BLD-Final | 10/17/2003 | 10/21/2003 | 10/21/2003 | A | PASS |
Jim Storey
|
|
|
TROY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
DOC - Permit Finaled | 10/21/2003 | 10/21/2003 | 10/21/2003 | A | PASS |
Jim Storey
|
|
|
Finaled by inspector at 10/21/2003 9:02:11 AM
|
BLD-Energy code compliance | 8/19/2003 | 8/20/2003 | 8/20/2003 | A | PASS |
Tom Arcoraci
|
|
|
troy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 8/19/2003 | 8/20/2003 | 8/20/2003 | A | PASS |
Tom Arcoraci
|
|
|
troy--re-insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 8/18/2003 | 8/19/2003 | 8/19/2003 | A | FAIL |
Jim Sly
|
|
|
TROY; Phone #: ###-#### Internet Inspection Request from: Darla Downs Insulation not done yet.......Left message with contractor to recall when done. 8/19/2003 11:42:04 AM
|
BLD-Framing/Rough-in | 8/15/2003 | 8/18/2003 | 8/18/2003 | A | CANC |
Jim Storey
|
|
|
TROY; Phone #: ###-#### Internet Inspection Request from: Darla Downs out of time. 8/18/2003 4:53:06 PM
|
BLD-Framing/Rough-in | 8/14/2003 | 8/15/2003 | 8/15/2003 | A | FAIL |
Dave Hannah
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore c/n on site ok to insulate 8/15/2003 9:55:08 AM
|
BLD-Framing/Rough-in | 8/14/2003 | 8/14/2003 | 8/14/2003 | P | CANC |
Jim Storey
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore out of time. 8/14/2003 5:28:12 PM
|
BLD-Framing/Rough-in | 8/1/2003 | 8/1/2003 | 8/1/2003 | P | PART |
Dave Hannah
|
|
|
terry shear nail; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover ext 8/1/2003 4:52:05 PM
|
BLD-Foundation | 6/20/2003 | 6/23/2003 | 6/23/2003 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/20/2003 at 7:33:58 AM. Contact: ###-####.
|
BLD-Footing | 6/20/2003 | 6/20/2003 | 6/20/2003 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/20/2003 at 7:33:28 AM. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 6/16/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/10/2003 | | DONE |
|
|
|
|
Telephone call | | | 6/10/2003 | | DONE |
|
|
|
permit ready and fees due
|
Print Pending Permit.LaserJet4 | | | 6/9/2003 | | |
|
|
|
|
Plan Review Report | | | 6/9/2003 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/9/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/30/2003 | | 6/9/2003 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 6/4/2003 | | 6/9/2003 | | PASS |
Steve Munroe
|
|
|
6/9/2003 16:13:08 SAM - activity updated through activity BLDA022 from case BLD03-00486.
|
Plan Reviewer's activity | | | 6/5/2003 | | PEND |
|
|
|
6/5/03 10:10 I need to talk to Scott. I need from him, lateral engineering for the master bath and nook, plus gravity engineering for footing in the garage and by the stairs. I also needed some beam sizes and bearing issues. Plan are on hold till I recieve the engineering.
|
Pending Assignment by DJO | 3/13/2003 | | 6/4/2003 | | DONE |
Dan Overy
|
|
|
6/4/2003 16:01:33 SAM - activity updated through activity BLDA183 from case BLD03-00486.
|
Routing - PUBLIC WORKS | 5/30/2003 | | 5/30/2003 | | DONE |
|
|
|
|
Routing - PLANNING | 5/30/2003 | | 5/30/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 5/28/2003 | | DONE |
|
|
|
talked with Melissa at Prestige wanted to take the old plan out and replace it with the new set that was submitted today per Scott throw away the old set that was submitted 3-3-03
|
Routing - PLANNING | 3/13/2003 | | 3/18/2003 | | FAIL |
|
|
|
Driveway exceeds 33 ft in front setback. Called and talked to Scott Zierler.
|
Application received | | | 3/13/2003 | | |
|
|
|
|