Permit Information
Permit NumberBLD03-00319
StatusFinaled
Name TATES RENTS INC
Site Address 10250 W FAIRVIEW AVE
Project NameTates Rents storage cover add
Customer Number 
ePlanReviewNo
Description
Tates Rents * To attach a 640 sq. ft. aluminum storage canopy to an existing rental/storage building. Work to include anchoring to the existing building. All construction per the approved polans and attached engineering stamped as resubmittal 4/28/03. MJP PC#075-03 DRH03-00003
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 12/11/20034/26/2005 DONE
DOC - Permit Finaled12/11/200312/11/200312/11/2003PPASS
DetailsJim Sly
Finaled by inspector at 12/11/2003 1:58:35 PM
BLD-Final12/11/200312/11/200312/11/2003PPASS
DetailsJim Sly
###-####- rod New Eng for freestanding canopy OK....slab 6" ....OK. 12/11/2003 1:58:28 PM
FIRE-Sprinkler Rough-in11/13/200311/14/200311/14/2003APASS
DetailsTroy Cobbley
###-####- rod Fire life safety finaled 11/14/2003 10:34:00 AM
BLD-Conference10/29/200310/29/200310/29/2003PPART
DetailsJim Sly
andy; Phone #: ###-#### Internet Inspection Request from: Annette Moore C/N Verify 6" slab....Resubmit shows column conn to slab but no details for connection to existing bldg....Eng to provide stamped detal .... Need fire and zoning final prior to struct......Cert of Compl OK when complete. 10/29/2003 1:06:24 PM
BLD-Framing/Rough-in9/5/20039/8/20039/8/2003AFAIL
DetailsJim Sly
rod; Phone #: ###-#### Internet Inspection Request from: Annette Moore 9/8/2003 11:04:31 AM C/N...No insp of installed canopy....Not per appr plan. 9/8/2003 11:08:49 AM
BLD-Aging Inspection9/5/20039/5/20039/5/2003 FAIL
DetailsJim Sly
Dennis at Tates...###-####......Patio covers Unlimited did the work.
talked to Rob....will call in an insp. 9/5/2003 10:21:10 AM 9/5/2003 2:34:33 PM
Issue PAID IN FULL permit  5/9/2003  
Routing - PLAN CHECK3/21/2003 5/7/2003 PASS
Plan assigned to (M_P)2/24/2003 5/7/2003 PASS
DetailsMike Phillips
5/7/2003 09:47:38 M_P - activity updated through activity BLDA022 from case BLD03-00319.
PLANS/APPL TAKEN TO FRONT DESK  5/7/2003 DONE
Print Pending Permit.LaserJet4  5/7/2003 DONE
Case Summary (BLD)  5/7/2003 DONE
Inspection Record Card- Bld  5/7/2003  
Telephone call  5/7/2003 DONE
left mess that permit is ready
Plan resubmittals received  4/28/2003 DONE
Received one copy of response letter. Three copies of revised sheets S1.0 S2.0, and calcs. Routed to Mike P. kmm
Routing - PLANNING3/21/2003 3/21/2003 PASS
Sarah is ready to sign off. kmm
Approved per DRH03-3.
Routing - FIRE3/14/2003 3/20/2003 PASS
Print permit w/o conditions  3/14/2003  
Routing - PLAN CHECK2/28/2003 3/14/2003 FAIL
PLan review completed, sent correction report to contractor requesting additional information for further review prior to issuing permit.
Routing - Erosion and Sediment2/27/2003 2/28/2003 DONE
Per BCC 8-17 an ESC permit not required for this project.
Routing - PLANNING2/26/2003 2/27/2003 FAIL
DRH03-00003 - Does not have a site plan showing the required parking spaces.
Routing - PUBLIC WORKS2/25/2003 2/26/2003 PASS
Plans ACCEPTED BY PLAN TECH  2/24/2003 PEND
Rod will be faxing Arch/ Eng. record form and letter about ESC not being required per Jim R. kmm
Plan routing begun/NEW & ADDTN  2/24/2003  
Routing - PLANNING Land Div2/24/2003 2/24/2003 PASS
Approved. ROS 0176. Existing building on site.
Application received  2/24/2003  
Recd Pcfee & Taken To Pln CK  2/24/2003 DONE
Fee Review-notes2/24/20032/24/2003