Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-00439
StatusFinaled
Name KANE SQUARE FOUR-PLEXES
Site Address 187 N AVENGER LN
Project NameSIGNATURE SQUARE SUBDIVISION
Customer Number 
ePlanReviewNo
Description
Lot 1, * Type "A" To construct a new 3,956 sq.ft. two story, wood framed, four unit apartment building. Each unit is two bedroom and two bath, @ 943 sq.ft. each. All construction per the approved plans and attached comment list. Refer to BLD 03-00838 for the foundation. MJP CUP02-00028 PC#110-03
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 9/10/20039/10/2003 DONE
Permanent Occupancy 8/18/20038/18/2003 DONE
Details
Permanent occupancy UNPAID FEE  8/18/2003 DONE
Perm. Occ. cert. #9767 issued 8-18-03 to the Kane Square Four-Plexes.
FIRE-Final Inspection8/11/20038/12/20038/12/2003APASS
DetailsTroy Cobbley
fire life safety finaled 8/13/2003 9:20:07 AM
Temporary occupancy  8/7/2003 DONE
Temp. Occ. Cert. #4983 issued 8-7-03 to the Signature Square Subdivision.
FIRE-Final Inspection8/4/20038/5/20038/5/2003PPART
DetailsTroy Cobbley
nick ###-#### A temporary occupancy was given with Dave Millers permission until either the contractor provides a listing for the smoke detector that states coverage or provides an additional smoke detectors 8/5/2003 4:22:31 PM
BLD-Final8/4/20038/5/20038/5/2003APART
DetailsTom Arcoraci
NICK; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok after others sign 8/5/2003 10:50:52 AM
Code Occupancy Approval  8/5/2003 FAIL
Inspection noted no landscaping and no bonding. Contractor showed me his set of plans that had "no" landscaping plans. I showed him our CUP02-00028 file with a set of landscaping plans.
BLD-Framing/Rough-in6/17/20036/18/20036/18/2003APASS
DetailsTom Arcoraci
nick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in6/13/20036/16/20036/16/2003APART
DetailsTom Arcoraci
nick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to insulate upper floor needs fire stopping on floor assemble 6/16/2003 10:25:14 AM
PubWorks Occupancy Approval  5/15/2003 DONE
Drainage project complete, signed permanent occupancy 5/15/03. S.Landaluce
BLD-Framing/Rough-in5/9/20035/9/20035/9/2003PPART
DetailsTom Arcoraci
nick; Phone #: ###-#### Internet Inspection Request from: Annette Moore party wall 5/9/2003 3:18:46 PM
Issue PAID IN FULL permit  5/6/2003  
Routing - PLAN CHECK4/30/2003 5/5/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/5/2003 DONE
Print Pending Permit.LaserJet4  5/5/2003 DONE
Case Summary (BLD)  5/5/2003 DONE
Inspection Record Card- Bld  5/5/2003 DONE
Telephone call  5/5/2003  
Print Occupancy Form  5/5/2003 DONE
Plan assigned to (M_P)3/11/2003 5/5/2003 PASS
DetailsMike Phillips
5/5/2003 09:00:31 M_P - activity updated through activity BLDA022 from case BLD03-00439.
Routing Off Site - STRUCTURAL4/29/2003 5/2/2003 DONE
Contacted PDQ to take revised plans of 4/25/03 to outside engineering. kmm
Routing - PLAN CHECK4/18/2003 4/30/2003 PEND
Waiting for others to approve prior to issuing permit.
Routing Off Site - STRUCTURAL4/10/2003 4/30/2003 FAIL
Plan resubmittals of 4/10/03. Contacted PDQ to take plans to outside eng. kmm
Additional information required for further review.
Plan resubmittals received  4/25/2003 DONE
Received three copies of revised sheets A2.0, A2.1, A3.0, A4.;0, A7.0, A7.1, A7.2, A8.0, A10.0, E2.0, M1.0, NRG and one copy of response letter. Routed to Mike P. kmm
Routing - PLANNING Land Div4/18/2003 4/18/2003 PASS
Lot 1 of Signature Square Subdivision.
Override - Parcel Holds  4/17/2003  
Print permit w/o conditions  4/17/2003  
Routing - FIRE4/17/2003 4/17/2003 PASS
DetailsBill Alexander
"Non Build Aggreement" attached, must be cleared upon FD verification of required hydrants and acceptable vehicle access roadways in place. Personnally visited site 04/18/03 and it appears to be finished.
Routing - PLAN CHECK3/26/2003 4/17/2003 FAIL
Second review completed, sent correction report to designer requesting additional information be resubmitted for further review prior to issuing parmit.
Plan resubmittals received  4/10/2003 DONE
Received foru copies of revised sheets C, A0, 1,of 1, 1 of 3, 2 of 3, 3 of 3, A1.1, A2.0, A2.1, A3.0, A4.0, A5.0, A5.1, A6.0, A7.0, A7.1, A7.2, A8.0, A10.0, E2.0, M1.0, P1.0, P1.1, P2.0, NRG. Five copies of additional calcs. Put two copies of resubmittals and calcs with plans, one copy to outside engineering and one copy for energy review routed to Mike with his two copies. kmm
Plan Review Completed(1st rev)  3/26/2003 DONE
Routing - FIRE3/25/2003 3/26/2003 FAIL
DetailsBill Alexander
Requires a full IBC review prior to acceptance. Need Fire Flows.
Routing Off Site - STRUCTURAL3/13/2003 3/26/2003 FAIL
Contacted PDQ to take plans to outside eng. kmm
Additional information required for further review.
Routing - PLAN CHECK  3/25/2003 FAIL
Sent submittal letter to designer requesting plans be resubmitted and detailed to reflect the 2000 IBC requirements.
Routing Off Site -Energy3/20/2003 3/21/2003 FAIL
Contacted Ron O. for outside energy review. kmm
Routing - Erosion and Sediment  3/19/2003 PASS
ESC approved with conditions attached to plans.
Routing - PLUMBING3/19/2003 3/19/2003 PASS
DetailsLee Rice
see review attachment
Routing - PUBLIC WORKS3/12/2003 3/19/2003 PASS
Plan routing begun/NEW & ADDTN  3/12/2003  
Routing - PLANNING Land Div3/12/2003 3/12/2003 FAIL
Do not issue building permit until Kane Square Subdivision is recorded.
Plans ACCEPTED BY PLAN TECH  3/11/2003 DONE
Application received  3/7/2003  
Routing - PLANNING    PASS
Approved per CUP02-28; Must meet required setbacks. 2 barbeque facilities and 2 picnic tables are to be installed in the open space before occupancy is approved.