/20065/31/20066/1/2006 PEND
DetailsJim Sly
Talked to Ed ###-#### Cannot find where fire signed off. Told him to call for fire final and see if fire insp can remember what and why?
BLD-Final7/31/20038/1/20038/1/2003APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 7/31/2003 at 8:16:54 AM. Contact: ###-####. OK for Perm Occ. 8/1/2003 12:58:51 PM
Code Occupancy Approval  7/31/2003 PASS
FINAL SIGNED OFF.
FIRE-Alarm Testing7/23/20037/29/20037/28/2003PCANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 7/23/2003 at 9:45:41 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 28 2003 7:26AM.
BLD-Framing/Rough-in7/28/20037/28/20037/28/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 7/28/2003 at 7:25:34 AM. Contact: ###-####.
BLD-Framing/Rough-in6/26/20036/27/20036/27/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/26/2003 at 12:30:39 PM. Contact: ###-####.
BLD-Framing/Rough-in6/25/20036/25/20036/25/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/25/2003 at 7:22:36 AM. Contact: ###-####. OK to cover 90%....Need to check interior 1hr rated walls. 6/25/2003 4:51:48 PM
BLD-Conference6/20/20036/20/20036/20/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/20/2003 at 10:28:07 AM. Contact: ###-####.
BLD-Framing/Rough-in6/13/20036/16/20036/16/2003APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/13/2003 at 12:56:06 PM. Contact: ###-####. Roof nailing and 1hr wall OK to cover both sides at top. Storage/ library. 6/16/2003 12:03:28 PM
BLD-Framing/Rough-in6/9/20036/9/20036/9/2003APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/9/2003 at 7:02:53 AM. Contact: ###-####. Trusses and attachment to masonry walls (straps).....OK. 6/9/2003 12:55:42 PM
BLD-Footing4/28/20034/29/20034/29/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/28/2003 at 9:26:03 AM. Contact: ###-####. E and W walls of front addition....N. wall Req further excavation and testing....all of rear (addition) and pad footings OK pending special insp and approvals. 4/29/2003 2:29:07 PM
Override - Parcel Holds  4/15/2003  
Issue PAID IN FULL permit  4/15/2003 DONE
Override - Parcel Holds  4/10/2003  
Inspection Record Card- Bld  4/10/2003  
Print Occupancy Form  4/10/2003  
PLANS/APPL TAKEN TO FRONT DESK  4/9/2003 DONE
Routing Off Site - STRUCTURAL3/26/2003 4/9/2003 PASS
Resubmittals faxed to outside engineer for review.
Plan assigned to (MLO)2/18/2003 4/9/2003 PASS
DetailsMike Otto
4/9/2003 16:11:35 MLO - activity updated through activity BLDA022 from case BLD03-00274.
Routing - FIRE4/1/2003 4/7/2003 PASS
DetailsBill Alexander
Routing Off Site -Energy3/28/2003 4/3/2003 PASS
Energy resubmittal given to Mike Otto has been forwarded to Ron Oltman for review. MLO
Routing - PLAN CHECK4/1/2003 4/1/2003 PASS
Routing - PLANNING4/1/2003 4/1/2003 PASS
re route to planning to have plans signed off. MLO
Routing - Erosion and Sediment3/31/2003 4/1/2003 PASS
ESC approved with attached conditions--RP TO BE DETERMINED PRIOR TO CONSTRUCTION.
Routing - PLANNING3/26/2003 3/31/2003 PASS
Mark Pecchenino
Routing - PLANNING3/31/2003 3/31/2003 PASS
Approved per CUP03-00019 Mod 1 on March 10, 2003. Appeal time expired on March 20, 2003 5:00 PM. Mark Pecchenino

Angie Brosious Needs conditional use modification application. Called and left a message for Eric Peterson.
Plan resubmittals received  3/28/2003 DONE
Received one copy of load calculations. Routed to Mike Otto.
Plan Reviewer's activity  3/28/2003 DONE
Plan resubmittal was sent to me on 3/24/2003 for review. three other projects in front of resubmittal. I was out sick 1/2 24th through 26th. Upon return plans had been taken out of my office and routed to planning on the 26th per request of architects office. All paper work for project was sent to planning with plans.
Routing Off Site -Energy3/26/2003 3/27/2003 FAIL
Resubmittals e-mailed to Ron Oltman for rereview. Corrections faxed and mailed to architect
Plan resubmittals received  3/21/2003 DONE
Received three sets of resubmittal sheets A2.0, A3.0, A8.0, (3) Structural Calculations, (1) EI letter for comment responses, (1) United Water letter, (1) Certificate of Value, and response letter with transmittal. Routed to Mike Otto.
Routing - FIRE3/13/2003 3/20/2003 FAIL
Review comments faxed to architect, which include resubmittal requirements
Plan resubmittals requested  3/13/2003 DONE
plan check, structural and energy review comments
Routing Off Site -Energy2/19/2003 3/12/2003 FAIL
called ron oltman for outside energy review. dkl corrections faxed and mailed to architect
Routing Off Site - STRUCTURAL2/18/2003 3/12/2003 FAIL
called pdq to take to outside engineering. dkl corrections faxed and mailed to architect
Routing - PLAN CHECK3/3/2003 3/12/2003 FAIL
corrections faxed and mailed to architect
Additional plans submitted  3/7/2003 DONE
Received four copies of ESC plan sheets EC-1. Routed two copies to Mike O. and put two copies in hold box. kmm
Plan resubmittals received  3/5/2003 FAIL
Plans not signed. Contacted Darrin Gilbert of Pinnacle. Plans on table. kmm
Routing - PLUMBING2/26/2003 3/3/2003 PASS
7.0686" of venting required, note on pouring space around roof drains with grout-dont, page A0.2 shows an existing sewer service line under the addition extending to an existing classroom building, this line must be of materials approved for inside a building.
Routing - Erosion and Sediment3/3/2003 3/3/2003 FAIL
Waiver Letter--Waiver denied--Plan will be required.
Routing - PUBLIC WORKS2/18/2003 2/26/2003 PASS
Override - Parcel Holds  2/18/2003  
Routing - PLANNING Land Div2/18/2003 2/18/2003 PASS
Site is over 5 acres in size.
Plans ACCEPTED BY PLAN TECH  2/18/2003 DONE
1. Accept civil/drainage plans as is per Brian Murphy.
Pending Assignment by JCM2/18/2003 2/18/2003 DONE
DetailsJohn Menard
2/18/2003 10:47:50 JCM - activity updated through activity BLDA174 from case BLD03-00274.
Application received  2/14/2003  
Override - Parcel Holds  2/14/2003  
Recd Pcfee & Taken To Pln CK  2/14/2003 DONE
Override - Parcel Holds  2/14/2003  
Fee Review-notes2/14/20032/14/2003