Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-00492
StatusFinaled
Name ASIN HOMES
Site Address 3371 N LAKEHARBOR LN
Project NameNichols Financial Building
Customer Number 
ePlanReviewNo
Description
Silverlake Terrace Office Park - Building Two - Nichols Financial Building. To Construct a 1300 sq.ft. one story Type VB office building . Other work includes all site improvements, paving and landscaping per approved plans and attachments. DRH00-00208
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 9/17/20039/17/2003 DONE
Permanent occupancy  9/17/2003 DONE
Perm. Occ. Cert. #9804 issued 9-17-03 to Nichols Financial Building.
Permanent Occupancy 9/16/20039/16/2003 DONE
Details
BLD-Final9/15/20039/16/20039/16/2003APASS
DetailsSteven Webb
Phone #: ###-#### Internet Inspection Request from: Kim Olson
BLD-Final9/11/20039/11/20039/11/2003PCANC
DetailsTom Arcoraci
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
FIRE-Final Inspection9/11/20039/11/20039/11/2003PPASS
DetailsTroy Cobbley
Fire life safety finaled. Structural inspector to verify "Door to remain...." sticker is installed
Inspection Record Card- Bld  9/5/2003 DONE
Print Occupancy Form  9/5/2003 DONE
BLD-Conference8/26/20038/27/20038/27/2003APASS
DetailsTony Young
mike; phone # ###-####
grade around front will be ok to come up to rock siding 8/27/2003 9:31:05 AM
BLD-Conference8/26/20038/26/20038/26/2003PPART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Kim Olson
?s on landscape 8/27/2003 8:29:01 AM
BLD-Wall cover7/8/20037/9/20037/9/2003APASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Kim Olson
energy code ok 7/9/2003 10:20:48 AM
BLD-Framing/Rough-in7/1/20037/2/20037/2/2003PPASS
DetailsTony Young
MIKE ###-####
BLD-Framing/Rough-in6/26/20036/27/20036/27/2003AFAIL
DetailsTony Young
ext. drywall not nailed per plan 6/27/2003 12:11:12 PM
BLD-Wall cover6/13/20036/17/20036/17/2003APART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/13/2003 at 1:42:16 PM. Contact: ###-####.ext shear ok 6/17/2003 11:53:33 AM
Case Summary (BLD)  6/12/2003  
Case Summary (BLD)  6/4/2003  
BLD-Foundation5/28/20035/28/20035/28/2003PPART
DetailsTony Young
DANE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Footing5/27/20035/27/20035/27/2003PPART
DetailsTony Young
dane; Phone #: ###-#### Internet Inspection Request from: Annette Moore
wip,,, set backs appear to be per plan 5/27/2003 3:46:35 PM
(F) Reprint permit  5/22/2003  
Routing Off Site - STRUCTURAL5/19/2003 5/21/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/21/2003 DONE
Inspection Record Card- Bld  5/21/2003  
Print Occupancy Form  5/21/2003 DONE
Telephone call  5/21/2003 DONE
LEFT MESS THAT PERMIT IS READY & NEED ACHD
Issue PAID IN FULL permit  5/21/2003 DONE
Plan assigned to (MLO)3/24/2003 5/21/2003 PASS
DetailsMike Otto
5/21/2003 08:47:24 MLO - activity updated through activity BLDA022 from case BLD03-00492.
Routing - FIRE4/29/2003 5/13/2003 PASS
Resubmittal acceptable.
Routing - PLAN CHECK4/25/2003 4/29/2003 PASS
Routing Off Site - STRUCTURAL4/25/2003 4/29/2003 FAIL
Contacted PDQ to take resubs of 4/24/03 to outside engineering. kmm
Plan resubmittals received  4/24/2003 DONE
received two copies of a response letter with a cover sheet along with a letter for Same R. and two sets of plans 2-1, 2-2, 2.3, 2.4, 2-P,
Routing - FIRE4/9/2003 4/14/2003 FAIL
Review comments faxed to architect.
Routing - PLAN CHECK3/28/2003 4/9/2003 FAIL
corrections sent to architect
Plan resubmittals requested  4/9/2003 DONE
IBC corrections
Plan resubmittals received  3/28/2003 DONE
Received four sets of resubmittal sheets 2-3, 2-2, 2-4, 2-5, 2-p, with (3) structural calculations. Attached one set to outside engineering, routed three sets to Mike Otto.
Routing - PLUMBING3/26/2003 3/27/2003 PASS
per plans and 2000 upc
Routing - PUBLIC WORKS3/24/2003 3/26/2003 PASS
Plan resubmittals received  3/26/2003 DONE
Received two copies of revised sheets 1, 2,3,4,5,6,7,& 8 ( sewer & water Plans) Put with plans. kmm
Routing - PLUMBING3/24/2003 3/24/2003 FAIL
DetailsLee Rice
need sewer and water plan
Pending Assignment by JCM3/17/2003 3/24/2003 DONE
DetailsJohn Menard
3/24/2003 11:26:05 JCM - activity updated through activity BLDA174 from case BLD03-00492.
Routing - PLANNING3/21/2003 3/22/2003 PASS
Approved as per CUP99-00158 (DAA) and per DRH00-208 and as noted on sheet 6 (MGS).
Routing - PUBLIC WORKS3/18/2003 3/20/2003 PASS
Routing - Erosion and Sediment3/20/2003 3/20/2003 PASS
ESC approved with conditions attached to plans.
Routing - PLANNING Land Div3/17/2003 3/18/2003 PASS
Lot 2 of Silverlake Terrace Subdivision.
Plans ACCEPTED BY PLAN TECH  3/17/2003 FAIL
1. Drainage Calcs required.(Ok per Brian M.)
2. Current plans & struct. calcs. 2000 IBC
3. Copy of subdivision legals to verify designated non build areas.(Received legals)
Faxed Architect and applicant. kmm
Plan routing begun/NEW & ADDTN  3/17/2003 DONE
Application received  3/13/2003  
Recd Pcfee & Taken To Pln CK  3/13/2003 DONE
Fee Review-notes3/13/20033/13/2003