BLD-Conference | 1/28/2004 | 1/29/2004 | 1/29/2004 | A | PASS |
Tony Young
|
|
|
check on bond
|
DOC - Permit Finaled | 1/29/2004 | 1/29/2004 | 1/29/2004 | A | PASS |
Tony Young
|
|
|
Finaled by inspector at 1/29/2004 10:32:50 AM
|
BLD-Final | 1/27/2004 | 1/28/2004 | 1/28/2004 | A | CANC |
Tony Young
|
|
|
doug ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Grading Inspection | 1/28/2004 | 1/28/2004 | 1/28/2004 | | BND |
Rita DeYoung
|
|
|
Rough grading complete and approved. Fine grading and revegetation incomplete. For this the engineer has recommended a $750.00 bond. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Final | 1/28/2004 | 1/28/2004 | 1/28/2004 | P | PASS |
Tony Young
|
|
|
Doug, ph# ###-####
|
BLD-Final | 1/26/2004 | 1/26/2004 | 1/26/2004 | P | NR |
Tony Young
|
|
|
doug- ###-####
needs hillside 1st 1/26/2004 2:06:51 PM
|
(F) Reprint permit | | | 10/13/2003 | | |
|
|
|
|
BLD-Energy code compliance | 9/16/2003 | 9/16/2003 | 9/16/2003 | P | PASS |
Jim Storey
|
|
|
###-#### albert
|
BLD-Framing/Rough-in | 9/10/2003 | 9/11/2003 | 9/11/2003 | A | CANC |
Tony Young
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 9/11/2003 | 9/11/2003 | 9/11/2003 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 9/2/2003 | 9/3/2003 | 9/3/2003 | A | PART |
Tony Young
|
|
|
DOUG; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
low on time, conf. only on frame issues, dont insulate 9/3/2003 10:21:13 AM
|
BLD-Framing/Rough-in | 8/22/2003 | 8/22/2003 | 8/22/2003 | P | PART |
Tony Young
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
ext shear ok,,,, met w/ albert 8/22/2003 3:47:38 PM
|
BLD-Foundation | 6/20/2003 | 6/20/2003 | 6/20/2003 | P | PART |
Tony Young
|
|
|
tray; Phone #: ###-#### Internet Inspection Request from: Annette Moore
wip 6/20/2003 4:36:06 PM
|
BLD-Footing | 6/18/2003 | 6/19/2003 | 6/19/2003 | A | PART |
Steven Webb
|
|
|
re-inspection. Parameter footings per plan, need interior footings formed and rebar set. Received soils bearing letter from Briggs engineering. Letter stated soils ok. 6/19/2003 9:41:18 AM
|
BLD-Grading Inspection | 6/19/2003 | 6/19/2003 | 6/19/2003 | | PASS |
Rita DeYoung
|
|
|
Geotechnical engineer approved the footing subgrade
|
BLD-Foundation | 6/18/2003 | 6/18/2003 | 6/18/2003 | P | PART |
Tony Young
|
|
|
late pm ,,,, ftg only 6/19/2003 9:05:12 AM
|
BLD-Footing | 6/18/2003 | 6/18/2003 | 6/18/2003 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/18/2003 at 9:56:55 AM. Contact: ###-####.
wip ftgs, 1/4 of bar in 6/18/2003 4:21:57 PM
|
BLD-Foundation | 6/2/2003 | 6/2/2003 | 6/2/2003 | P | PART |
Tony Young
|
|
|
TREY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
wip 6/2/2003 2:31:49 PM
|
BLD-Footing | 5/29/2003 | 5/30/2003 | 5/30/2003 | P | PART |
Tony Young
|
|
|
Trey ###-####, retaining wall ftg
|
BLD-Footing | 5/29/2003 | 5/29/2003 | 5/29/2003 | P | PART |
Tony Young
|
|
|
trey; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
need one more horizontal #4 bar 5/29/2003 2:31:29 PM
|
BLD-Grading Inspection | 5/29/2003 | 5/29/2003 | 5/29/2003 | | PASS |
Rita DeYoung
|
|
|
FOOTING SUBGRADE HAS BEEN APPROVED BY THE GEOTECHNICAL ENGINEER
|
Issue PAID IN FULL permit | | | 5/27/2003 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 3/26/2003 | 3/26/2003 | 4/7/2003 | | PASS |
Dan Overy
|
|
|
4/7/2003 11:44:25 DJO - activity updated through activity BLDA022 from case BLD03-00440.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/7/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/7/2003 | | |
|
|
|
|
Telephone call | | | 4/7/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Plans ACCEPTED BY PLAN CHECK | | | 3/26/2003 | | |
|
|
|
|
Case Summary (BLD) | | | 3/26/2003 | | PEND |
|
|
|
|
Plan Review Report | | | 3/26/2003 | | PEND |
|
|
|
|
Plan Reviewer's activity | | | 3/26/2003 | | PEND |
|
|
|
plans and lateral wall bracing do not match. need all beam calculations before isssuing permit.
|
Routing - FIRE | 3/14/2003 | | 3/17/2003 | | DONE |
|
|
|
No fire sprinklers required (Arrowhead Canyon)
|
Routing - Erosion and Sediment | 3/14/2003 | | 3/14/2003 | | PASS |
|
|
|
ESC approved with attached conditions.
|
Routing - PLANNING | 3/13/2003 | | 3/14/2003 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 3/12/2003 | | 3/13/2003 | | PASS |
|
|
|
NORTHWEST BOISE SEWER
|
Routing - PUBLIC WORKS GRADING | 3/7/2003 | | 3/12/2003 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3 with conditions of approval in letter attached to the plans and this case.
|
Application received | | | 3/7/2003 | | |
|
|
|
|
Pending Assignment by DJO | 3/7/2003 | | | | |
Dan Overy
|
|
|
|