(KOPPER KITCHEN) To remodel the existing 6,277 sq.ft. restaurant by expanding one vestibule on the west side of the building & removing the vestibule on the south side, construction of new entrance canopys, installing new walk in cooler, installing new exterior manufactured stonework and EFIS finish, removing approxmatley 3 feet of the roof overhang on the west and south sides and remodel of portions of the interior seating areas per approved plans and DRH03-00026. ESC03-00383 This building is not fire sprinklered. (pc#147-03) rmh
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 12/18/20034/26/2005 DONE
DOC - Permit Finaled12/18/200312/18/200312/18/2003APASS
DetailsJim Storey
Finaled by inspector at 12/18/2003 9:40:07 AM
BLD-Final12/17/200312/18/200312/18/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/17/2003 at 6:01:01 PM. Contact: ###-####. l/c isued no plm.work performed. 12/18/2003 9:40:06 AM
BLD-Final12/16/200312/17/200312/17/2003AFAIL
DetailsJim Storey
Stan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes remove dead bolt from back exit door. 12/17/2003 1:40:09 PM
FIRE-Final Inspection12/15/200312/16/200312/16/2003APASS
DetailsRick Jackson
stan wiggins; Phone #: ###-#### Internet Inspection Request from: Barbara Moore per architect the occupant load in bar and back dining area require one exit and the two exits from the main dining area are adequate 12/16/2003 10:14:13 AM
FIRE-Final Inspection12/12/200312/12/200312/12/2003PFAIL
DetailsRick Jackson
Stan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes exit door hardware and exit signs where dorrs have changed; need from architect required exits and occupant loads to verify exiting requirements 12/12/2003 4:06:43 PM
BLD-Framing/Rough-in12/4/200312/5/200312/5/2003APART
DetailsTom Arcoraci
stan -###-#### ok to cover vestibule 12/5/2003 9:16:27 AM
BLD-Footing10/28/200310/29/200310/29/2003APASS
DetailsJim Storey
ft - stan - ###-#### pad footings on north side ok. 10/29/2003 8:56:43 AM
BLD-Framing/Rough-in10/29/200310/29/200310/29/2003APASS
DetailsJim Storey
north west corner of blding sheer nailling approved.
Override - Parcel Holds  10/28/2003  
BLD-Conference10/7/200310/8/200310/8/2003APASS
DetailsJim Storey
Please call before inspection//stan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Issue PAID IN FULL permit  9/9/2003 DONE
Telephone call  6/30/2003 DONE
LEFT MESS FOR PETE ROCKWELL THAT PERMIT IS READY
Routing - PLAN CHECK4/17/2003 4/23/2003 DONE
Plan resubmittals received  4/23/2003 DONE
Received three copies of revised sheet A-1.1. One copy of architect letter and engineer letter. Routed to Ron H. kmm
Case Summary (BLD)  4/23/2003 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/23/2003 DONE
Inspection Record Card- Bld  4/23/2003  
PLANS/APPL TAKEN TO FRONT DESK  4/23/2003 DONE
Telephone call  4/23/2003 DONE
LEFT MESS FOR PETE ROCKWELL THAT PERMIT IS READY
Plan assigned to (R_H)3/25/2003 4/23/2003 PASS
Details
4/23/2003 14:13:47 RMH - activity updated through activity BLDA022 from case BLD03-00589.
Routing - FIRE4/11/2003 4/17/2003 PASS
approved with no written review comments
Case Summary (BLD)  4/11/2003 DONE
Routing - PLAN CHECK4/7/2003 4/11/2003 FAIL
Faxed & Mailed requirements to the architect on 4/11/03, Routed plans to the fire department same day,
Routing - PLUMBING4/2/2003 4/7/2003 PASS
no plumbing
Routing - PLANNING3/27/2003 4/2/2003 PASS
Approved per DRH03-26.
Routing - Erosion and Sediment3/26/2003 3/27/2003 PASS
Waiver Letter. Waiver approved with conditions attached to plans. ESC03-00383
Routing - PUBLIC WORKS3/25/2003 3/26/2003 PASS
Application received  3/24/2003  
Recd Pcfee & Taken To Pln CK  3/24/2003  
Plans ACCEPTED BY PLAN TECH  3/24/2003 DONE