First Notice | | 9/29/2003 | 9/29/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/29/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9817 issued 9-29-03 to Aspen Sound.
|
Permanent Occupancy | | 9/24/2003 | 9/24/2003 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/21/2003 | 8/21/2003 | 8/21/2003 | P | PASS |
Troy Cobbley
|
|
|
fire alarm, fire sprinkler and fire life safety finaled
|
FIRE-Final Inspection | 8/19/2003 | 8/20/2003 | 8/20/2003 | P | FAIL |
Troy Cobbley
|
|
|
matt ###-#### nac circuit not connected yet and the hvac units could not be put in heat mode for testing of the duct smoke detectors 8/20/2003 3:31:59 PM
|
BLD-Conference | 8/12/2003 | 8/13/2003 | 8/13/2003 | A | PASS |
Tom Arcoraci
|
|
|
ok for perm occ see 8-6-03 insp by 407 8/13/2003 8:30:45 AM
|
BLD-Conference | 8/11/2003 | 8/11/2003 | 8/11/2003 | P | CANC |
Russ Owen
|
|
|
out of time. 8/12/2003 5:41:06 PM
|
BLD-Final | 8/6/2003 | 8/6/2003 | 8/6/2003 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/6/2003 at 8:59:33 AM. Contact: ###-####.ok perm oc. 8/6/2003 3:40:16 PM
|
BLD-Final | 7/29/2003 | 7/30/2003 | 7/30/2003 | P | PART |
Russ Owen
|
|
|
Ok for a temp oc as fire life safey has given a temp , my prior c/n is for aportion of counter to be accessable, new c/n posted and called contractor. 7/30/2003 2:48:29 PM
|
Telephone call | | | 7/24/2003 | | DONE |
|
|
|
Talked w/Jerry @ ###-#### re: status of temp. occ. and he will follow up.
|
FIRE-Final Inspection | 5/29/2003 | 5/30/2003 | 5/30/2003 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Dave Millers permission since an upgrade agreement has been reached on upgrading the fire alarm system 5/30/2003 2:55:54 PM
|
BLD-Final | 5/29/2003 | 5/30/2003 | 5/30/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/29/2003 at 3:50:58 PM. Contact: ###-####. Needs accesible counter and fire life safety approval, then possible for a temp oc. 5/30/2003 3:05:24 PM
|
Temporary occupancy | | | 5/30/2003 | | DONE |
|
|
|
Temp. Occ. Cert. #4958 issued 5-30-03 to Aspen Sound.
|
FIRE-Final Inspection | 5/28/2003 | 5/29/2003 | 5/29/2003 | A | FAIL |
Troy Cobbley
|
|
|
Remove the bar locking the double doors in the installation area. Gary said he would install automatic flush bolts 5/29/2003 10:38:45 AM
|
BLD-Final | 5/28/2003 | 5/29/2003 | 5/29/2003 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/28/2003 at 3:56:37 PM. Contact: ###-####.This needs fire life safety prior. 5/29/2003 5:52:59 PM
|
BLD-Other | 5/15/2003 | 5/15/2003 | 5/15/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/15/2003 at 6:12:59 AM. Contact: ###-####. ceiling t grid
|
BLD-Framing/Rough-in | 4/24/2003 | 4/25/2003 | 4/25/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/24/2003 at 4:07:05 PM. Contact: ###-####.
|
Inspection Record Card- Bld | | | 4/11/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/11/2003 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/11/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/2/2003 | | 4/10/2003 | | PASS |
|
|
|
Approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/10/2003 | | PASS |
|
|
|
|
Plan assigned to (CJW) | 3/5/2003 | | 4/10/2003 | | PASS |
Carl Westfall
|
|
|
4/10/2003 10:44:12 CJW - activity updated through activity BLDA022 from case BLD03-00366.
|
Plan resubmittals received | | | 4/4/2003 | | DONE |
|
|
|
received three sets of T1.0, A1.0 A3.0 EN1.0 two copies of a response letter and two copies of a Envelope Compliance Report, Stapley Engineering transmittal\rad
|
Telephone call | | | 4/1/2003 | | DONE |
|
|
|
Spoke with Patrick McKeegan and at his request, to Pete Conlin, Colliers Int'l, regarding conflicting info regarding alarms on plans/application. Was told building now has two existing alarm systems, one in Petco and one in sprinkler riser room, both monitored offsite by differnet companies. Pete indicates AHU duct detectors are required in TI and existing alarm system may not be capable of monitoring; investigating option to modify existing sprinkler monitoring panel or a panel replacement; also trying to get Petco to disconnect their 2nd connection to the sprinkler waterflow switch, to avoid duplicate transmission of sprinkler flow alarms to the FD. Alarm plans will be submitted for whatever mod's are required.
|
Routing - PLAN CHECK | 3/6/2003 | | 3/26/2003 | | |
|
|
|
Failed first UBC review. UBC plan review started March 21, 2003 and finished March 26, 2003. A response from the architect was required. See the plan review report.
|
Routing - FIRE | 3/26/2003 | | 3/26/2003 | | PASS |
|
|
|
See phone notes
|
Routing - PUBLIC WORKS | 3/5/2003 | | 3/5/2003 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/3/2003 | | DONE |
|
|
|
|
Additional plans submitted | | | 3/3/2003 | | DONE |
|
|
|
Received two sets of structural calculations. Attached to plans.
|
Application received | | | 2/28/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/28/2003 | | DONE |
|
|
|
|
Fee Review-notes | 2/28/2003 | 2/28/2003 | | | |
|
|
|
|
Routing Off Site -Energy | 3/5/2003 | | | | |
|
|
|
Called Ron Oltman to take to outside energy review. Bill through IDABO. dkl
|