Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-00482
StatusExpired
Name IC3 INC
Site Address 7330 W AIRWAY CT
Project NameAirway Park
Customer Number 
ePlanReviewNo
Description
Lot #2, Airway Park Subdivision - (Shell & Core) * To construct a new 15,360 square foot, one story, masonry and wood framed shell and core building. This building is fully fire sprinkled. This building will contain 11 future tenant spaces. Each proposed tenant space will have a vanilla finish and include one accessible restroom. This is a shell and core permit only and no occupancy is allowed under this permit. Separate tenant improvements permits will be required to finish each of these spaces for occupancy. All construction per the approved plans and attached comment list. Drh02-00241/PC#121-03/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection5/13/20055/13/20055/13/2005 CANC
DetailsTom Arcoraci
DOC - Permit Expired5/13/20055/13/20055/13/2005PPASS
DetailsTom Arcoraci
BLD-Final10/23/200310/23/200310/23/2003PDONE
DetailsRuss Owen
ok for perm. occ.
Letter of compliance  10/23/2003 DONE
Letter of Complliance # 24312 issued 10-23-03.
BLD-Final10/21/200310/21/200310/21/2003PPART
DetailsRuss Owen
JOE; Phone #: ###-#### Internet Inspection Request from: Annette Moore A/c units at doors gone still need verification of insulation in cmu, contractor notified. 10/20/2003 9:15:22 PM
BLD-Final10/7/200310/8/200310/8/2003APART
DetailsRuss Owen
joe; Phone #: ###-#### Internet Inspection Request from: Darla Downs. Ok temp oc , needs a/c units moved away from 2 doors and letter from insulation contractor foe cmu insulation, contractor on site notified. 10/7/2003 6:03:08 PM
Temporary occupancy  10/8/2003 DONE
Temp. Occ. Cert. # 5008 issued 10-8-03 to Airway Park.
FIRE-Final Inspection10/7/200310/7/200310/7/2003PPASS
DetailsRick Jackson
FIRE-Final Inspection10/1/200310/1/200310/1/2003PFAIL
DetailsTroy Cobbley
Still need permanent building address and suite numbers for a life/safety sign off.
FIRE-Final Inspection9/29/20039/30/20039/30/2003AFAIL
DetailsTroy Cobbley
need fire alarm finaled, lower and tag fire extinguishers, provide building address and suite numbers, install fire hydrant (I'm expecting a call from united water) 9/30/2003 12:05:17 PM
PubWorks Occupancy Approval9/25/20039/25/20039/25/2003 DONE
Drainage project complete, signed permanent occupancy 9/25/03. M.Strasser
Code Occupancy Approval9/25/20039/25/20039/25/2003APASS
DetailsWm. Michael Meloy
Compliancae met. 9/25/2003 11:39:24 AM
BLD-Final9/23/20039/24/20039/24/2003AFAIL
DetailsRuss Owen
joe; Phone #: ###-#### Internet Inspection Request from: Darla Downs not ready but did go over job and found a/c units in exterior walls which will need to be moved. 9/24/2003 6:40:44 PM
BLD-Framing/Rough-in8/7/20038/8/20038/8/2003PPASS
DetailsRuss Owen
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in8/6/20038/7/20038/7/2003PPART
DetailsRuss Owen
JOE; Phone #: ###-#### Internet Inspection Request from: Darla Downs 2 c/ns new details for trusses b-18 to 28 and block/nail attic side of shear wall . went over this with contractor. will recall. 8/7/2003 3:10:21 PM
BLD-Framing/Rough-in8/5/20038/5/20038/5/2003PFAIL
DetailsRuss Owen
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/N posted for roof trusses and other items metal framed walls ok to cover. 8/5/2003 5:24:22 PM
BLD-Framing/Rough-in7/18/20037/21/20037/21/2003PPART
DetailsTom Arcoraci
joe ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to roof 7/21/2003 2:46:06 PM
BLD-Framing/Rough-in7/17/20037/18/20037/18/2003AFAIL
DetailsRuss Owen
JOE...ROOF SHEETING; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows c/n posted on window of trailer. 7/18/2003 1:49:05 PM
BLD-Footing5/30/20035/30/20035/30/2003PPART
DetailsRuss Owen
joe re-bar; Phone #: ###-#### Internet Inspection Request from: Barbara MooreNote: special inspection will be performed and is required. 5/30/2003 3:06:22 PM
(F) Reprint permit  5/14/2003  
Inspection Record Card- Bld  5/9/2003  
Issue PAID IN FULL permit  5/9/2003  
Routing - PLAN CHECK5/8/2003 5/8/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/8/2003 PASS
Print Occupancy Form  5/8/2003 DONE
Telephone call  5/8/2003 DONE
permit ready
Plan assigned to (JCM)3/13/2003 5/8/2003 PASS
DetailsJohn Menard
5/8/2003 10:11:41 JCM - activity updated through activity BLDA022 from case BLD03-00482.
Routing - FIRE5/1/2003 5/7/2003 PASS
resubmittal approved.
Plan resubmittals received  5/1/2003 DONE
Response letter from Glancey Rockwell & Assoc. and two copies of C1. routed letter to fire and one in file.
Routing - PUBLIC WORKS4/30/2003 4/30/2003 PASS
Telephone call  4/30/2003 DONE
telcon with Pete Rockwell. He will resubmit C1 with approval notations for FD access by DMiller. New hydrant required by DM for 300' interval spacing. They will provide a 1-hour lid for AS riser room, approve subj to field verification. He will obtain AS flow info from UW and give to AS contractors.
Routing - PLUMBING4/30/2003 4/30/2003 PASS
per plans and 2000 upc
Routing - FIRE4/22/2003 4/29/2003 HOLD
Plans do not incude the information indicated in architects transmittal letter. Left message for Pete Rockwell to call back to discuss. Hold off on writing review comments pending results of that phone call.
Routing - PLAN CHECK4/10/2003 4/22/2003 PASS
Plan resubmittals received  4/22/2003 DONE
Received response letter from Glancey Rockwell & Associates, United Water Fax, 7 copies of C1, 2 copies of M1.1, two copies of M1.2, two copies of M3.1, taken to John M.
Plan Reviewer's activity  4/22/2003 PASS
Reviewed and approved revisions as submitted. JCM
Routing Off Site - STRUCTURAL4/8/2003 4/11/2003 PASS
Contacted PDQ to take revised plans of 4/8/03 to outside engineering. Received a copy of a fax from the consulting structural engineer approving the resubmittals with additional notes which I will attach to the approved plans. JCM
Routing - Erosion and Sediment4/10/2003 4/10/2003 PASS
ESC approved with conditons attached to plans.
Routing - PLAN CHECK4/7/2003 4/10/2003  
Plan resubmittals received  4/10/2003 DONE
Received one additional set of resumbittal sheets S1.0, S2.0, S3.0, S4.0, S5.0, (1) Structural Calculations,and transmittal. Routed to John Menard.
Routing Off Site -Energy4/3/2003 4/9/2003 PASS
revised plan of March 27,2003 set to Ron O.
Telephone call  4/8/2003  
Contacted applicant for one more resubmitted plans of 4/8/03.
Plan resubmittals received  4/8/2003 DONE
Received two sets of resubmittal sheets S1.0, S2.0, S3.0, S4.0, S5.0, (2) structural calculations, and transmittal. Routed to John Menard.
Telephone call  4/8/2003 DONE
Called Peter Rockwell for one more set of resubmittals (that were received 4/8/03).
Routing - PLUMBING4/3/2003 4/7/2003 FAIL
provide a plan showing the locations and piping to the required service sinks.
Plan resubmittals requested  4/2/2003  
Faxed the architect a copy of the review comments from the consulting structural engineer requesting revisions. JCM
Routing - FIRE3/26/2003 4/2/2003 FAIL
comments faxed to architect, Peter Rockwell.
Routing Off Site - STRUCTURAL3/13/2003 4/1/2003 FAIL
Contacted PDQ for outside engineering. kmm Received a faxed comment list from the consulting structural engineer requesting revisions. JCM
Plan resubmittals received  4/1/2003 DONE
Received two copies of revised sheet A-4 one response letter and one cross section showing attic access requirements. Routed to John M. kmm
Plan resubmittals received  3/28/2003 DONE
Received four sets of resubmittal sheets EN1.1, EN1.2 and (1) Energy Code Sheets with transmittal. Routed to John Menard.
Plan resubmittals requested  3/26/2003 FAIL
Mailed the architect a copy of the plan review comment list requesting revisions. JCM
Routing - PLAN CHECK3/21/2003 3/26/2003 FAIL
Routing Off Site -Energy3/13/2003 3/25/2003 FAIL
Contacted Ron O. for energy review. kmm
Additional plans submitted  3/24/2003 DONE
Received two sets of ESC Plan narratives. Routed to John Menard.
Routing - Erosion and Sediment3/19/2003 3/21/2003 FAIL
No ESC narrative attached. Contacted Plan Designer.
Routing - PLANNING3/21/2003 3/21/2003 PASS
Approved per DRH02-241.
Routing - PUBLIC WORKS3/13/2003 3/19/2003 PASS
Plans ACCEPTED BY PLAN TECH  3/13/2003 DONE
Routing - PLANNING Land Div3/13/2003 3/13/2003 PASS
Lot 2, Block 1 of Airway Park Subdivision.
Plan routing begun/NEW & ADDTN  3/13/2003 DONE
Application received  3/12/2003  
Recd Pcfee & Taken To Pln CK  3/12/2003 DONE
Fee Review-notes3/12/20033/12/2003