Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-00498
StatusFinaled
Name SPRING CREEK APARTMENTS PHASE II
Site Address 695 E HOLLY ST
Project NameSpring Creek Aparts. Phase 2
Customer Number 
ePlanReviewNo
Description
Spring Creek Apartments Phase 2 * (Section 2 of 2) A two hour area separation wall will be constructed to divide this 16 unit apartment building into two. This section is 5 units, at, 4,371 sq.ft. two story with a basement, type -One hour, apartment building. This section of the building contains 2 - A Units @ 955 sq.ft. each and 3 - B Units @ 708 sq.ft. each. NOTE: This building requires a fire alarm system per UBC Section 310.10. All construction per the approved plans and attached comment list. Refer to BLD 02-03085 for other side of area separation wall. DR93-00068 CUP93-00018 PC#821-02 MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 3/24/20043/24/2004 DONE
Permanent occupancy  3/24/2004 DONE
Perm. Occ. Cert. # 10050 issued 3-24-04 to the Spring Creek Apts., Sec. 2 of 2.
Permanent Occupancy 3/23/20043/23/2004 DONE
Details
FIRE-Final Inspection3/19/20043/19/20043/19/2004PPASS
DetailsRick Jackson
FIRE-Final Inspection3/11/20043/15/20043/15/2004PFAIL
DetailsRick Jackson
Mike, ###-#### voltage drop nearly 3 volts; NAC's not wired per plans 3/15/2004 4:38:58 PM
FIRE-Final Inspection12/12/200312/12/200312/12/2003APART
DetailsRick Jackson
mike; Phone #: ###-#### Internet Inspection Request from: Darla Downs temp occupancy approved per Dave Miller pending installation of fire alarm 12/12/2003 10:09:12 AM
Temporary occupancy  12/12/2003 DONE
Temp. Occ. Cert. # 5041 issued 12-12-03 to the Spring Creek Apts.
FIRE-Final Inspection11/26/200311/26/200311/26/2003PNR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/26/2003 at 9:28:20 AM. Contact: ###-####. need alarm plans per plans review notes 11/26/2003 2:14:54 PM
FIRE-Final Inspection11/25/200311/25/200311/25/2003PFAIL
DetailsRick Jackson
mike sign off sheets are in 102; Phone #: ###-#### Internet Inspection Request from: Darla Downs need smoke detectors at units #106 and 206 in hallway to bedrooms and at vaulted ceiling area; hang extinguishers; submit alarm plans per plan review note number 3 - a pull station and one horn/strobe is installed on the first floor of each stair - work performed without permit 11/25/2003 2:48:58 PM
Code Occupancy Approval11/24/200311/24/200311/24/2003PPASS
DetailsWm. Michael Meloy
Compliance met. 11/24/2003 3:10:23 PM
BLD-Framing/Rough-in8/26/20038/27/20038/27/2003ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/26/2003 at 9:22:20 AM. Contact: ###-####.
BLD-Framing/Rough-in8/27/20038/27/20038/27/2003PFAIL
DetailsDave Hannah
BLD-Conference8/18/20038/19/20038/19/2003ADONE
DetailsDave Hannah
BLD-Conference8/18/20038/18/20038/18/2003PCANC
DetailsDave Hannah
MIKE PLEASE CALL FIRST SO HE CAN MAKE SURE THAT HIS HEATING GUY IS THERE..; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Footing7/25/20037/28/20037/28/2003ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/25/2003 at 12:46:40 PM. Contact: ###-####.
BLD-Framing/Rough-in7/28/20037/28/20037/28/2003APART
DetailsDave Hannah
ext sheet rock shear nailing and strapes hold downs ok to cover south and east sides
BLD-Conference7/24/20037/24/20037/24/2003PDONE
DetailsSteven Webb
Scheduled by a contractor via Hello! on 7/24/2003 at 8:23:37 AM. Contact: ###-####.
BLD-Conference7/23/20037/23/20037/23/2003PDONE
DetailsDave Hannah
b j ###-####--call 1st before insp
BLD-Framing/Rough-in6/17/20036/17/20036/17/2003PNR
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore looked at wall and floor to floor straping and shear wall details 6/17/2003 4:59:17 PM
BLD-Foundation5/21/20035/22/20035/22/2003APASS
DetailsDave Hannah
DAVE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Foundation5/19/20035/19/20035/19/2003PPART
DetailsDave Hannah
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore north half of high wall 5/19/2003 3:18:49 PM
BLD-Foundation5/15/20035/15/20035/15/2003PPART
DetailsDave Hannah
dave; Phone #: ###-#### Internet Inspection Request from: Annette Moore all 2 ft stem wall 5/15/2003 5:24:23 PM
Issue PAID IN FULL permit  4/7/2003  
(F) Reprint permit  4/7/2003  
Telephone call  4/4/2003 DONE
left mess that permit is ready
Inspection Record Card- Bld  4/3/2003  
Print Occupancy Form  4/3/2003  
Inspection Record Card- Bld  4/3/2003  
Print Occupancy Form  4/3/2003  
Plan assigned to (M_P) 3/13/20034/2/2003 PASS
DetailsMike Phillips
4/2/2003 16:24:16 M_P - activity updated through activity BLDA022 from case BLD03-00498.
Routing - PLAN CHECK3/28/2003 4/2/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  4/2/2003 DONE
Print Pending Permit.LaserJet4  4/2/2003 DONE
Case Summary (BLD)  4/2/2003 DONE
Routing - FIRE3/27/2003 3/28/2003 PASS
resubmittal acceptable
Routing - PLAN CHECK3/26/2003 3/27/2003  
Plan resubmittals received  3/27/2003 DONE
Received two sets of resubmittal sheets A1.0 and A1.1 with transmittal. Routed to Mike Phillips.
Routing - FIRE3/19/2003 3/25/2003 FAIL
REview comments faxed to Tamura, Mark Sanders. Proper turning radius required for proposed FD access roadway.
Plan resubmittals received  3/18/2003 DONE
Received two copies of revised sheets, A0, A2.0, A2.1, A2.2, A2.3, A2.4, A2.5, A3.9, A4.1, A4.2, A4.3, A4.4, AQ4.5, A4.6, A8.0. One copy of cover letter. Routed to Mike P. kmm
Routing - FIRE3/13/2003 3/14/2003 FAIL
Routing - PUBLIC WORKS3/13/2003 3/13/2003 DONE
Route to Louise for refiguring sewer fees for multi permits.
Routing - PLAN CHECK3/13/2003 3/13/2003 FAIL
Second review failed, e-mailed comments to architect requesting additional information for further review prior to issuing permit.
Print permit w/o conditions  3/13/2003  
Application received  3/13/2003