Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-00312
StatusFinaled
Name GABRIELLI BUILDS INC
Site Address 769 N ASHTREE WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 3357 sq. ft. two story single family dwelling with a 846 sq. ft. attached three car garage, a 82 sq. ft. partially covered entry porch and 334 sq. ft. of concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible space shall be maintained. (1st floor 1719 sq. ft.)(2nd floor 1638 sq. ft.) PC #085 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/16/20037/16/20037/16/2003PPASS
DetailsDave Hannah
tony..; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows c.c # 23957 issued 7/16/2003 1:29:04 PM
DOC - Permit Finaled7/16/20037/16/20037/16/2003PPASS
DetailsDave Hannah
Finaled by inspector at 7/16/2003 1:29:06 PM
BLD-Grading Inspection7/15/20037/15/20037/15/2003 BND
DetailsRita DeYoung
FINAL GRADING AND DRAINAGE IS COMPLETE AND APPROVED. REVEGETATION IS NOT AND FOR THIS THE ENGINEER HAS RECOMMENDED A $300.00 BOND. UPON RECEIPT OF THE BOND THE GRAIDNG AND DRAINAGE IS CONDITIONALLY APPROVED.
BLD-Energy code compliance5/15/20035/15/20035/15/2003PPASS
DetailsDave Hannah
TONY ###-#### ok to cover 5/15/2003 4:09:17 PM
BLD-Energy code compliance5/14/20035/14/20035/14/2003PFAIL
DetailsRuss Owen
tony; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. posted c/n hook up all bathroom fans and vapor barrier in upper bathroom and lower florr front room areas. c/n posted at front window . 5/14/2003 4:11:29 PM
BLD-Framing/Rough-in5/9/20035/12/20035/12/2003APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/9/2003 at 11:40:54 AM. Contact: ###-####. ok to insulate 5/12/2003 11:31:22 AM
BLD-Framing/Rough-in4/25/20034/25/20034/25/2003PPART
DetailsDave Hannah
tony; Phone #: ###-#### Internet Inspection Request from: Annette Moore shear ok to cover ext 4/25/2003 3:38:56 PM
BLD-Foundation3/31/20033/31/20033/31/2003APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/31/2003 at 7:15:06 AM. Contact: ###-####.
BLD-Footing3/27/20033/28/20033/28/2003APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/27/2003 at 9:20:04 PM. Contact: ###-####.
BLD-Grading Inspection3/28/20033/28/20033/28/2003 PASS
DetailsRita DeYoung
Footing subgrade has been approved by the geotechnical engineer
Issue & PRINT permit  3/17/2003 DONE
Plan assigned to (DJO)3/14/20033/14/20033/14/2003 PASS
DetailsDan Overy
3/14/2003 09:03:34 DJO - activity updated through activity BLDA022 from case BLD03-00312.
PLANS/APPL TAKEN TO FRONT DESK  3/14/2003 DONE
Case Summary (BLD)  3/14/2003 DONE
Plan Review Report  3/14/2003 DONE
Inspection Record Card- Bld  3/14/2003  
Telephone call  3/14/2003 DONE
LEFT MESS THAT PERMIT IS READY
Plans ACCEPTED BY PLAN CHECK  3/14/2003  
Routing - FIRE2/27/2003 2/28/2003 DONE
Fire sprinklers are not required. Fire hydrants shall be provided and approved by the FD in accordance with the 8/23/2001 memorandum re. subdivision approval from D. Miller, BCFD.
Routing - Erosion and Sediment2/26/2003 2/27/2003 PASS
ESC approved with attached conditions.
Routing - PLANNING2/25/2003 2/26/2003 PASS
Routing - PUBLIC WORKS2/24/2003 2/25/2003 PASS
Routing - PUBLIC WORKS GRADING2/21/2003 2/24/2003 PASS
DetailsRita DeYoung
APPROVED AS CATEGORY 3 WITH CONDITIONS OF APPROVAL IN LETTER ATTACHED TO THE PLANS AND THIS CASE
Application received  2/21/2003  
Pending Assignment by DJO2/21/2003    
DetailsDan Overy
Routing - PLAN CHECK2/28/2003