Permit Information
Permit NumberBLD03-00301
StatusFinaled
Name BASILIO'S MEXICAN RESTAURANT
Site Address 8061 W FAIRVIEW AVE
Project NameSHOPKO PLAZA
Customer Number 
ePlanReviewNo
Description
(BASILIO'S MEXICAN RESTAURANT) This building is fire sprinklered for building area increase. To remodel an existing 2,360 square foot restaurant tenant space for a new tenant. The dining area has a floor area of 1,220 square feet. Work is to include interior nonbearing walls, grease hood and duct, and interior finishes all per the approved drawings and plan review report on file. The occupant load of the dining room (81) shall be posted in a conspicuous place near the main exit. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes8/14/20038/14/20038/14/2003 DONE
First Notice 8/1/20038/1/2003 DONE
Permanent occupancy  8/1/2003 DONE
Perm. Occ. Cert. #9756 issued 8-1-03 to Basilio's Mexican Restaurant.
Permanent Occupancy 7/22/20037/22/2003 DONE
Details
BLD-Final7/22/20037/22/20037/22/2003PPASS
DetailsRuss Owen
PETE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows. Ok perm oc. 7/23/2003 9:36:27 AM
FIRE-Final Inspection7/3/20037/3/20037/3/2003PPASS
DetailsTroy Cobbley
Fire alarm, fire sprinkler and fire life safety finaled. Fire alarm system is complete
FIRE-Final Inspection5/16/20035/16/20035/16/2003APASS
DetailsTroy Cobbley
Fire life safety finaled
BLD-Final5/8/20035/9/20035/9/2003AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 5/8/2003 at 10:50:55 AM. Contact: ###-####.Would be ok for an occupancy if fire life safety would approve. Not approved at this time due to this. 5/9/2003 10:31:08 AM
FIRE-Final Inspection5/9/20035/9/20035/9/2003PPART
DetailsTroy Cobbley
A temp occupancy was given with Dave Millers permission until the fire alarm system for the shopco plaza has been inspected and approved. Fire sprinkler is finaled. Fire alarm has a temp. Fire life safety is ok except for the office door handle is not approved type. Since the south HVAC unit did not work I had Gary, the superintendant, lock out the unit until it can be repaired and reinspected
Temporary occupancy  5/9/2003 DONE
Temporary Occupancy #4951 issued 05/09/03 to Basilio's Mexican Restaurant
FIRE-Final Inspection5/8/20035/8/20035/8/2003PFAIL
DetailsTroy Cobbley
Fire alarm issues have not been corrected and the door hardware to the office still needs changed 5/8/2003 3:11:18 PM
FIRE-Final Inspection5/6/20035/7/20035/7/2003PFAIL
DetailsTroy Cobbley
Could not connect the hood system to the fire alarm because fire alarm system is not complete yet. Painted sprinkler heads and canopies through out tenant space. Provide approved door hardware on the office door in kitchen area 5/7/2003 3:47:19 PM
BLD-Framing/Rough-in5/6/20035/6/20035/6/2003PPART
DetailsRuss Owen
gary; Phone #: ###-#### Internet Inspection Request from: Annette MooreOk to place tile. 5/6/2003 5:47:35 PM
BLD-Framing/Rough-in4/21/20034/21/20034/21/2003PPART
DetailsRuss Owen
hood shaft ###-####posted c/n for support clairification. 4/22/2003 10:25:50 AM
BLD-Framing/Rough-in4/18/20034/18/20034/18/2003PNH
DetailsRuss Owen
###-####
BLD-Framing/Rough-in4/18/20034/18/20034/18/2003PNH
DetailsRuss Owen
###-#### hood shaft
BLD-Framing/Rough-in4/16/20034/17/20034/17/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 4/16/2003 at 12:18:00 PM. Contact: ###-####.Ok pending plumbing inspection posted c/n . 4/18/2003 10:37:25 AM
Issue PAID IN FULL permit  4/2/2003 DONE
Plan assigned to (CJW)2/21/2003 3/25/2003 PASS
DetailsCarl Westfall
3/25/2003 08:02:49 CJW - activity updated through activity BLDA022 from case BLD03-00301.
Routing - PLAN CHECK3/24/2003 3/25/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/25/2003 PASS
Inspection Record Card- Bld  3/25/2003  
Print Occupancy Form  3/25/2003  
Telephone call  3/25/2003 DONE
LEFT MESS THAT PERMIT IS READY
Routing - FIRE3/18/2003 3/24/2003 PASS
approved with CONDITIONS to be field verified
Routing - PLAN CHECK2/25/2003 3/18/2003 PASS
UBC plan review started March 13, 2003 and finished March 18, 2003. The drawings were approved with conditions. See the plan review report.
Routing - PUBLIC WORKS2/21/2003 2/25/2003 PASS
Routing - PLUMBING2/25/2003 2/25/2003 PASS
ICE MACHINE AND SODA MACHINE MAY REQUIRE ADDITIONAL BACKFLOW PROTECTION.
Plans ACCEPTED BY PLAN TECH  2/20/2003 DONE
No outside energy review required per Marlene. kmm
Application received  2/19/2003  
Recd Pcfee & Taken To Pln CK  2/19/2003 DONE
Fee Review-notes2/19/20032/19/2003