Agreement of Future work | 3/28/2006 | 3/14/2006 | 3/22/2010 | | DONE |
Sam Rogers
|
|
|
Agreement with Ken Howell to upgrade Idaho Building fire alarm system to allow Satchel's cooking hood fire extinguising alarm signal to the 1st floor zone of the main fire alarm control panel. All work should be completed by 6-12-2006.
*Completed under FIR07-00091*
|
Case Summary (BLD) | | | 11/16/2009 | | |
|
|
|
|
Case Summary (BLD) | | | 2/12/2009 | | |
|
|
|
|
Case Summary (BLD) | | | 9/18/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/18/2008 | | DONE |
|
|
|
|
BLD-Aging Inspection | 5/29/2008 | 5/29/2008 | 6/6/2008 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Expired | 6/6/2008 | 6/6/2008 | 6/6/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 3/14/2008 | 3/14/2008 | 3/14/2008 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 1/15/2008 | 1/15/2008 | 1/15/2008 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 10/10/2007 | 10/10/2007 | 10/15/2007 | | DEFR |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 7/19/2007 | 7/19/2007 | 7/23/2007 | | PASS |
Dave Hannah
|
|
|
OK FOR PERM OCC AFTER FIRE OKS
|
BLD-Aging Inspection | 11/2/2006 | 11/2/2006 | 11/9/2006 | | PASS |
Dave Hannah
|
|
|
ok for perm occ
|
Case Summary (BLD) | | | 10/18/2006 | | |
|
|
|
|
BLD-Aging Inspection | 8/28/2006 | 8/28/2006 | 8/29/2006 | | DEFR |
Dave Hannah
|
|
|
waiting for fire final
|
BLD-Aging Inspection | 6/22/2006 | 6/22/2006 | 6/27/2006 | | DONE |
Forrest France
|
|
|
Pending alarm upgrade agreement completion.
|
BLD-Aging Inspection | 4/4/2006 | 4/4/2006 | 4/4/2006 | | DEFR |
Dave Hannah
|
|
|
waiting for fire dept sign off
|
Plan Reviewer's activity | | | 1/25/2006 | | DONE |
|
|
|
FIRE Activity- Issued a written upgrade agreement signed by Fire Marshal, to K. Howell for his immediate signature specifying the decisions reached in the 8/23/05 meeting and a 90-day completion period from date of signing. A new fire alarm permit will be required for this work.
|
BLD-Aging Inspection | 1/16/2006 | 1/16/2006 | 1/18/2006 | | DEFR |
Forrest France
|
|
|
|
Case Summary (BLD) | | | 1/12/2006 | | |
|
|
|
|
BLD-Aging Inspection | 11/15/2005 | 11/15/2005 | 11/16/2005 | | FAIL |
Dave Hannah
|
|
|
waiting for fire to sign off perm
|
Telephone call | | | 10/26/2005 | | DONE |
|
|
|
Email by Jenifer Gilliland to K. Howell regarding status of alarm upgrade per our 8/23/05 meeting; Ken indicated he was waiting for written direction from the City on work to be completed.
|
Meeting | | | 8/23/2005 | | DONE |
|
|
|
Meeting with Ken Howell, owner, F. Varley consultant to Ken Howell, J. Gilliland, D. Hanneman, G. Slane, and S. Rogers. Reached mutual agreement on acceptable modifications to the existing Fire Alarm system, based on a fire alarm system evaluation report by F. Varley.
|
BLD-Aging Inspection | 7/4/2005 | 7/4/2005 | 7/7/2005 | | DONE |
Forrest France
|
|
|
Gordon at ###-#### is in contact with the owner of Satchel's grill to schedule a final inspection- will contact Gordon again tomorrow for follow-up.
|
BLD-Aging Inspection | 4/21/2005 | 4/21/2005 | 4/25/2005 | | NR |
Forrest France
|
|
|
Spoke with Gordon at ###-####. Awaiting agreement from Ken Howell and fire dept. on fire alarm upgrade. Gordon also mentioned an issue with the backflow prevention device. He will call re-inspection when ready.
|
BLD-Aging Inspection | 9/16/2004 | 9/16/2004 | 9/16/2004 | | PASS |
Dave Hannah
|
|
|
wip with fire alarms 9/16/2004 8:09:21 AM
|
BLD-Aging Inspection | 7/13/2004 | 7/13/2004 | 7/20/2004 | | PART |
Rick Jackson
|
|
|
Awaiting fire alarm upgrade agreement from Ken Howell; FD has control of getting this agreement 7/20/2004 1:29:00 PM
|
FIRE-Final Inspection | 5/6/2004 | 5/6/2004 | 5/6/2004 | A | PART |
Rick Jackson
|
|
|
Completed the fire alarm connection from Satchel's hood extinguishing system to building alarm system per plans; awaiting upgrade agreement of the exsisting alarm system 5/6/2004 11:03:34 AM
|
FIRE-Conference | 3/18/2004 | 4/29/2004 | 4/30/2004 | P | PART |
Rick Jackson
|
|
|
Follow up for 25 day notice issued on March 18th Info on past notices provided to PDS for review 4/30/2004 3:38:05 PM
|
Meeting | | | 4/30/2004 | | DONE |
|
|
|
Meeting with PDS staff. Decided to have the FI issue a final notice of violation (NOV) indicating power will be disconnected within 72 hours of receipt of the NOV, unless a temporary connection, approved by the fire department, is made to connect the cooking hood extinguishing system to the existing non-code compliant building fire alarm system within the 72 hour period. IF the connection is made, tested and approved within the allotted 72 hours, a TOC will be issued contingent upon a building fire alarm system upgrade agreement being signed between the building owner and the FD. The FD will address the requirement to upgrade the building fire alarm system separately and directly with the building owner.
|
FIRE-Conference | 3/11/2004 | 3/18/2004 | 3/18/2004 | P | PART |
Rick Jackson
|
|
|
Follow up for 5 day notice Left 25 day notice with Dominic; will follow up on April 29th 3/18/2004 3:38:22 PM
|
FIRE-Conference | 3/11/2004 | 3/11/2004 | 3/11/2004 | P | PART |
Rick Jackson
|
|
|
Left 5 day notice with Dominique about getting alarm upgrade agreement with Dave Miller to obtain final occupancy 3/11/2004 2:32:06 PM
|
Meeting | | | 3/5/2004 | | DONE |
|
|
|
Meeting with Dave MIller (BFD), authorized me to contact Ken Howell to advise him that we are waiting on an upgrade agreement for the existing fire alarm system which was to have been submitted and approved prior to the the TCO expiring on 1/31/2004.
|
Telephone call | | | 3/5/2004 | | DONE |
|
|
|
Called Ken Howell and left a message informing him of the situation of the TCO. I asked him to call either myself or Dave Miller to get the upgrade agreement inplace.
|
Telephone call | | | 11/14/2003 | | DONE |
|
|
|
telcon from Ken Howell; reviewed the problems with Jack Schmidt's 10/28/03 FA plan submittal and what is needed, so he can better plan a FA upgrade proposal to take to Dave Miller.
|
BLD-Final | 10/31/2003 | 10/31/2003 | 10/31/2003 | P | PART |
Dave Hannah
|
|
|
Gordon ###-####//after 2:00 ok for temp occ ok for perm occ after fire and plumb oks for perm occf 10/31/2003 2:37:13 PM
|
FIRE-Final Inspection | 10/31/2003 | 10/31/2003 | 10/31/2003 | P | PART |
Rick Jackson
|
|
|
fire/life safety will be on temp occupancy per Dave Miller until the hood system is connected to the building alarm system 10/31/2003 3:33:39 PM
|
Temporary occupancy | | | 10/31/2003 | | DONE |
|
|
|
Temp. Occ. Cert. # 5017 issued 10-31-03 to Satchel's Grill.
|
BLD-Final | 10/30/2003 | 10/30/2003 | 10/30/2003 | P | CANC |
Dave Hannah
|
|
|
Gordon ###-####
|
CHANGE STATUS TO (ISS) | | | 10/30/2003 | | DONE |
|
|
|
FEES PAID IN JUNE
|
Application received | | | 10/13/2003 | | DONE |
|
|
|
I called Ken Howell just to give him a "heads up" of the Fire Inspector's preliminanry observation that the Fire alarm panel appears to be older and it may not be of an approved type for AS monitoring or not be capable of having a separate zone for monitoring of the cooking hood extinguishing system. Explained what is normally needed for FA monitoring and the need for owner to be involved if it involves upgrading the system or panel; just to give him advance notice to try to avoid a last minute crisis that could interfer with the planned opening date of the new tenant. Ken indicated he is aware of upgrade agreement procedures from the Idanha Hotel project. He will contact the alarm contractor and follow up with Dave Miller if necessary. He called back wth Joe Henders, Maint.Dir., and we discussed further. They understand and will follow up on this as necessary.
|
FIRE-Conference | 10/9/2003 | 10/9/2003 | 10/9/2003 | A | PART |
Rick Jackson
|
|
|
met with tenenat and reviewed plans - will need keyed main exit and rear exit with lever hardware; repair exit signs; extinguishers needed; test extinguishing system; tie extinguishing system to alarm panel (plans required); see fire sprinkler permit for other items
|
BLD-Framing/Rough-in | 8/27/2003 | 8/27/2003 | 8/27/2003 | P | PASS |
Dave Hannah
|
|
|
GORON PLEASE CALL 1/2 BEFORE GOING OUT; Phone #: ###-#### Internet Inspection Request from: Darla Downs 8/27/2003 12:44:24 PM
|
BLD-Framing/Rough-in | 8/13/2003 | 8/14/2003 | 8/14/2003 | A | PART |
Carl Dependahl
|
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Annette Moore.gas test ok 8/15/2003 6:58:00 AM
|
BLD-Framing/Rough-in | 8/14/2003 | 8/14/2003 | 8/14/2003 | P | PART |
Carl Dependahl
|
|
|
walls ok to cover. 8/14/2003 4:17:52 PM
|
BLD-Framing/Rough-in | 8/12/2003 | 8/13/2003 | 8/13/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/12/2003 at 3:14:58 PM. Contact: ###-####...ok to 1 side, need firestops & sprinkler. 8/13/2003 1:10:38 PM
|
BLD-Framing/Rough-in | 8/12/2003 | 8/13/2003 | 8/13/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/12/2003 at 3:14:58 PM. Contact: ###-####.need firestops, sprinkler r/i...ok to 1 side only. Hood not in yet. 8/13/2003 12:25:14 PM
|
BLD-Framing/Rough-in | 8/11/2003 | 8/12/2003 | 8/12/2003 | A | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/11/2003 at 10:50:42 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/8/2003 | 8/8/2003 | 8/8/2003 | P | PART |
Carl Dependahl
|
|
|
allison; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...need gas test...ok to insul only 8/8/2003 4:52:17 PM
|
Issue PAID IN FULL permit | | | 6/27/2003 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 3/7/2003 | | 5/2/2003 | | PASS |
Carl Westfall
|
|
|
5/2/2003 09:35:53 CJW - activity updated through activity BLDA022 from case BLD03-00430.
|
Routing - PLAN CHECK | 4/11/2003 | | 5/2/2003 | | PASS |
|
|
|
Drawings approved, with conditions, after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/2/2003 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 5/2/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/2/2003 | | DONE |
|
|
|
|
Telephone call | | | 5/2/2003 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Plan resubmittals received | | | 4/18/2003 | | DONE |
|
|
|
Revised Sheet Two.
|
Plan resubmittals received | | | 4/14/2003 | | DONE |
|
|
|
Sheet Two and accompanying letter from architect and mechanical engineer received and forwarded to Carl.
|
Routing - FIRE | 4/7/2003 | | 4/11/2003 | | PASS |
|
|
|
review comments faxed to architect.
|
Routing - PLAN CHECK | 3/19/2003 | | 4/7/2003 | | |
|
|
|
Failed first UBC plan review. UBC plan review started April 1, 2003 and finished April 7, 2003. A response from the architect was required. See the plan review report.
|
Routing - PLUMBING | 3/13/2003 | | 3/19/2003 | | PASS |
|
|
|
1. prep sink shall discharge indirectly into a floor sink 2. dishwasher shall discharge indirectly into a floor sink 3. installl big dipper per manufacturers instructions as to flow control into unit from three compartment sink. 4. additional backflow protection may be required for expresso, ice machine and any soda dispensers. 5. expansion protection shall be provided at water heater 6. water heater shall have heat trap nipples.
|
Routing - PLANNING | 3/12/2003 | | 3/13/2003 | | PASS |
|
|
|
P-1 parking overlay district requires no parking in this area for restuarants. Approved per P&Z.
|
Routing - PUBLIC WORKS | 3/7/2003 | | 3/12/2003 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/7/2003 | | PASS |
|
|
|
|
Application received | | | 3/6/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/6/2003 | | |
|
|
|
|
90 day tracking............. | 3/14/2006 | 6/14/2006 | | | |
|
|
|
Received approved FA upgrade agreement. A copy will be attached to this building permit.
|
Fee Review-notes | 3/6/2003 | 3/6/2003 | | | |
|
|
|
|
Routing Off Site -Energy | 3/7/2003 | | | | |
|
|
|
Energy plans in energy hold box. kmm
|