First Notice | | 10/3/2003 | 10/3/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/29/2003 | | DONE |
|
|
|
Perm. Occ. cert. #9820 issued 9-29-03 to Cable One, Inc.
|
Permanent Occupancy | | 8/11/2003 | 8/11/2003 | | DONE |
|
|
|
|
BLD-Final | 8/11/2003 | 8/11/2003 | 8/11/2003 | P | PASS |
Russ Owen
|
|
|
###-#### ok for a perm oc. 8/12/2003 10:29:30 AM
|
BLD-Final | 7/31/2003 | 8/1/2003 | 8/1/2003 | P | PART |
Russ Owen
|
|
|
###-#### REINSPECTION Ok temp oc only item is conference table 34 high max. Special inspection ok final letter. 8/1/2003 3:10:10 PM
|
Temporary occupancy | | | 8/1/2003 | | DONE |
|
|
|
Temp. Occ. Cert. #4979 issued 8-1-03 to Cable One.
|
PubWorks Occupancy Approval | | | 7/31/2003 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 7/31/03. S.Landaluce
|
Code Occupancy Approval | | | 7/31/2003 | | PASS |
|
|
|
ALL IN AS REQUIRED BUT ADDED A 2ND H.C. VAN PARKING SPACE SO TOTAL NOW ONLY 5.
|
BLD-Conference | 7/29/2003 | 7/30/2003 | 7/30/2003 | A | PART |
Russ Owen
|
|
|
###-####. snack bar to high in conference room also need final approval letter from special inspector. And all required signatures . 7/30/2003 11:09:39 AM
|
FIRE-Final Inspection | 7/25/2003 | 7/28/2003 | 7/28/2003 | P | PASS |
Rick Jackson
|
|
|
martin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
FIRE-Final Inspection | 7/24/2003 | 7/25/2003 | 7/25/2003 | A | FAIL |
Troy Cobbley
|
|
|
martin; Phone #: ###-#### repair emergency lights and test, provide automatic shutdown for hvac unit #2 and test all duct smoke detectors (contractor did not have the smoke to test with), remove lock from server room door, test the main entry/exit door magnetic locks for operation which were being installed during inspection 7/25/2003 1:49:46 PM
|
BLD-Other | 7/8/2003 | 7/9/2003 | 7/9/2003 | A | NR |
Russ Owen
|
|
|
need to complete. 7/9/2003 12:05:05 PM
|
BLD-Other | 7/9/2003 | 7/9/2003 | 7/9/2003 | P | PASS |
Russ Owen
|
|
|
|
BLD-Framing/Rough-in | 7/7/2003 | 7/8/2003 | 7/8/2003 | P | FAIL |
Russ Owen
|
|
|
martin ceiling grid; Phone #: ###-#### Internet Inspection Request from: Linda Hartwellposted c/n. 7/8/2003 2:44:00 PM
|
BLD-Framing/Rough-in | 5/27/2003 | 5/28/2003 | 5/28/2003 | P | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/20/2003 | 5/21/2003 | 5/21/2003 | P | FAIL |
Russ Owen
|
|
|
martin; Phone #: ###-#### Internet Inspection Request from: Annette Moorec/n posted. 5/22/2003 9:39:17 AM
|
BLD-Framing/Rough-in | 5/8/2003 | 5/9/2003 | 5/9/2003 | A | PASS |
Russ Owen
|
|
|
martain ###-#### shear nailroof 5/9/2003 11:17:24 AM
|
BLD-Framing/Rough-in | 5/7/2003 | 5/7/2003 | 5/7/2003 | P | PART |
Russ Owen
|
|
|
MARTAIN SHEAR NAIL; Phone #: ###-#### Internet Inspection Request from: Darla DownsExt walls only./2003 3:31:30 PM 5/7/2003 3:31:43 PM
|
BLD-Foundation | 4/24/2003 | 4/24/2003 | 4/24/2003 | P | PART |
Russ Owen
|
|
|
MARTIN; Phone #: ###-#### Internet Inspection Request from: Marsha SmylieFoundation insulation is in place. 4/24/2003 4:28:54 PM
|
BLD-Footing | 4/15/2003 | 4/16/2003 | 4/16/2003 | P | PART |
Russ Owen
|
|
|
MARTIN; Phone #: ###-#### Internet Inspection Request from: Darla DownsOut of time but will have s-i inspection. 4/16/2003 4:49:26 PM
|
BLD-Footing | 4/14/2003 | 4/15/2003 | 4/15/2003 | A | PASS |
Russ Owen
|
|
|
MARTIN; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
(F) Reprint permit | | | 4/10/2003 | | |
|
|
|
|
Routing - PUBLIC WORKS | 4/8/2003 | | 4/9/2003 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 4/9/2003 | | 4/9/2003 | | PASS |
|
|
|
Send to ESC after public works. ESC approved with conditions attached to plans.
|
Routing - PLAN CHECK | 4/9/2003 | | 4/9/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/9/2003 | | PASS |
|
|
|
|
Print Occupancy Form | | | 4/9/2003 | | DONE |
|
|
|
|
Telephone call | | | 4/9/2003 | | DONE |
|
|
|
permit ready and need ACHD
|
Issue PAID IN FULL permit | | | 4/9/2003 | | DONE |
|
|
|
|
Routing Off Site -Energy | 4/3/2003 | | 4/9/2003 | | PASS |
|
|
|
Revised plans of 3/18/03 sent to Ron O. kmm
|
Plan assigned to (JCM) | 2/26/2003 | | 4/9/2003 | | PASS |
John Menard
|
|
|
4/9/2003 11:38:29 JCM - activity updated through activity BLDA022 from case BLD03-00335.
|
Routing - PLAN CHECK | 4/2/2003 | | 4/8/2003 | | |
|
|
|
|
Plan Reviewer's activity | | | 4/4/2003 | | PASS |
|
|
|
Reviewed and approved the resubmitted plans with redlined notes and attached plan review comment list. JCM
|
Routing - PUBLIC WORKS | 4/1/2003 | | 4/2/2003 | | FAIL |
|
|
|
requires drainage plan
|
Plan resubmittals received | | | 4/1/2003 | | DONE |
|
|
|
Received two copies of revised sheets A, A-0, A-5, A-7, A-8, S-1, S-2, E-1, E-4, one response letter and two copies of ER-4226. Routed to John M. kmm
|
Routing - FIRE | 3/26/2003 | | 3/31/2003 | | DONE |
|
|
|
Resubmittal acceptable.
|
Routing - PLAN CHECK | 3/21/2003 | | 3/26/2003 | | |
|
|
|
|
Plan resubmittals received | | | 3/26/2003 | | DONE |
|
|
|
Received one copy of United Water Companies flow verification for hydrant at 8450 Benjamin. Sam gave this to me 3/26/03. Routed to John M. kmm
|
Routing - FIRE | 3/14/2003 | | 3/21/2003 | | FAIL |
|
|
|
Water supply info required
|
Plan resubmittals received | | | 3/18/2003 | | DONE |
|
|
|
Received three copies of revised electrical sheets E-1, E-2, E-3, E-4. Not stamped or signed. Three copies of 2000 IECC plan review. Routed to John M. kmm
|
Plan resubmittals requested | | | 3/14/2003 | | |
|
|
|
Mailed the architect a copy of the plan review comment list and a copy of the consulting structural engineers comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 3/7/2003 | | 3/14/2003 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 2/26/2003 | | 3/13/2003 | | PASS |
|
|
|
called pdq to take to outside engeering. dkl Received a comment list from the consulting structural engineer with just a couple of minor items that were resubmitted and reviewed and approved by the plans examiner. JCM
|
Routing Off Site -Energy | 3/5/2003 | | 3/11/2003 | | FAIL |
|
|
|
Called Ron Oltman to take to outside energy review. Bill through IDABO. dkl
|
Routing - PLUMBING | 3/6/2003 | | 3/7/2003 | | PASS |
|
|
|
provide an adequatly sized thermol expantion tank at the water heater, provide a floor drain at the water heater with a trap primer or elevate to pipe required pan drain to mop sink.
|
Routing - PLANNING | 3/5/2003 | | 3/6/2003 | | PASS |
|
|
|
M. Santoyo - Approved for DR per DRH02-237, and as noted on sht. A-0.
K. Gallagher - Pass for CUP02-00142. 3-05-03
|
Plan resubmittals received | | | 3/6/2003 | | DONE |
|
|
|
Received four copies of revised ESC sheet E-1. Routed to John M. kmm
|
Routing - PUBLIC WORKS | 2/27/2003 | | 3/5/2003 | | FAIL |
|
|
|
Requires drainage plan per Brian M.
|
Routing - Erosion and Sediment | 3/5/2003 | | 3/5/2003 | | FAIL |
|
|
|
ESC plan required to contain full size drawings. Informed contact via telephone voice mail.
|
Routing - PLANNING Land Div | 2/26/2003 | | 2/27/2003 | | PASS |
|
|
|
Approved. Portion of Original Lot 1, Block 2 of Westpark Industrial Subdivision left after Westpark Retail Subdivision No. 2 resubdivided a portion of Lot 1, Block 2 of Westpark Industrial Subdivision.
|
Plans ACCEPTED BY PLAN TECH | | | 2/26/2003 | | DONE |
|
|
|
1. Informed applicant that drainage O&M and Calculations might be required. Brian Murphy to call civil engineer.
|
Application received | | | 2/26/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/26/2003 | | DONE |
|
|
|
|
Fee Review-notes | 2/26/2003 | 2/26/2003 | | | |
|
|
|
|