Permit Information
Permit NumberBLD03-00436
StatusFinaled
Name STAN COLE
Site Address 101 S CAPITOL BLVD Unit: 1400
Project NameUS BANK-14TH FLR
Customer Number 
ePlanReviewNo
Description
(HOLLAND & HART - 14TH FLOOR) This building is fire sprinklered because it is a high-rise. To remodel an existing 11,930 square foot whole floor tenant space for the existing tenant. This space is located on the 14th floor (14,600 square feet) of an existing high-rise building. The "core" has a floor area of 2,670 square feet. The two existing "core" restrooms will be upgraded to be accessible to the disabled. Work is to include interior nonbearing walls, interior windows and doors, millwork, finishes, and suspended ceilings all per approved drawings and plan review report on file. All new work associated with the existing elevator lobby/corridor shall comply with the 1-hr corridor provisions of the 2000 IBC. If not already existing, firesafing will be installed at the perimenter of the floor between the floor and the spandrel glass. Fire sprinkler heads shall be relocated to comply with NFPA 13-1999 as regulated by the Fire Department. (9-9-03) A "LETTER OF UNDERSTANDING" WAS SIGNED BY REPRESENTATIVES OF UNICO PROPERTIES (DAN PREISLER ON JUNE 17, 2003) AND THE CITY OF BOISE (TIM HOGLAND ON JUNE 19, 2003). THIS AGREEMENT ALLOWS THE PROVISIONS OF THE 2000 IBC TO BE APPLIED TO INDIVIDUAL FLOORS. IN ORDER TO APPLY THE 2000 IBC TO A FLOOR THE FIRE ALARM, FIRE SPRINKLER SYSTEM, AND HIGH-RISE LIFE SAFETY SYSTEMS ON THAT FLOOR (AND THE INFRASTRUCTURE SUPPORTING THESE SYSTEMS) MUST BE IN COMPLIANCE WITH THE 2000 IBC. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/2/2013 DONE
Fee Review-notes3/7/20033/7/20034/30/2007 DONE
Routing - PLAN CHECK3/12/2003 4/30/2007 PASS
Failed first UBC review. UBC plan review started April 7, 2003 and finished April 10, 2003. A response from the architect was required. See the plan review report.
Third Notice BLD4/9/20074/9/20074/13/2007 DONE
Second Notice has not been responded to.
Second Notice BLD3/30/20073/30/20074/9/2007 DONE
First Notice has not been responded to.
First Notice 3/20/20073/30/2007 DONE
Permanent occupancy  3/20/2007 DONE
Perm. Occ. Cert. # 11486 issued 3-20-07 to Holland & Hart in the U.S. Bank Bldg.
Print Occupancy Form  3/13/2007 DONE
CHANGE STATUS TO (ISS)  3/9/2007 DONE
BLD-Aging Inspection9/16/20049/16/20049/16/2004 PASS
DetailsDave Hannah
DOC - Permit Expired9/16/20049/16/20049/16/2004APASS
DetailsDave Hannah
Expired by inspector at 9/16/2004 8:06:49 AM
BLD-Final7/2/20047/6/20047/6/2004APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/2/2004 at 8:15:55 AM. Contact: ###-####. ok for perm occ 7/6/2004 10:24:15 AM
Permanent Occupancy 7/6/20047/6/2004 DONE
Details
BLD-Final4/22/20044/23/20044/23/2004PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/22/2004 at 3:08:20 PM. Contact: ###-####. ok for temp occ 4/23/2004 4:49:09 PM
FIRE-Final Inspection4/22/20044/22/20044/22/2004PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 4/22/2004 at 8:37:18 AM. Contact: ###-####.
BLD-Framing/Rough-in3/16/20043/17/20043/17/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/16/2004 at 11:32:42 AM. Contact: ###-####. lid in confunce room ok to rock 3/17/2004 9:50:58 AM
BLD-Conference3/4/20043/5/20043/5/2004ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/4/2004 at 1:35:46 PM. Contact: ###-####.
BLD-Conference3/5/20043/5/20043/5/2004PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/4/2004 at 1:35:46 PM. Contact: ###-####.
BLD-Framing/Rough-in3/1/20043/2/20043/2/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/1/2004 at 8:57:13 AM. Contact: ###-####.steel stud partion walls north half 3/2/2004 10:53:49 AM
BLD-Framing/Rough-in2/12/20042/12/20042/12/2004PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/12/2004 at 8:48:10 AM. ok to cover bath room walls 2/12/2004 4:58:28 PM
BLD-Final1/6/20041/7/20041/7/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/6/2004 at 3:40:58 PM. Contact: ###-####. ok to occ phase one 1/8/2004 7:33:52 AM
BLD-Final12/31/20031/5/20041/5/2004AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/31/2003 at 2:50:20 PM. Contact: ###-####. needs fire cualking shaft walls 1/5/2004 11:43:34 AM
FIRE-Final Inspection12/19/200312/22/200312/22/2003PPART
DetailsRick Jackson
phased project - okay to occupy the south half of 14th floor; second exit to be maintained 12/22/2003 4:15:08 PM
BLD-Framing/Rough-in12/16/200312/17/200312/17/2003ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/16/2003 at 11:57:53 AM. Contact: ###-####. out of time reschedled for pm 12/17/2003 11:21:20 AM
BLD-Framing/Rough-in12/17/200312/17/200312/17/2003PPART
DetailsDave Hannah
walls are kicked with 45s but need arc to ok ceiling grid desegn 12/17/2003 2:09:14 PM
BLD-Framing/Rough-in11/24/200311/25/200311/25/2003APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/24/2003 at 2:49:19 PM. Contact: ###-####. ok to cover after elec r/i 11/25/2003 11:30:21 AM
Plan Reviewer's activity  9/9/2003 DONE
Reviewed and approved the resubmitted drawings for compliance with the "Letter of Understanding" signed by the building owners and the City of Boise.
Plan resubmittals received  7/15/2003 DONE
letter of transmittal, Project letter, with, three copies of A1.0,A2.0,A3.0, A4.1, A6.0, A7.0, A8.0, A9.1, A11.0, and taken to Carl.
BLD-Conference4/30/20035/1/20035/1/2003APART
DetailsCarl Dependahl
chris; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...w/ Jason B...no cisca-2 spec available (which is referenced in 1621 IBC.) re suspended ceilings. 5/1/2003 2:54:33 PM
BLD-Conference5/1/20035/1/20035/1/2003ACANC
DetailsCarl Dependahl
Chris
BLD-Conference5/1/20035/1/20035/1/2003PPASS
DetailsCarl Dependahl
Chris, Install grid per " seismic C " specs...floating. 5/1/2003 2:56:26 PM
Issue PAID IN FULL permit  4/24/2003  
Routing - PLAN CHECK4/17/2003 4/18/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  4/18/2003 PASS
Print Occupancy Form  4/18/2003 DONE
Telephone call  4/18/2003 DONE
permit ready
Plan assigned to (CJW)3/7/2003 4/18/2003 PASS
DetailsCarl Westfall
4/18/2003 10:06:22 CJW - activity updated through activity BLDA022 from case BLD03-00436.
Routing - FIRE4/11/2003 4/17/2003 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  4/17/2003 DONE
Routing - PUBLIC WORKS3/7/2003 3/12/2003 PASS
Plans ACCEPTED BY PLAN TECH  3/7/2003  
Application received  3/7/2003  
Recd Pcfee & Taken To Pln CK  3/7/2003