First Notice | | 9/12/2003 | 9/12/2003 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 9/12/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9800 issued 9-12-03 to Reynolds Schneck Accounting.
|
Permanent Occupancy | | 9/11/2003 | 9/11/2003 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/11/2003 | 9/11/2003 | 9/11/2003 | P | CANC |
Troy Cobbley
|
|
|
duplicate inspection 9/11/2003 3:16:26 PM
|
BLD-Final | 9/11/2003 | 9/11/2003 | 9/11/2003 | P | PASS |
Tom Arcoraci
|
|
|
ok for perm occ when others sign perm
|
FIRE-Final Inspection | 9/11/2003 | 9/11/2003 | 9/11/2003 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled. Structural to verify that the "Door to remain...." sticker is installed
|
FIRE-Final Inspection | 9/9/2003 | 9/10/2003 | 9/10/2003 | A | PASS |
Rick Jackson
|
|
|
###-#### mike address will be visible from Lake Harbor for structural inspector 9/10/2003 9:50:20 AM
|
Inspection Record Card- Bld | | | 9/5/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/5/2003 | | DONE |
|
|
|
|
BLD-Conference | 8/26/2003 | 8/26/2003 | 8/26/2003 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Kim Olson
?s on landscape 8/27/2003 8:29:22 AM
|
BLD-Wall cover | 7/8/2003 | 7/9/2003 | 7/9/2003 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Kim Olson
energy code ok 7/9/2003 10:20:36 AM
|
BLD-Framing/Rough-in | 7/1/2003 | 7/2/2003 | 7/2/2003 | P | PASS |
Tony Young
|
|
|
WALL COVER MIKE--###-####
|
BLD-Framing/Rough-in | 7/1/2003 | 7/1/2003 | 7/1/2003 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/1/2003 at 7:22:13 AM. Contact: ###-####.
c/n posted ok to insulate 7/1/2003 11:43:41 AM
|
BLD-Framing/Rough-in | 6/27/2003 | 6/30/2003 | 6/30/2003 | P | CANC |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Kim Olson
|
BLD-Framing/Rough-in | 6/26/2003 | 6/27/2003 | 6/27/2003 | A | FAIL |
Tony Young
|
|
|
rock on ext. not nailed per plan 6/27/2003 12:10:48 PM
|
BLD-Wall cover | 6/13/2003 | 6/17/2003 | 6/17/2003 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/13/2003 at 1:41:16 PM. Contact: ###-####.ext shear ok 6/17/2003 11:54:03 AM
|
Case Summary (BLD) | | | 6/12/2003 | | |
|
|
|
|
BLD-Foundation | 5/28/2003 | 5/28/2003 | 5/28/2003 | P | PART |
Tony Young
|
|
|
DANE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Footing | 5/27/2003 | 5/27/2003 | 5/27/2003 | P | PART |
Tony Young
|
|
|
dane; Phone #: ###-#### Internet Inspection Request from: Annette Moore
wip ,,, set backs appears to be per plan 5/27/2003 3:45:59 PM
|
(F) Reprint permit | | | 5/22/2003 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/19/2003 | | 5/21/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/21/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/21/2003 | | |
|
|
|
|
Print Occupancy Form | | | 5/21/2003 | | |
|
|
|
|
Telephone call | | | 5/21/2003 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY & NEED ACHD
|
Issue PAID IN FULL permit | | | 5/21/2003 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 3/24/2003 | | 5/21/2003 | | PASS |
Mike Otto
|
|
|
5/21/2003 08:49:57 MLO - activity updated through activity BLDA022 from case BLD03-00494.
|
Plan resubmittals received | | | 5/19/2003 | | DONE |
|
|
|
three sets of 1-5, 2-5, 3-5, 4-5, 5-5 and taken to mike o.
|
Routing Off Site - STRUCTURAL | 4/25/2003 | | 5/16/2003 | | FAIL |
|
|
|
Contacted PDQ to take resubs of 4/24/03 to outside engineering. kmm corrections faxed and mailed to architect
|
Plan resubmittals requested | | | 5/16/2003 | | DONE |
|
|
|
structural corrections
|
Plan resubmittals received | | | 5/12/2003 | | DONE |
|
|
|
Received 2nd set of sheets EN1.0, P0.0, P0.1, P1.1. Put with plans that are in plumb. kmm
|
Routing - PLUMBING | 5/9/2003 | | 5/12/2003 | | PASS |
|
|
|
per plans and 2000 upc
|
Plan resubmittals requested | | | 5/9/2003 | | DONE |
|
|
|
architect contacted to provide second set of plumbing revisions of 5-8, provided only one set
|
Plan resubmittals received | | | 5/8/2003 | | DONE |
|
|
|
received one set of P0.0, P0.1, P1.1, EN1.0 and taken to Mike O.
|
Routing - PLAN CHECK | 4/28/2003 | | 4/29/2003 | | PASS |
|
|
|
|
Routing - FIRE | 4/24/2003 | | 4/25/2003 | | PASS |
Bill Alexander
|
|
|
|
Plan resubmittals received | | | 4/24/2003 | | DONE |
|
|
|
received two sets of 1.1, 1-2, 1-3, 1-4 and a cover sheet.
|
Plan resubmittals received | | | 4/24/2003 | | DONE |
|
|
|
Received one copy of letter addressed to Sam R. Put with plans. kmm
|
Plan resubmittals received | | | 4/23/2003 | | DONE |
|
|
|
Received United Water Letter. Put with plans and file. kmm
|
Routing - PLUMBING | 4/23/2003 | | 4/23/2003 | | FAIL |
Lee Rice
|
|
|
Have two Mech Engineers and sheets for one job. Have to have just one. Called engineer.
|
Plan Review Completed(1st rev) | | | 4/22/2003 | | DONE |
|
|
|
|
Routing - FIRE | 4/16/2003 | | 4/22/2003 | | FAIL |
Bill Alexander
|
|
|
Lack required hydrant flows.
|
Routing - PLAN CHECK | 3/28/2003 | | 4/16/2003 | | FAIL |
|
|
|
corrections faxed and mailed to architect
|
Plan resubmittals requested | | | 4/16/2003 | | DONE |
|
|
|
IBC corrections
|
Routing Off Site - STRUCTURAL | 3/28/2003 | | 4/14/2003 | | FAIL |
|
|
|
called pdq for outside engineering.dkl
4/14/2003-received plan review (fail) from engineer and forwarded to Mike O.
|
Plan resubmittals received | | | 3/28/2003 | | DONE |
|
|
|
Received four sets of resubmittal sheets 1-3, 1-2, 1-5, 1-4 with (2) structural calculations. Attached one set to outside engineering, routed three sets to Mike Otto.
|
Routing - PLUMBING | 3/26/2003 | | 3/27/2003 | | FAIL |
|
|
|
called mike fairchilds office and left a message that the plumbing plans in this set were for building 1 and I would send the plans on, and hopefully they would have the right plumbing plan when they came back.
|
Routing - PUBLIC WORKS | 3/24/2003 | | 3/26/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/26/2003 | | DONE |
|
|
|
Received two copies of revised sheets 1, 2,3,4,5,6,7,& 8 ( sewer & water Plans) Put with plans. kmm
|
Plan resubmittals received | | | 3/24/2003 | | |
|
|
|
Received one set of resubmittal sheets 1, 2, 3, 4, 5, 6, 7, 8. (Stamp from engineer was dated 3/14/00.
|
Pending Assignment by JCM | 3/17/2003 | | 3/24/2003 | | DONE |
John Menard
|
|
|
3/24/2003 11:27:14 JCM - activity updated through activity BLDA174 from case BLD03-00494.
|
Routing - PLUMBING | 3/24/2003 | | 3/24/2003 | | FAIL |
Lee Rice
|
|
|
need water and sewer Plan
|
Routing - PLANNING | 3/21/2003 | | 3/22/2003 | | PASS |
|
|
|
Approved as per CUP99-00158 (DAA) and per DRH00-208 and as noted on sheet 6 (MGS).
|
Routing - PUBLIC WORKS | 3/18/2003 | | 3/20/2003 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 3/20/2003 | | 3/20/2003 | | PASS |
|
|
|
ESC approved with attached conditions
|
Routing - PLANNING Land Div | 3/17/2003 | | 3/18/2003 | | PASS |
|
|
|
Lot 1 of Silverlake Terrace Subdivision.
|
Plans ACCEPTED BY PLAN TECH | | | 3/17/2003 | | FAIL |
|
|
|
1. Drainage Calcs required.(Ok per Brian M)
2. Current plans & struct. calcs. 2000 IBC
3. Copy of subdivision legals to verify designated non build areas.( Received legals on 3/21/03)
Faxed Architect and applicant. kmm
|
Plan routing begun/NEW & ADDTN | | | 3/17/2003 | | DONE |
|
|
|
|
Application received | | | 3/13/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/13/2003 | | DONE |
|
|
|
|
Fee Review-notes | 3/13/2003 | 3/13/2003 | | | |
|
|
|
|