Permit Information
Permit NumberBLD03-00452
StatusFinaled
Name KANE SQUARE FOUR-PLEXES
Site Address 6233 W DOUGLAS LN
Project NameSIGNATURE SQUARE SUBDIVISION
Customer Number 
ePlanReviewNo
Description
Lot 6, Type "A" To construct a new 3,956 sq.ft. two story, wood framed, four unit apartment building. Each unit is two bedroom and two bath, @ 943 sq.ft. each. All construction per the approved plans and attached comment list. Refer to BLD003-00842 for foundation permit. MJP CUP02-00028 PC#115-03
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 8/28/20038/28/2003 DONE
Permanent occupancy UNPAID FEE  8/28/2003 DONE
Perm. Occ. Cert. #9780 issued 8-28-03 to the Kane Square Four-plexes.
Permanent Occupancy 8/27/20038/27/2003 DONE
Details
BLD-Final8/27/20038/27/20038/27/2003PPASS
DetailsTom Arcoraci
ok for perm occ 8/27/2003 2:30:18 PM
Code Occupancy Approval  8/27/2003 PASS
Signed final on this building, bond in place with Building for $5000.00
FIRE-Final Inspection8/20/20038/25/20038/25/2003APASS
DetailsTroy Cobbley
nick; Phone #: ###-#### Fire life safety finaled. Contractor still needed to hang the two upstairs apartment doors. Structural inspector to please verify. 8/25/2003 2:31:26 PM
BLD-Framing/Rough-in6/30/20037/1/20037/1/2003APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/30/2003 at 3:06:39 PM. Contact: ###-####.
BLD-Framing/Rough-in6/26/20036/27/20036/27/2003APART
DetailsTom Arcoraci
nick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 6/27/2003 10:04:21 AM cn posted 6/27/2003 10:04:47 AM
Issue PAID IN FULL permit  5/6/2003 DONE
Routing Off Site - STRUCTURAL4/29/2003 5/5/2003 DONE
Contacted PDQ to take revised plans of 4/25/03 to outside engineering. kmm
Routing - PLAN CHECK4/30/2003 5/5/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/5/2003 DONE
Print Pending Permit.LaserJet4  5/5/2003 DONE
Case Summary (BLD)  5/5/2003 DONE
Inspection Record Card- Bld  5/5/2003 DONE
Telephone call  5/5/2003  
Print Occupancy Form  5/5/2003 DONE
Print Occupancy Form  5/5/2003 DONE
Plan assigned to (M_P)3/12/2003 5/5/2003 PASS
DetailsMike Phillips
5/5/2003 09:44:32 M_P - activity updated through activity BLDA022 from case BLD03-00452.
Routing - PLAN CHECK4/18/2003 4/30/2003 PEND
Waiting for others to approve prior to issuing permit.
Routing - FIRE4/17/2003 4/17/2003 PASS
DetailsBill Alexander
"Non Build Aggreement" attached, must be cleared upon FD verification of required hydrants and acceptable vehicle access roadways in place. Personnally visited site 04/18/03 and it appears to be finished.
Override - Parcel Holds  4/17/2003  
Print permit w/o conditions  4/17/2003  
Routing - PLAN CHECK3/26/2003 4/17/2003 FAIL
Second review completed, sent correction report to designer requesting additional information be resubmitted for further review prior to issuing parmit.
Routing Off Site - STRUCTURAL4/10/2003 4/17/2003 FAIL
contacted pdq to take resubs of 4/10/03 to outside engineering. kmm
Additional information required for further review.
Plan resubmittals received  4/10/2003 DONE
Received foru copies of revised sheets C, A0, 1,of 1, 1 of 3, 2 of 3, 3 of 3, A1.1, A2.0, A2.1, A3.0, A4.0, A5.0, A5.1, A6.0, A7.0, A7.1, A7.2, A8.0, A10.0, E2.0, M1.0, P1.0, P1.1, P2.0, NRG. Five copies of additional calcs. Put two copies of resubmittals and calcs with plans, one copy to outside engineering and one copy for energy review routed to Mike with his two copies. kmm
Routing Off Site - STRUCTURAL3/13/2003 3/26/2003 FAIL
Contacted PDQ to take plans to outside eng. kmm
Additional information required for further review.
Routing - FIRE3/25/2003 3/26/2003 FAIL
DetailsBill Alexander
Requires a full IBC review prior to acceptance. Need Fire Flows.
Plan Review Completed(1st rev)  3/26/2003 DONE
Routing - PLAN CHECK  3/25/2003 FAIL
Sent submittal letter to designer requesting plans be resubmitted and detailed to reflect the 2000 IBC requirements.
Routing Off Site -Energy3/20/2003 3/21/2003 FAIL
Contacted Ron O. for energy review. kmm
Routing - PLUMBING3/19/2003 3/19/2003 PASS
DetailsLee Rice
approved per attached
Routing - PUBLIC WORKS3/12/2003 3/19/2003 PASS
Routing - Erosion and Sediment  3/19/2003 PASS
ESC approved with conditions attached to plans.
Plan routing begun/NEW & ADDTN  3/12/2003 DONE
Plans ACCEPTED BY PLAN TECH  3/12/2003 DONE
Routing - PLANNING Land Div3/12/2003 3/12/2003 FAIL
Do not issue building permit until Kane Square Subdivision is recorded.
Application received  3/7/2003  
Routing - PLANNING     
Routing - PLANNING Land Div4/18/2003