Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 11/4/2003 | 4/26/2005 | | DONE |
|
|
|
|
First Notice | 3/13/2003 | 3/13/2003 | 4/26/2005 | | DONE |
|
|
|
|
DOC - Permit Finaled | 11/4/2003 | 11/4/2003 | 11/4/2003 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 11/4/2003 12:06:38 PM
|
BLD-Final | 11/3/2003 | 11/4/2003 | 11/4/2003 | A | PASS |
Jim Sly
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie All signatures for shell bldg....OK 11/4/2003 12:06:30 PM
|
Letter of compliance | | | 11/4/2003 | | DONE |
|
|
|
Letter of Compliance # 24322 issued 11-4-03.
|
FIRE-Final Inspection | 10/31/2003 | 11/3/2003 | 11/3/2003 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 11/4/2003 9:47:55 AM
|
BLD-Final | 10/31/2003 | 11/3/2003 | 11/3/2003 | P | NR |
Jim Sly
|
|
|
Scott; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
Code Occupancy Approval | | | 11/3/2003 | | PASS |
|
|
|
ALL IN AS REQUIRED FINAL SIGNED OFF.
|
BLD-Conference | 10/31/2003 | 10/31/2003 | 10/31/2003 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/31/2003 at 7:33:11 AM. Contact: ###-####.
|
FIRE-Final Inspection | 10/29/2003 | 10/30/2003 | 10/30/2003 | P | PASS |
Troy Cobbley
|
|
|
life safety finaled 10/30/2003 12:03:29 PM
|
BLD-Final | 10/29/2003 | 10/30/2003 | 10/30/2003 | P | NR |
Jim Sly
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
Print Occupancy Form | | | 10/28/2003 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 10/20/2003 | 10/21/2003 | 10/21/2003 | A | PASS |
Jim Sly
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Annette Moore Grid OK. 10/21/2003 11:15:24 AM
|
BLD-Conference | 10/3/2003 | 10/6/2003 | 10/6/2003 | P | PASS |
Tom Arcoraci
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Barbara Moore needs 6 8 head room to kids room 10/6/2003 3:25:04 PM
|
BLD-Framing/Rough-in | 9/9/2003 | 9/10/2003 | 9/10/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/9/2003 at 5:58:56 PM. Contact: ###-####. 9/10/2003 2:35:09 PM
|
BLD-Framing/Rough-in | 9/2/2003 | 9/3/2003 | 9/3/2003 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 9/2/2003 at 6:26:15 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/26/2003 | 8/27/2003 | 8/27/2003 | P | PASS |
Tom Arcoraci
|
|
|
###-#### russ//ext nail inspection ok pending plumb insp 8/27/2003 3:32:52 PM
|
BLD-Framing/Rough-in | 8/26/2003 | 8/27/2003 | 8/27/2003 | P | CANC |
Tom Arcoraci
|
|
|
###-#### russ//ext nailing inspection
|
BLD-Framing/Rough-in | 8/22/2003 | 8/25/2003 | 8/25/2003 | P | FAIL |
Jim Sly
|
|
|
russ ###-####--? NR.....Talked to Russ (superintendant) Needs Plan (sheet) showing shear panel locations.... 8/25/2003 4:50:39 PM
|
CHANGE STATUS TO (ISS) | | | 8/22/2003 | | DONE |
|
|
|
not fn yet per customer
|
BLD-Framing/Rough-in | 6/13/2003 | 6/16/2003 | 6/16/2003 | P | PART |
Tom Arcoraci
|
|
|
###-#### roof ok 6/16/2003 2:53:48 PM
|
BLD-Foundation | 5/8/2003 | 5/8/2003 | 5/8/2003 | P | PASS |
Russ Owen
|
|
|
###-#### interior footing complete. 5/8/2003 4:47:19 PM
|
BLD-Foundation | 5/1/2003 | 5/1/2003 | 5/1/2003 | A | PASS |
Russ Owen
|
|
|
|
BLD-Foundation | 4/29/2003 | 4/30/2003 | 4/30/2003 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/29/2003 at 9:31:51 PM. Contact: ###-####.
|
BLD-Foundation | 4/30/2003 | 4/30/2003 | 4/30/2003 | P | FAIL |
Russ Owen
|
|
|
Add top bar horizontal to basement wall. 4/30/2003 5:18:07 PM
|
DOC - Permit Finaled | 4/30/2003 | 4/30/2003 | 4/30/2003 | A | PASS |
Russ Owen
|
|
|
Finaled by inspector at 4/30/2003 10:33:57 AM
|
BLD-Framing/Rough-in | 4/25/2003 | 4/28/2003 | 4/28/2003 | A | FAIL |
Russ Owen
|
|
|
###-#### c/n posted. 4/28/2003 5:09:01 PM
|
BLD-Footing | 4/24/2003 | 4/25/2003 | 4/25/2003 | A | PASS |
Russ Owen
|
|
|
mike-- ###-####
|
(F) Reprint permit | | | 4/25/2003 | | |
|
|
|
|
Routing - FIRE | 4/18/2003 | | 4/24/2003 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 4/24/2003 | | 4/24/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2003 | | PASS |
|
|
|
|
Print Occupancy Form | | | 4/24/2003 | | DONE |
|
|
|
|
Telephone call | | | 4/24/2003 | | DONE |
|
|
|
permit ready
|
Telephone call | | | 4/24/2003 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Inspection Record Card- Bld | | | 4/24/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/24/2003 | | |
|
|
|
|
Plan assigned to (JCM) | 3/14/2003 | | 4/24/2003 | | PASS |
John Menard
|
|
|
4/24/2003 13:59:04 JCM - activity updated through activity BLDA022 from case BLD03-00497.
|
Routing - PLAN CHECK | 4/16/2003 | | 4/18/2003 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 4/18/2003 | | PASS |
|
|
|
Reviewed and approved plan revisions as submitted. JCM
|
Plan resubmittals received | | | 4/17/2003 | | DONE |
|
|
|
Received one letter from Sunberg Architects, and Three sets of T1of 1 and Three sets of A2of 6
|
Routing - PLANNING | 4/11/2003 | | 4/15/2003 | | PASS |
|
|
|
Approve per DRH00-242.
|
Routing - FIRE | 4/8/2003 | | 4/11/2003 | | FAIL |
Bill Alexander
|
|
|
Plans do not correlate. See notes
|
Plan Review Completed(1st rev) | | | 4/11/2003 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/9/2003 | | 4/10/2003 | | PASS |
|
|
|
Faxed a copy of the engineer's response to the consulting structural engineer for review. JCM Received a fax from the consulting engineer approving the resubmitted structural information. JCM
|
Plan resubmittals requested | | | 4/8/2003 | | |
|
|
|
Mailed the architect a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 4/3/2003 | | 4/8/2003 | | FAIL |
|
|
|
Taken to John
|
Plan resubmittals requested | | | 4/4/2003 | | |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer. JCM
|
Routing - PLANNING | 3/27/2003 | | 4/2/2003 | | FAIL |
|
|
|
Detailed plans need to be submitted to Planning. Contacted applicant.
|
Routing Off Site - STRUCTURAL | 3/17/2003 | | 4/1/2003 | | FAIL |
|
|
|
Called pdq to take to outside engineering. dkl received letter from the consulting structural engineer requesting revisions. JCM
|
Routing - Erosion and Sediment | 3/24/2003 | | 3/27/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing Off Site -Energy | 3/17/2003 | | 3/26/2003 | | PASS |
|
|
|
Called to pick up for outside energy review. dkl Received e-mail from energy review person indicating that the plans were approved (shell - envelope only approved). JCM
|
Routing - PUBLIC WORKS | 3/19/2003 | | 3/24/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/21/2003 | | DONE |
|
|
|
Received four sets of resubmittal sheets T1, EN1, EN2, A1. Routed to John Menard.
|
Routing - PLANNING Land Div | 3/17/2003 | | 3/18/2003 | | PASS |
|
|
|
Lot 3 of Times Square Subdivision.
|
Plans ACCEPTED BY PLAN TECH | | | 3/17/2003 | | PEND |
|
|
|
Faxed architect that the Energy Compliance Sheet, Title Sheet with building code data, Drainage Calcs and O&M, Vicinity Map, Energy Compliance Sheet are required.
|
Application received | | | 3/13/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/13/2003 | | DONE |
|
|
|
|