BLD-Aging Inspection | 5/11/2005 | 5/11/2005 | 5/11/2005 | | CANC |
Tom Arcoraci
|
|
|
|
DOC - Permit Expired | 5/11/2005 | 5/11/2005 | 5/11/2005 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 8/5/2003 | 8/6/2003 | 8/6/2003 | A | NH |
Tom Arcoraci
|
|
|
KEN; Phone #: ###-#### Internet Inspection Request from: Darla Downs 8/6/2003 10:41:14 AM left message on phone permit has been finaled by 407 8/6/2003 10:45:33 AM
|
BLD-Final | 6/25/2003 | 6/26/2003 | 6/26/2003 | A | PASS |
Russ Owen
|
|
|
tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Ok perm oc. 6/26/2003 2:23:29 PM
|
BLD-Final | 6/17/2003 | 6/18/2003 | 6/18/2003 | P | PART |
Russ Owen
|
|
|
don temp occupancy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Ok temp oc , c/n for accessible counter not yet in ,and signage above door to remain unlocked, and round can lights need wire support ceiling tile not in yet. also note the drinking fountain is not going to be installed. 6/18/2003 1:27:24 PM 6/18/2003 1:40:43 PM
|
FIRE-Final Inspection | 6/17/2003 | 6/18/2003 | 6/18/2003 | A | PASS |
Troy Cobbley
|
|
|
###-#### don Fire life safety finaled. Per the owner the hvac system is an 1800 cfm unit, which means no automatic shutdown is required. A lock smith was on the way to remove the thumbturn on the main exit door. Structural inspector to please verify this 6/17/2003 3:34:01 PM
|
FIRE-Final Inspection | 6/13/2003 | 6/16/2003 | 6/16/2003 | A | FAIL |
Rick Jackson
|
|
|
DON; Phone #: ###-#### Internet Inspection Request from: Darla Downs repair east and north exit signs; extinguisher needed; verify air handler - if over 2000 CFM then detectors required; need doors installed to verify hardware; address needed 6/16/2003 10:50:52 AM
|
(F) Reprint permit | | | 6/12/2003 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 5/15/2003 | 5/16/2003 | 5/16/2003 | P | PASS |
Tom Arcoraci
|
|
|
Don ###-#### late after noon for shear; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for cover 5/16/2003 3:53:01 PM
|
BLD-Framing/Rough-in | 5/15/2003 | 5/16/2003 | 5/16/2003 | P | PASS |
Tom Arcoraci
|
|
|
Don ###-#### late after noon for shear; Phone #: ###-#### Internet Inspection Request from: Barbara Moore int shear ok and ok for cover 5/16/2003 3:51:33 PM
|
BLD-Energy code compliance | 5/14/2003 | 5/15/2003 | 5/15/2003 | A | FAIL |
Russ Owen
|
|
|
###-#### don; Phone #: ###-#### Internet Inspection Request from: Annette Moore needs vapor barrier 5/15/2003 3:08:59 PM
|
BLD-Energy code compliance | 5/15/2003 | 5/15/2003 | 5/15/2003 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 5/9/2003 | 5/12/2003 | 5/12/2003 | A | PART |
Russ Owen
|
|
|
DON; Phone #: ###-#### Internet Inspection Request from: Darla DownsWent over general requirements with builder for shear top of wall detail needed and some addn a-35 clips. 5/12/2003 11:49:47 AM
|
Case Summary (BLD) | | | 4/24/2003 | | |
|
|
|
|
Case Summary (BLD) | | | 4/24/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/18/2003 | | |
|
|
|
|
Plan assigned to (DRS) | 3/7/2003 | | 4/16/2003 | | PASS |
Dan Stuart
|
|
|
4/16/2003 13:29:26 DRS - activity updated through activity BLDA022 from case BLD03-00402.
|
Routing - FIRE | 4/14/2003 | | 4/16/2003 | | PASS |
Bill Alexander
|
|
|
04/16/03 - Waiting for information from Armstrong Architects - Tarrie Wagner, on an acceptable time frame when a required hydrant will be installed.
John Lee (United Water) provided details (this date) that a hydrant would probably be installed by July 2003. He said another hydrant south is approximately 270 feet away to center of front property.
|
Routing - PLAN CHECK | 4/16/2003 | | 4/16/2003 | | PASS |
|
|
|
As noted on plans and attached plan review comments from all reviewing agencies.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/16/2003 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/16/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/16/2003 | | |
|
|
|
|
Telephone call | | | 4/16/2003 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Routing - PLAN CHECK | 4/7/2003 | | 4/11/2003 | | PEND |
|
|
|
New resubmittals, comments & copies of Evaluation reports received and inserted into plans. Routing to fire code analyst for re-review.
|
Plan resubmittals received | | | 4/11/2003 | | DONE |
|
|
|
Received three copies of resubmittal sheets A1.0, A2.1, A3.1, E1.0, S1.1, S2.1, (3) United water letter attached with letter addressed to Bill Alexander, [(3) ICBO ER-3568, (3) ER-3850, (3) ER-5275, Report no. 2388, ER-5193 with Memorandum, and (1) cover/comment letter. Routed to Dan Stuart.
|
Plan Review Completed(1st rev) | | | 4/7/2003 | | DONE |
|
|
|
|
Routing - FIRE | 3/31/2003 | | 4/7/2003 | | FAIL |
Bill Alexander
|
|
|
Information on fire hydrant flow requirements, location, battery charging - to verify ventilation for hydrogen gas requirements.
|
Routing Off Site -Energy | 3/7/2003 | | 4/4/2003 | | PASS |
|
|
|
Contacted Eric M. for outside energy review. kmm
4/4/03 - New response from Eric Makela stating he had received satisfactory answers from architect on all issues and energy code review was approved. Copy on plans.
|
Plan resubmittals requested | | | 3/31/2003 | | FAIL |
|
|
|
Copy of plan review conditions & comments faxed to architect with items requirong a response noted by double astarisk.
|
Routing - PLAN CHECK | 3/12/2003 | | 3/31/2003 | | FAIL |
|
|
|
Additional clarification and detail submittals required. Copy faxed & mailed to Gerald Armstrong & Tarrie Wagner. Plans forwarded to fire code analyst for review while waiting for response.
|
Routing - PUBLIC WORKS | 3/7/2003 | | 3/12/2003 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/5/2003 | | DONE |
|
|
|
|
Application received | | | 3/5/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/5/2003 | | |
|
|
|
|
Fee Review-notes | 3/5/2003 | 3/5/2003 | | | |
|
|
|
|