BLD-Final | 6/23/2004 | 6/23/2004 | 6/23/2004 | A | PASS |
Troy James
|
|
|
|
DOC - Permit Finaled | 6/23/2004 | 6/23/2004 | 6/23/2004 | A | PASS |
Troy James
|
|
|
Finaled by inspector at 6/23/2004 9:52:28 AM
|
BLD-Final | 6/21/2004 | 6/21/2004 | 6/21/2004 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/21/2004 at 7:36:12 AM. Contact: ###-####. Need to install step missing and landing to exterior door east side. Need to complete as much as possible setting fixtures and appliances, etc. 6/21/2004 11:28:41 AM
|
BLD-Conference | 4/12/2004 | 4/12/2004 | 4/12/2004 | P | DONE |
Dave Hannah
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Conference | 3/8/2004 | 3/9/2004 | 3/9/2004 | A | DONE |
Dave Hannah
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Conference | 2/9/2004 | 2/9/2004 | 2/9/2004 | P | DONE |
Dave Hannah
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 12/22/2003 | 12/22/2003 | 12/22/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/22/2003 at 7:20:22 AM. Contact: ###-####. ok to cover 12/22/2003 11:00:30 AM
|
BLD-Other | 12/22/2003 | 12/22/2003 | 12/22/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/22/2003 at 7:25:56 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/17/2003 | 12/17/2003 | 12/17/2003 | P | PASS |
Jim Storey
|
|
|
DAVID; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Energy code compliance | 12/9/2003 | 12/10/2003 | 12/10/2003 | A | CANC |
Dave Hannah
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Energy code compliance | 12/10/2003 | 12/10/2003 | 12/10/2003 | P | PART |
Dave Hannah
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover int shear walls 12/10/2003 5:32:56 PM
|
BLD-Energy code compliance | 12/9/2003 | 12/9/2003 | 12/9/2003 | P | NR |
Troy James
|
|
|
David; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 11/21/2003 | 11/24/2003 | 11/24/2003 | A | PART |
Tony Young
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ok to start insulation, t/w contractor to call for inspection when special type of insulation is started so we can verify and approve of product, see jerry for correction notice.
strap beam/top plates, tighten bolts, fire block areas that wont be foam in place 11/24/2003 12:15:04 PM
|
BLD-Framing/Rough-in | 11/12/2003 | 11/13/2003 | 11/13/2003 | A | PART |
Dave Hannah
|
|
|
c/n items on shear done 11/13/2003 8:57:32 AM
|
BLD-Framing/Rough-in | 11/12/2003 | 11/12/2003 | 11/12/2003 | P | CANC |
Russ Owen
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Annette Moore Out of time 11/12/2003 12:21:14 AM
|
BLD-Framing/Rough-in | 10/15/2003 | 10/15/2003 | 10/15/2003 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/15/2003 at 9:08:53 AM. Contact: ###-####. needs to finish nailing and bolting down hold downs 10/16/2003 8:05:05 AM
|
BLD-Conference | 9/30/2003 | 10/1/2003 | 10/1/2003 | A | DONE |
Dave Hannah
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 9/5/2003 | 9/8/2003 | 9/8/2003 | A | PART |
Dave Hannah
|
|
|
DONALD EXTERIOR SHEER ONLY; Phone #: ###-#### Internet Inspection Request from: Marc Lileks west unit ok to cover ext 9/8/2003 9:56:28 AM
|
BLD-Concrete | 8/7/2003 | 8/7/2003 | 8/7/2003 | P | PART |
Steven Webb
|
|
|
###-#### east side 2nd floor deck, wip. 8/7/2003 3:05:13 PM
|
BLD-Conference | 7/16/2003 | 7/17/2003 | 7/17/2003 | A | DONE |
Dave Hannah
|
|
|
###-#### david
|
BLD-Conference | 7/15/2003 | 7/15/2003 | 7/15/2003 | P | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/15/2003 at 8:08:14 AM. Contact: ###-####. need to rerun energy code calcs 7/15/2003 2:34:58 PM
|
BLD-Conference | 6/26/2003 | 6/26/2003 | 6/26/2003 | P | DONE |
Dave Hannah
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Foundation | 5/14/2003 | 5/14/2003 | 5/14/2003 | P | PART |
Dave Hannah
|
|
|
darren; Phone #: ###-#### Internet Inspection Request from: Barbara Moore work in progress 5/14/2003 5:19:01 PM 5/14/2003 5:19:17 PM
|
BLD-Foundation | 5/9/2003 | 5/12/2003 | 5/12/2003 | A | CANC |
Dave Hannah
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Footing | 5/9/2003 | 5/9/2003 | 5/9/2003 | P | PART |
Tony Young
|
|
|
darren; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
wip 5/9/2003 2:15:56 PM
|
BLD-Conference | 4/21/2003 | 4/21/2003 | 4/21/2003 | P | FAIL |
Dave Hannah
|
|
|
issued a stop work
|
Inspection Record Card- Bld | | | 4/10/2003 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/10/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/21/2003 | | DONE |
|
|
|
|
Telephone call | | | 3/21/2003 | | DONE |
|
|
|
permit ready
|
Routing - PLAN CHECK | 3/5/2003 | | 3/21/2003 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 3/10/2003 | | 3/21/2003 | | PASS |
Steve Munroe
|
|
|
3/21/2003 09:54:54 SAM - activity updated through activity BLDA022 from case BLD03-00311.
|
Plan Review Report | | | 3/20/2003 | | |
|
|
|
|
Plan Reviewer's activity | | | 3/11/2003 | | PEND |
|
|
|
3/11/03 08:05 I called and left a message on Elizabeth's phone. I let her know that I would like to meet with her and Tom to get these plans fixed.
|
Pending Assignment by DJO | 2/21/2003 | | 3/10/2003 | | DONE |
Dan Overy
|
|
|
3/10/2003 11:16:10 SAM - activity updated through activity BLDA183 from case BLD03-00311.
|
Routing - PUBLIC WORKS | 3/3/2003 | | 3/4/2003 | | PASS |
|
|
|
NEW DUPLEX: 803 E BANNOCK/116 STRAUGHAN:DAVID ERNAT OWNER ###-####
|
Routing - PLANNING | 3/3/2003 | | 3/3/2003 | | PASS |
|
|
|
Scott Spjute passed after conference w/ Elizabeth Cooper 2/28/03 --midpoint of peak under 35' tall. Fence will require sep. approval for variance.
|
Routing - PLANNING | 2/21/2003 | | 2/26/2003 | | FAIL |
|
|
|
Consult w/ T. Records, A. Brosious & S. Spjute: phoned E. Cooper (named as principal contact) & requested grading plan specifics to determine full extend of finished ground & elevations.--failed due to actual ht. of 36' tall. Fence also too tall. aKT
|
Application received | | | 2/21/2003 | | |
|
|
|
|