Permit Information
Permit NumberBLD03-00435
StatusExpired
Name HOLLAND & HART (15TH FLOOR)
Site Address 101 S CAPITOL BLVD Unit: 1500
Project NameUS BANK-15TH FLR
Customer Number 
ePlanReviewNo
Description
(HOLLAND & HART - 15TH FLOOR) This building is fire sprinklered because it is a high-rise. To remodel an existing 11,930 square foot whole floor tenant space for the existing tenant. This space is located on the 15th floor (14,600 square feet) of an existing high-rise building. The "core" has a floor area of 2,670 square feet. The two existing "core" restrooms will be upgraded to be accessible to the disabled. Work is to include interior nonbearing walls, interior windows and doors, millwork, finishes, and suspended ceilings all per approved drawings and plan review report on file. All new work associated with the existing elevator lobby/corridor shall comply with the 1-hr corridor provisions of the 2000 IBC. If not already existing, firesafing will be installed at the perimenter of the floor between the floor and the spandrel glass. Fire sprinkler heads shall be relocated to comply with NFPA 13-1999 as regulated by the Fire Department. (9-9-03) A "LETTER OF UNDERSTANDING" WAS SIGNED BY REPRESENTATIVES OF UNICO PROPERTIES (DAN PREISLER ON JUNE 17, 2003) AND THE CITY OF BOISE (TIM HOGLAND ON JUNE 19, 2003). THIS AGREEMENT ALLOWS THE PROVISIONS OF THE 2000 IBC TO BE APPLIED TO INDIVIDUAL FLOORS. IN ORDER TO APPLY THE 2000 IBC TO A FLOOR THE FIRE ALARM, FIRE SPRINKLER SYSTEM, AND HIGH-RISE LIFE SAFETY SYSTEMS ON THAT FLOOR (AND THE INFRASTRUCTURE SUPPORTING THESE SYSTEMS) MUST BE IN COMPLIANCE WITH THE 2000 IBC. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/2/2013 DONE
BLD-Aging Inspection9/1/20049/1/20049/1/2004 PASS
DetailsDave Hannah
DOC - Permit Expired9/1/20049/1/20049/1/2004APASS
DetailsDave Hannah
Expired by inspector at 9/1/2004 7:55:59 AM
BLD-Aging Inspection6/24/20046/24/20046/24/2004 DONE
DetailsDave Hannah
Letter of compliance  10/10/2003 DONE
Letter of Compliance # 24133 issued 10-10-03.
BLD-Final10/6/200310/7/200310/7/2003APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/6/2003 at 4:52:35 PM. Contact: ###-####. ok for perm occ 10/7/2003 10:32:34 AM
BLD-Final10/3/200310/6/200310/6/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/3/2003 at 4:02:17 PM. Contact: ###-####. Ok temp oc , needs restroom signs posted for perm. 10/5/2003 9:02:05 PM
BLD-Final10/2/200310/3/200310/3/2003PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/2/2003 at 3:12:07 PM. Contact: ###-####. needs fire life sfety and plumbing. 10/3/2003 12:16:32 AM. 10/3/2003 12:18:33 AM
FIRE-Final Inspection10/3/200310/3/200310/3/2003PPASS
DetailsRick Jackson
BLD-Framing/Rough-in9/12/20039/15/20039/15/2003APART
DetailsDave Hannah
ceiling grid in hallways ok 9/15/2003 10:01:57 AM
BLD-Framing/Rough-in9/12/20039/12/20039/12/2003PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/12/2003 at 9:58:13 AM. Contact: ###-####. out of time rescheduled for monday am 9/12/2003 4:52:01 PM
Telephone call  9/11/2003 DONE
Re-vised plans picked up by Unico (Duane Pace) 9/11/03 BAM
Inspection Record Card- Bld  9/10/2003  
Print Occupancy Form  9/10/2003  
Telephone call  9/10/2003 DONE
per carl westfall issue cards & not fees due/mls
Plan Reviewer's activity  9/9/2003 DONE
Reviewed and approved the resubmitted drawings for compliance with the "Letter of Understanding" signed by the building owners and the City of Boise.
BLD-Framing/Rough-in8/13/20038/13/20038/13/2003PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 8/13/2003 at 8:14:10 AM. Contact: ###-####...firestops at pipes ok...added wire ok 8/13/2003 3:38:12 PM
BLD-Framing/Rough-in8/11/20038/12/20038/12/2003PPART
DetailsCarl Dependahl
Sam...need to firestop plbg stacks thru 2hr fl at cavity wall; ok to cover if accessible 8/12/2003 3:21:10 PM
BLD-Framing/Rough-in8/11/20038/11/20038/11/2003PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 8/11/2003 at 7:20:11 AM. Contact: ###-####.
BLD-Framing/Rough-in8/6/20038/7/20038/7/2003ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 8/6/2003 at 2:15:43 PM. Contact: ###-####.
BLD-Framing/Rough-in8/7/20038/7/20038/7/2003PNR
DetailsCarl Dependahl
need elec 1st 8/7/2003 3:11:47 PM
BLD-Framing/Rough-in8/7/20038/7/20038/7/2003PNR
DetailsCarl Dependahl
BLD-Framing/Rough-in7/31/20038/1/20038/1/2003PPART
DetailsCarl Dependahl
walls at elev shaft ok...patch holes below lid 8/1/2003 2:16:44 PM
BLD-Framing/Rough-in7/31/20037/31/20037/31/2003PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 7/31/2003 at 8:53:24 AM. Contact: ###-####.
BLD-Framing/Rough-in7/29/20037/30/20037/30/2003APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/29/2003 at 3:13:12 PM. Contact: ###-####. elev lobby need to fire caulk around pipes and along beam 7/30/2003 12:02:39 PM
Plan resubmittals received  7/15/2003 DONE
letter of transmittal, Project letter, with, three copies of A1.0,A2.0,A3.0, A4.1, A6.0, A7.0, A8.0, A9.1, A11.0, and taken to Carl.
BLD-Final6/19/20036/19/20036/19/2003APART
DetailsCarl Dependahl
###-####...ok to use north-east portion of office pending complete final. 6/20/2003 2:28:02 PM
FIRE-Final Inspection6/19/20036/19/20036/19/2003PPART
DetailsRick Jackson
Phase 1 okay to occupy
BLD-Framing/Rough-in5/15/20035/16/20035/16/2003APART
DetailsCarl Dependahl
walls ok at 15, North offices 5/16/2003 1:31:55 PM
BLD-Framing/Rough-in5/14/20035/15/20035/15/2003PPART
DetailsCarl Dependahl
SAM; Phone #: ###-#### Internet Inspection Request from: Darla Downs...walls ok, keep c/n. 5/15/2003 4:30:34 PM
BLD-Framing/Rough-in5/12/20035/13/20035/13/2003ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 5/12/2003 at 1:26:44 PM. Contact: ###-####....15th fl only, left c/n & notes to watch ADA at doors & floating grid clg...need other r/i's 1st. 5/13/2003 5:42:15 PM
Issue PAID IN FULL permit  4/24/2003  
Routing - PLAN CHECK4/17/2003 4/18/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  4/18/2003 PASS
Print Occupancy Form  4/18/2003 DONE
Telephone call  4/18/2003 DONE
permit ready
Plan assigned to (CJW)3/7/2003 4/18/2003 PASS
DetailsCarl Westfall
4/18/2003 10:06:56 CJW - activity updated through activity BLDA022 from case BLD03-00435.
Routing - FIRE4/11/2003 4/17/2003 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  4/17/2003  
Plan resubmittals received  4/16/2003 DONE
Received three sets of A5-0 A10-0 A12-0 A12-1 along with Letter of transmittal, and two Project letters.taken to Carl W.
Routing - PLAN CHECK3/12/2003 4/11/2003  
Failed first UBC review. UBC plan review started April 10, 2003 and finished the next day. A response from the architect was required. See the plan review report.
Routing - PUBLIC WORKS3/7/2003 3/12/2003 PASS
Application received  3/7/2003  
Recd Pcfee & Taken To Pln CK  3/7/2003  
Plans ACCEPTED BY PLAN TECH  3/7/2003 DONE
Fee Review-notes3/7/20033/7/2003