Permit Information
Permit NumberBLD03-00497
StatusFinaled
Name TIME SQUARE PROFESSIONAL PARK LLC
Site Address 1564 S TIMESQUARE LN
Project NameDr. Roy Rogers
Customer Number 
ePlanReviewNo
Description
Dr. Roy Rogers Office Building (Shell Only) - To construct a new 3,100 square foot, wood framed, one story office shell building with a 1230 square foot basement and related site improvements. This is a shell permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish the building and basement for occupancy. There is no plumbing, electrical or mechanical work approved under this review. All construction per the approved plans and attached comment list. PC#127-03/DRH00-00242/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 11/4/20034/26/2005 DONE
First Notice3/13/20033/13/20034/26/2005 DONE
DOC - Permit Finaled11/4/200311/4/200311/4/2003PPASS
DetailsJim Sly
Finaled by inspector at 11/4/2003 12:06:38 PM
BLD-Final11/3/200311/4/200311/4/2003APASS
DetailsJim Sly
scott; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie All signatures for shell bldg....OK 11/4/2003 12:06:30 PM
Letter of compliance  11/4/2003 DONE
Letter of Compliance # 24322 issued 11-4-03.
FIRE-Final Inspection10/31/200311/3/200311/3/2003APASS
DetailsTroy Cobbley
fire life safety finaled 11/4/2003 9:47:55 AM
BLD-Final10/31/200311/3/200311/3/2003PNR
DetailsJim Sly
Scott; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
Code Occupancy Approval  11/3/2003 PASS
ALL IN AS REQUIRED FINAL SIGNED OFF.
BLD-Conference10/31/200310/31/200310/31/2003PCANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/31/2003 at 7:33:11 AM. Contact: ###-####.
FIRE-Final Inspection10/29/200310/30/200310/30/2003PPASS
DetailsTroy Cobbley
life safety finaled 10/30/2003 12:03:29 PM
BLD-Final10/29/200310/30/200310/30/2003PNR
DetailsJim Sly
scott; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Print Occupancy Form  10/28/2003 DONE
BLD-Framing/Rough-in10/20/200310/21/200310/21/2003APASS
DetailsJim Sly
scott; Phone #: ###-#### Internet Inspection Request from: Annette Moore Grid OK. 10/21/2003 11:15:24 AM
BLD-Conference10/3/200310/6/200310/6/2003PPASS
DetailsTom Arcoraci
scott; Phone #: ###-#### Internet Inspection Request from: Barbara Moore needs 6 8 head room to kids room 10/6/2003 3:25:04 PM
BLD-Framing/Rough-in9/9/20039/10/20039/10/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/9/2003 at 5:58:56 PM. Contact: ###-####. 9/10/2003 2:35:09 PM
BLD-Framing/Rough-in9/2/20039/3/20039/3/2003PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/2/2003 at 6:26:15 PM. Contact: ###-####.
BLD-Framing/Rough-in8/26/20038/27/20038/27/2003PPASS
DetailsTom Arcoraci
###-#### russ//ext nail inspection ok pending plumb insp 8/27/2003 3:32:52 PM
BLD-Framing/Rough-in8/26/20038/27/20038/27/2003PCANC
DetailsTom Arcoraci
###-#### russ//ext nailing inspection
BLD-Framing/Rough-in8/22/20038/25/20038/25/2003PFAIL
DetailsJim Sly
russ ###-####--? NR.....Talked to Russ (superintendant) Needs Plan (sheet) showing shear panel locations.... 8/25/2003 4:50:39 PM
CHANGE STATUS TO (ISS)  8/22/2003 DONE
not fn yet per customer
BLD-Framing/Rough-in6/13/20036/16/20036/16/2003PPART
DetailsTom Arcoraci
###-#### roof ok 6/16/2003 2:53:48 PM
BLD-Foundation5/8/20035/8/20035/8/2003PPASS
DetailsRuss Owen
###-#### interior footing complete. 5/8/2003 4:47:19 PM
BLD-Foundation5/1/20035/1/20035/1/2003APASS
DetailsRuss Owen
BLD-Foundation4/29/20034/30/20034/30/2003ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 4/29/2003 at 9:31:51 PM. Contact: ###-####.
BLD-Foundation4/30/20034/30/20034/30/2003PFAIL
DetailsRuss Owen
Add top bar horizontal to basement wall. 4/30/2003 5:18:07 PM
DOC - Permit Finaled4/30/20034/30/20034/30/2003APASS
DetailsRuss Owen
Finaled by inspector at 4/30/2003 10:33:57 AM
BLD-Framing/Rough-in4/25/20034/28/20034/28/2003AFAIL
DetailsRuss Owen
###-#### c/n posted. 4/28/2003 5:09:01 PM
BLD-Footing4/24/20034/25/20034/25/2003APASS
DetailsRuss Owen
mike-- ###-####
(F) Reprint permit  4/25/2003  
Routing - FIRE4/18/2003 4/24/2003 PASS
DetailsBill Alexander
Routing - PLAN CHECK4/24/2003 4/24/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  4/24/2003 PASS
Print Occupancy Form  4/24/2003 DONE
Telephone call  4/24/2003 DONE
permit ready
Telephone call  4/24/2003 DONE
LEFT MESS THAT PERMIT IS READY
Inspection Record Card- Bld  4/24/2003  
Issue PAID IN FULL permit  4/24/2003  
Plan assigned to (JCM)3/14/2003 4/24/2003 PASS
DetailsJohn Menard
4/24/2003 13:59:04 JCM - activity updated through activity BLDA022 from case BLD03-00497.
Routing - PLAN CHECK4/16/2003 4/18/2003 PASS
Plan Reviewer's activity  4/18/2003 PASS
Reviewed and approved plan revisions as submitted. JCM
Plan resubmittals received  4/17/2003 DONE
Received one letter from Sunberg Architects, and Three sets of T1of 1 and Three sets of A2of 6
Routing - PLANNING4/11/2003 4/15/2003 PASS
Approve per DRH00-242.
Routing - FIRE4/8/2003 4/11/2003 FAIL
DetailsBill Alexander
Plans do not correlate. See notes
Plan Review Completed(1st rev)  4/11/2003 DONE
Routing Off Site - STRUCTURAL4/9/2003 4/10/2003 PASS
Faxed a copy of the engineer's response to the consulting structural engineer for review. JCM Received a fax from the consulting engineer approving the resubmitted structural information. JCM
Plan resubmittals requested  4/8/2003  
Mailed the architect a copy of the plan review comment list requesting revisions. JCM
Routing - PLAN CHECK4/3/2003 4/8/2003 FAIL
Taken to John
Plan resubmittals requested  4/4/2003  
Faxed the architect a copy of the comment list from the consulting structural engineer. JCM
Routing - PLANNING3/27/2003 4/2/2003 FAIL
Detailed plans need to be submitted to Planning. Contacted applicant.
Routing Off Site - STRUCTURAL3/17/2003 4/1/2003 FAIL
Called pdq to take to outside engineering. dkl received letter from the consulting structural engineer requesting revisions. JCM
Routing - Erosion and Sediment3/24/2003 3/27/2003 PASS
ESC approved with conditions attached to plans.
Routing Off Site -Energy3/17/2003 3/26/2003 PASS
Called to pick up for outside energy review. dkl Received e-mail from energy review person indicating that the plans were approved (shell - envelope only approved). JCM
Routing - PUBLIC WORKS3/19/2003 3/24/2003 PASS
Plan resubmittals received  3/21/2003 DONE
Received four sets of resubmittal sheets T1, EN1, EN2, A1. Routed to John Menard.
Routing - PLANNING Land Div3/17/2003 3/18/2003 PASS
Lot 3 of Times Square Subdivision.
Plans ACCEPTED BY PLAN TECH  3/17/2003 PEND
Faxed architect that the Energy Compliance Sheet, Title Sheet with building code data, Drainage Calcs and O&M, Vicinity Map, Energy Compliance Sheet are required.
Application received  3/13/2003  
Recd Pcfee & Taken To Pln CK  3/13/2003 DONE