Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-00309
StatusFinaled
Name MCDONALD'S (AIR TERMINAL)
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT
Customer Number 
ePlanReviewNo
Description
(MCDONALD'S RESTAURANT - BOISE AIR TERMINAL - CONCOURSE B EXPANSION) This building is fire sprinklered for building area increase (2000 IBC). To construct a 764 square foot "McDonald's" restaurant within "Concourse B Expansion" at the Boise Air Terminal. The kitchen area has a floor area of about 483 square feet (3 occupants) and the dining area has a floor area of about 281 square feet (19 occupants). The old location of the "McDonald's" restaurant in the air terminal is being demolished. Work is to include interior nonbearing walls, a vertical rolling security grill, suspended ceilings, mill work, a grease hood and duct, and interior finishes all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes8/14/20038/14/20038/14/2003 DONE
Permanent Occupancy 7/29/20037/29/2003 DONE
Details
BLD-Final7/29/20037/29/20037/29/2003 DONE
Ok/final per Alan's previous inspection
First Notice 7/29/20037/29/2003 DONE
Permanent occupancy  7/29/2003 DONE
Perm. Occ. Cert. #9746 issued 7-29-03 to McDonald's at the airport.
Plan resubmittals received  7/3/2003 DONE
Received two copies of revised sheets P1.0. Routed to Bill V. kmm
Temporary occupancy  7/1/2003 DONE
Temp. Occ. Cert. #4966 issued 7-1-03 to McDonald's at the Boise Airport.
BLD-Final6/27/20036/30/20036/30/2003PPART
DetailsAlan Hauser
all ok except waiting for plbg. final, only temp. at this time 7/1/2003 12:22:58 AM
FIRE-Final Inspection6/30/20036/30/20036/30/2003PPASS
DetailsRick Jackson
BLD-Framing/Rough-in6/18/20036/19/20036/19/2003APART
DetailsJim Storey
ROD; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok pending others. 6/19/2003 10:59:12 AM
BLD-Conference6/11/20036/12/20036/12/2003APASS
DetailsJim Storey
conf 6/12/2003 1:17:47 PM
BLD-Conference6/11/20036/11/20036/11/2003PCANC
DetailsJim Storey
rod; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in6/9/20036/9/20036/9/2003PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/9/2003 at 7:08:05 AM. Contact: ###-####.
BLD-Framing/Rough-in6/9/20036/9/20036/9/2003PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/9/2003 at 7:08:05 AM. Contact: ###-####. office called. 6/9/2003 4:57:33 PM
Issue PAID IN FULL permit  6/6/2003 DONE
Inspection Record Card- Bld  3/27/2003 DONE
Print Occupancy Form  3/27/2003 DONE
Telephone call  3/27/2003 DONE
permit ready and fees due
Routing - FIRE3/21/2003 3/26/2003 PASS
Routing - PLAN CHECK3/26/2003 3/26/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/26/2003 PASS
Plan assigned to (CJW)2/24/2003 3/26/2003 PASS
DetailsCarl Westfall
3/26/2003 16:11:37 CJW - activity updated through activity BLDA022 from case BLD03-00309.
Routing - PLAN CHECK2/26/2003 3/21/2003 PASS
UBC plan review started March 19, 2003 and finished March 21, 2003. The drawings were approved with conditions. See the conditions list.
Routing - PLUMBING2/25/2003 2/26/2003 PASS
3 compartment sink must have an indirect waste connection, additional cross connection protection may be required, if an autoimatic soap dispensor is installed at the mop sink, provide a water supply for it.
Routing - PUBLIC WORKS2/24/2003 2/25/2003 PASS
Application received  2/21/2003  
Recd Pcfee & Taken To Pln CK  2/21/2003 DONE
Plans ACCEPTED BY PLAN TECH  2/21/2003 DONE
Routing Off Site -Energy2/21/2003 2/21/2003 DONE
No outside energy review required per Carl W. kmm
Fee Review-notes2/21/20032/21/2003