Permit Information
Permit NumberBLD03-00602
StatusFinaled
Name DOGWOOD PLAZA APARTMENTS
Site Address 1755 N LINDA VISTA LN
Project NameDogwood Plaza
Customer Number 
ePlanReviewNo
Description
Dogwood Plaza * To construct a new 40,666 sq.ft. 3 story, wood framed, 50 unit apartment building for senior living. Each unit is 534 sq.ft. one bedroom, one bath. This building is fully fire sprinklerd for area increase and must meet NFPA 13. All construction per the approved plans and attached comment list. MJP DRH02-00236 CUP02-00146 PC# 145-03
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 6/21/20044/26/2005 DONE
BLD-Final6/18/20046/21/20046/21/2004APASS
DetailsJim Sly
chuck; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Perm Occ. :) 6/21/2004 12:36:13 PM
Permanent occupancy  6/21/2004 DONE
Perm. Occ. Cert. # 10194 issued 6-21-04 to the Dogwood Plaza Apartments.
FIRE-Final Inspection6/18/20046/18/20046/18/2004PPASS
DetailsTroy Cobbley
Fire life safety finaled
FIRE-Final Inspection6/16/20046/17/20046/17/2004AFAIL
DetailsTroy Cobbley
Chuck; Phone #: ###-#### Provide signage on doors, driveway and painting of access as discussed. Provide heat vent in trash shoot for heating of wet pipe sprinkler system. HVAC unit does not shut down upon alarm activation. 6/17/2004 3:12:15 PM
BLD-Final6/17/20046/17/20046/17/2004PNR
DetailsJim Sly
Chuck; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes NR But walked thru with Chuck and pointed out a few places that need fire caulking. Waiting for Fire and Mech approval. 6/17/2004 2:13:41 PM
Permanent Occupancy 6/17/20046/17/2004 DONE
Details
PubWorks Occupancy Approval6/14/20046/14/20046/14/2004 DONE
Drainage project complete, signed permanent occupancy 6/14/04. R.Rokovitz
Plan resubmittals received  5/21/2004  
BLD-Framing/Rough-in5/10/20045/11/20045/11/2004APART
DetailsJim Sly
chuck; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 5/11/2004 12:38:34 PM 1st floor corridor OK. 5/11/2004 2:55:43 PM
BLD-Framing/Rough-in5/4/20045/5/20045/5/2004APART
DetailsJim Sly
Chuck; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 5/5/2004 11:19:36 AM 5/5/2004 12:52:18 PM 2nd floor corridor OK. 5/5/2004 4:47:56 PM
Print Occupancy Form  5/5/2004 DONE
BLD-Framing/Rough-in4/30/20045/3/20045/3/2004ANR
DetailsJim Sly
chuck ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in4/14/20044/15/20044/15/2004APART
DetailsJim Sly
chuck; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 4/15/2004 10:35:00 AM 3rd floor ceiling and corridor OK. 4/15/2004 10:35:30 AM
BLD-Conference4/1/20044/2/20044/2/2004ACANC
DetailsJim Sly
chuck; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Energy code compliance3/9/20043/10/20043/10/2004APASS
DetailsJim Sly
chuck; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Conference3/9/20043/10/20043/10/2004APASS
DetailsTroy Cobbley
First floor sprinkler piping ok to cover in the hard lid areas 3/10/2004 11:32:00 AM
BLD-Conference3/9/20043/10/20043/10/2004PPASS
DetailsTroy Cobbley
rooms where risers to 2nd and 3rd floor ok to cover 3/10/2004 4:12:29 PM
BLD-Framing/Rough-in3/2/20043/3/20043/3/2004PPASS
DetailsJim Sly
CHUCK; Phone #: ###-#### Internet Inspection Request from: Darla Downs 1st floor OK. 3/3/2004 4:42:20 PM
BLD-Framing/Rough-in2/24/20042/25/20042/25/2004PPART
DetailsJim Sly
CHUCK; Phone #: ###-#### Internet Inspection Request from: Darla Downs 1st floor OK for (underfloor) insulation. 2/25/2004 3:45:16 PM
FIRE-Final Inspection2/23/20042/24/20042/24/2004AFAIL
DetailsTroy Cobbley
Inspection was not a final but for inspection on the remaining fire dampers. Fire dampers are ok to cover 2/24/2004 2:48:02 PM
FIRE-Sprinkler Rough-in2/19/20042/20/20042/20/2004ANR
DetailsTroy Cobbley
Inspection was for installation of the fire dampers on the third floor. As of 11:20 am only three had been installed. 2/20/2004 11:17:28 AM
FIRE-Sprinkler Rough-in2/19/20042/20/20042/20/2004ACANC
DetailsTroy Cobbley
chuck; Phone #: ###-#### Internet Inspection Request from: Annette Moore
FIRE-Conference2/20/20042/20/20042/20/2004PPART
DetailsTroy Cobbley
I inspected the east wing fire damper. Installation appears to be OK. Asked the installing contractor to provide additional fire caulking between damper and housing 2/20/2004 3:11:00 PM
FIRE-Sprinkler Rough-in2/19/20042/19/20042/19/2004PCANC
DetailsTroy Cobbley
Inspection was actually for fire dampers.. See building permit for entry 2/19/2004 1:36:54 PM
BLD-Framing/Rough-in2/19/20042/19/20042/19/2004PPASS
DetailsJim Sly
chuck; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 2nd floor OK to rock. 2/19/2004 2:01:48 PM
FIRE-Conference2/19/20042/19/20042/19/2004PDONE
DetailsTroy Cobbley
Spoke with the superintendant and the mechanical contractor about access to the fire dampers on the third floor. Dixie showed up and we agreed that access from the attic was adequate
FIRE-Sprinkler Rough-in2/17/20042/18/20042/18/2004PCANC
DetailsTroy Cobbley
Inspection was for covering the sprinkler piping on the 2nd floor. See sprinkler permit for history. 2/18/2004 3:30:00 PM
BLD-Framing/Rough-in2/17/20042/18/20042/18/2004PCANC
DetailsJim Sly
early if possilbe- chuck; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Sprinkler Rough-in2/12/20042/13/20042/13/2004PFAIL
DetailsTroy Cobbley
sprinkler insulation in floor does not provide less than 6" space in the combustible cavity. Additional insulation will be required 2/13/2004 4:14:16 PM
BLD-Framing/Rough-in2/11/20042/12/20042/12/2004PPART
DetailsJim Sly
chuck ; Phone #: ###-#### Internet Inspection Request from: Annette Moore Part of 2nd floor. 2/12/2004 4:07:11 PM
BLD-Framing/Rough-in2/9/20042/10/20042/10/2004APART
DetailsJim Sly
chuck; Phone #: ###-#### Internet Inspection Request from: Annette Moore N/S wing 2nd floor OK to insulate ext walls and floor/ceiling. 2/10/2004 10:59:50 AM
BLD-Framing/Rough-in2/4/20042/5/20042/5/2004APART
DetailsJim Sly
chuck; Phone #: ###-#### Internet Inspection Request from: Annette Moore 3rd floor frame OK. 2/5/2004 11:16:20 AM
BLD-Framing/Rough-in1/27/20041/28/20041/28/2004PPASS
DetailsJim Sly
chuck; Phone #: ###-#### Internet Inspection Request from: Darla Downs 3rd floor.....N/S wing OK. 1/28/2004 5:16:58 PM
BLD-Framing/Rough-in1/26/20041/27/20041/27/2004PPART
DetailsJim Sly
Chuck; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 3rd floor OK 1/27/2004 4:33:32 PM
BLD-Framing/Rough-in1/23/20041/26/20041/26/2004ACANC
DetailsJim Sly
chuck; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in1/22/20041/23/20041/23/2004APART
DetailsJim Sly
chuck; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie partial insp of third floor....Do not insulate. 1/23/2004 11:06:15 AM
BLD-Framing/Rough-in1/23/20041/23/20041/23/2004PNR
DetailsJim Sly
chuck; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in12/17/200312/18/200312/18/2003APART
DetailsJim Sly
Chuck; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes OK to pre-rock areas needed. 12/18/2003 11:36:21 AM
BLD-Framing/Rough-in12/12/200312/15/200312/15/2003APART
DetailsJim Sly
chuck; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Terricon special insp to OK interior shear walls. 12/15/2003 12:48:58 PM
BLD-Framing/Rough-in12/4/200312/5/200312/5/2003APART
DetailsJim Sly
chuck--shear nail; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Terricon special inspection report OK'd 2nd floor shear....and possibly the third floor.....report somewhat unclear. Will follow up next inspection.
12/5/2003 11:23:53 AM 12/5/2003 11:24:45 AM
BLD-Framing/Rough-in12/1/200312/1/200312/1/2003PPART
DetailsJim Sly
Chuck -- sheer; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 12/1/2003 4:05:11 PM 2nd floor back side shear OK pend special insp reports. 12/1/2003 4:14:58 PM
BLD-Framing/Rough-in11/24/200311/25/200311/25/2003PPART
DetailsJim Sly
shear inspection please//chuck; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Gen notes on plans shows Special insp req for all shear systems.....Pointed out to super (last visit). Terricon insp...Max Jensen has completed an insp of 2nd floor.......Need to verify Max's certifications for this type of inspection....Have on site at next inspection. 11/25/2003 3:14:38 PM 11/25/2003 3:15:54 PM
BLD-Framing/Rough-in11/14/200311/17/200311/17/2003AFAIL
DetailsJim Sly
shear wall//chuck; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 11/17/2003 11:02:55 AM 1st floor shear....C/N Epoxy retro fit HDs installed w/o special insp.....Terricon to provide letter stating all Req. special insp for this project.....Appr plan....Gen notes page shows special insp req for all shear assemblies....nailing, hold downs, Etc. Install HD5a's per plan. Provide sill (sole plate) Nailing at 2"oc 16d. per detail. 11/17/2003 11:36:09 AM
FIRE-Conference10/8/200310/8/200310/8/2003PPART
DetailsRick Jackson
received call from Bill R. of United Watrer about a new hydrant installed for this project. Dave Miller asked to visit the site and let him know what was going on. Due to ACHD requirements the hydrant was approved to be moved about 50 ft south as noted on approved plans 10/8/2003 4:11:04 PM
BLD-Concrete9/17/20039/18/20039/18/2003APART
DetailsJim Sly
chuck; Phone #: ###-#### Internet Inspection Request from: Marc Lileks Slab pour....asked for Energy code compliance statement....Terricon special insp on site. 9/18/2003 9:56:10 AM
BLD-Concrete9/10/20039/11/20039/11/2003APART
DetailsJim Sly
chuck; Phone #: ###-#### Internet Inspection Request from: Annette Moore Fairview ...N by Combs car corral...Betw M.G. @ 5mi Slab pour....Terricon on site. 9/11/2003 10:13:13 AM
BLD-Concrete8/18/20038/19/20038/19/2003APART
DetailsRuss Owen
###-#### chuck. Subject to special inspection 8/19/2003 12:25:12 PM
BLD-Concrete8/14/20038/15/20038/15/2003APART
DetailsRuss Owen
chuck; Phone #: ###-#### Internet Inspection Request from: Darla Downs Elevator pits subject to s-i. 8/15/2003 10:54:47 AM
BLD-Foundation8/8/20038/11/20038/11/2003PPART
DetailsTom Arcoraci
###-#### pending spec insp 8/11/2003 2:26:53 PM
BLD-Footing8/6/20038/7/20038/7/2003APART
DetailsJim Sly
Before 10 please//chuck; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Stepped footing at E. wall appears OK.....Terricon special inspection agency also inspecting rebar and taking samples at owners request. 8/7/2003 10:54:51 AM
BLD-Footing8/5/20038/5/20038/5/2003PPART
DetailsTom Arcoraci
chuck; Phone #: ###-#### Internet Inspection Request from: Barbara Moore pending terra con report 8/5/2003 2:29:34 PM
BLD-Conference8/1/20038/4/20038/4/2003APART
DetailsJim Sly
208/###-#### chuck !st pre constr conf...Talked to Chuck (job super)..about "how it's suppose to Work" 8/4/2003 1:06:08 PM
Issue PAID IN FULL permit  6/20/2003 DONE
Plan resubmittals received  6/18/2003 DONE
received letter of transmittal and one A-4.1 sheet and taken to Mike P.
Telephone call  6/11/2003 DONE
LEFT MESS FOR DAVID GRUBB THAT PERMIT IS READY
Routing - PLAN CHECK6/9/2003 6/10/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/10/2003 DONE
Print Pending Permit.LaserJet4  6/10/2003 DONE
Inspection Record Card- Bld  6/10/2003 DONE
Print Occupancy Form  6/10/2003 DONE
Print Occupancy Form  6/10/2003 DONE
Plan assigned to (M_P)3/25/2003 6/10/2003 PASS
DetailsMike Phillips
6/10/2003 13:10:39 M_P - activity updated through activity BLDA022 from case BLD03-00602.
Routing - FIRE6/2/2003 6/9/2003 PASS
Resubmittal acceptable.
Routing - PLUMBING5/30/2003 6/2/2003 PASS
Plan resubmittals received  6/2/2003 DONE
Received United Water letter. Routed to Mike P. and put in file. kmm
Routing - PLAN CHECK5/29/2003 5/30/2003  
Routing - PUBLIC WORKS5/30/2003 5/30/2003 PASS
DetailsBrandi Dominguez
Meeting  5/29/2003 DONE
Met with Chad Jones, B&A engineers to discuss FD access and hyd issues. Dave Miller approved access on condition that a NFPA 13 sprinkler system be installed. He will check with UW to get proposed hydrant moved to street so as to be a public hydrant, not fed from the AS ug main. He will resubmit revised plans.
Plan resubmittals received  5/29/2003 DONE
letter of transmittal, two copies of C-1 taken to Mike P
Plan resubmittals received  5/28/2003 DONE
Received one copy of cover letter to Sam Rogers and two copies of partial site plans (81/2 by 11). Put with plans. kmm
Plan resubmittals received  5/28/2003 DONE
Two letters of transmittal, Response letter to Mike P. three revised structural calculations.two sets of S1.0, S2.0, S3.0, S4.0, S5.0, S6.0, S6.1, S7.0, S7.1, S8.0, S8.1, A-1.1, A-1.2, A-3.1, A-3.2, A-3.3, A-3.4, A-5.2, A-5.3, A-6.1, A-6.2, A-9.1, A-10.1, A10.2, A-10.3, A-12.1, A-12.2, A13.1, A-14.1, A-15.1, A-15.2, took to Mike P
Routing - FIRE5/16/2003 5/28/2003 FAIL
Review comments faxed to architect, David Grubbs
Routing - PLAN CHECK4/11/2003 5/16/2003 FAIL
Plan review completed, sent correction report to architect, requesting additional information be submitted for further review prior to issuing permit.
Routing Off Site -Energy5/6/2003 5/14/2003 PASS
Contacted Ron O. for energy review. kmm
Comment noted and sent to architect. Responce required but will be review by plan reviewer.
Plan resubmittals received  5/5/2003 DONE
received four copies of revised sheets P1.1, P1.2, P1.3, P9.2, routed to Mike P. kmm
Plan resubmittals received  5/5/2003 DONE
Received seven copies of resubmittal sheet C-1. (Three are rolled up for Brian Murphy). Routed to Mike Phillips.
Routing - PLUMBING4/9/2003 4/11/2003 FAIL
1.UPC section 711.0 suds relief-the kitchen sink drains must be eight feet from a vertical stack. the plans show five feet. 2. UPC section 605.3 the shutoff valves for each dwellling unit shall be located in that dwelling unit. see detail 1/P9.2.
Routing - PLANNING4/8/2003 4/9/2003 PASS
Approved per DRH02-246 and as noted on sheet L-1. Received information regarding location of benches and bike rack which fulfills all of CUP requirements as well.
Routing Off Site - STRUCTURAL3/25/2003 4/8/2003 FAIL
contacted PDQ for outside engineering. kmm
Additional comments required, review will be completed by plan reviewer.
Routing - PLANNING4/3/2003 4/8/2003 PASS
DetailsSusan Riggs
Pending Design Review approval (Sara Schafer).
Routing - Erosion and Sediment4/1/2003 4/3/2003 PASS
ESC approved with attached conditions. RP listed prior to start of construction.
Routing - PUBLIC WORKS3/25/2003 4/1/2003 FAIL
sewer plans to be revised. kmm
Plans ACCEPTED BY PLAN TECH  3/27/2003 DONE
Received struct. calcs. routed to Mike P. kmm
Plans ACCEPTED BY PLAN TECH  3/25/2003 PEND
Waiting for two extra sets of structural calcs.
Routing - PLANNING Land Div3/25/2003 3/25/2003 PASS
Lot 1 of J Bar J Subdivision.
Plan routing begun/NEW & ADDTN  3/25/2003 DONE
Application received  3/25/2003  
Recd Pcfee & Taken To Pln CK  3/25/2003  
Fee Review-notes3/25/20033/25/2003