Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-00467
StatusFinaled
Name CHICO'S
Site Address 816 W IDAHO ST
Project NameCHICO'S
Customer Number 
ePlanReviewNo
Description
(CHICO'S) This building is NOT fire sprinklered. To remodel an existing 2,850 square foot retail sales tenant space located on the first floor of an existing 5,700 square foot building. The basement is NOT approved for occupancy. A nonstructural demolition permit (BLD03-00679) was issued earlier. Work is to include interior nonbearing walls, 2 restrooms accessible to the disabled, suspended gypsum board ceilings, store front glass and doors, and interior finishes all per approved drawings and plan review report on file. DRH03-00025 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/6/2004  
BLD-Final5/30/20036/2/20036/2/2003ADONE
DetailsTom Arcoraci
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
First Notice 6/2/20036/2/2003 DONE
Permanent occupancy UNPAID FEE  6/2/2003 DONE
Perm. Occ. cert. #9670 issued 6-2-03 to Chico's.
BLD-Conference5/30/20035/30/20035/30/2003PPASS
DetailsCarl Dependahl
RA grills back-ordered...ok 5/30/2003 4:44:36 PM
BLD-Final5/30/20035/30/20035/30/2003PPASS
DetailsCarl Dependahl
ok for c/o fees owing okay per Linda
Permanent Occupancy 5/30/20035/30/2003 DONE
Details
FIRE-Final Inspection5/29/20035/30/20035/30/2003APASS
DetailsTroy Cobbley
Life safety finaled. The contractor said that he had an agreement with Carl about the thumbturn on the front door. I notified Carl Dependahl 5/30/2003 3:37:59 PM
BLD-Framing/Rough-in5/28/20035/28/20035/28/2003PPART
DetailsCarl Dependahl
joe ceiling grid; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...grid at storeroom ok... 5/28/2003 1:59:22 PM
BLD-Conference5/21/20035/21/20035/21/2003PFAIL
DetailsCarl Dependahl
###-####, c/n...need min 4" step or ramp 5/21/2003 4:04:13 PM
BLD-Framing/Rough-in5/13/20035/13/20035/13/2003PPART
DetailsCarl Dependahl
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...walls patched &penetrations ok, lid ok pend elec. & hvac 5/13/2003 4:19:45 PM
BLD-Framing/Rough-in5/9/20035/9/20035/9/2003PPART
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore; need patch demising wall, add blocking at restroom walls, etc. storefront not in yet. need IECC for elec, & hvac. 5/9/2003 11:57:49 AM 5/9/2003 4:53:02 PM
Inspection Record Card- Bld  5/7/2003 DONE
Print Occupancy Form  5/7/2003 DONE
Issue PAID IN FULL permit  5/7/2003 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/6/2003 PASS
Plan assigned to (CJW)3/12/2003 5/6/2003 PASS
DetailsCarl Westfall
5/6/2003 11:03:26 CJW - activity updated through activity BLDA022 from case BLD03-00467.
Routing - PLAN CHECK4/24/2003 5/6/2003 PASS
Drawings approved after 2nd resubmittal review.
Plan resubmittals received  5/5/2003 DONE
Received three copies of revised sheets C-1, C-2, A-1, A-2, A-4. Routed to Carl W. kmm
Telephone call  5/1/2003 DONE
Called David Levy, Architect, and discussed the review of his resubmittal. He was e-mailed a list of 4 items that still need to be addressed.
Plan resubmittals received  4/30/2003 DONE
received transmittal letter, letter from Steve Szumlanski of Chico's, copy of a fax cover sheet from Britt Makela Group, Plan Review report. Three sets of cover sheets, C2, A1, A1.1, A1.1a, A2, A2.1, A2.1a, A4, A4a, A4.1, A5, A5a, M2, E2, E3, E4, E5, EN1, EN2, S1,.
Routing - Erosion and Sediment4/22/2003 4/23/2003 DONE
If any comments please call Rita at ###-####---ESC waiver for plan approved with attached conditions. ESC permit is required. RP required to be in charge.
Plan Review Completed(1st rev)  4/22/2003 DONE
Routing - FIRE4/16/2003 4/22/2003 PASS
DetailsBill Alexander
Routing - PLAN CHECK3/18/2003 4/16/2003  
Failed first UBC review. UBC plan review started April 11, 2003 and finished April 16, 2003. A response was required from the architect. See the plan review report.
Received Certificate of Value  3/26/2003 DONE
Received demo cert. of value. put with plans, file and Carl W. kmm
Received Certificate of Value  3/26/2003 DONE
Received revised cert. of value to reflect demo permit. put with plans and file. kmm
Routing - PLANNING3/17/2003 3/18/2003 PASS
Approved per DRH03-00025.
Routing - PUBLIC WORKS3/13/2003 3/17/2003 PASS
Application received  3/10/2003  
Recd Pcfee & Taken To Pln CK  3/10/2003  
Plans ACCEPTED BY PLAN TECH  3/10/2003 DONE
Received three sets of plans, will have to ask for a fourth set if outside eng. is requested.
Fee Review-notes3/10/20033/10/2003   
Routing Off Site -Energy3/13/2003    
Contacted Eric M for energy review. kmm