Case Summary (BLD) | | | 10/10/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/30/2005 | | DONE |
|
|
|
Phone call with Tom Mohr regarding status of Design Review approval. Resubmittal of Design Review not required, but can reissue approval if building permit documents are consistent with original approvals. Phone discussion covered the problems of well drilling in relation to delay of construction activity and that the conditional use permit is still valid.
|
Case Summary (BLD) | | | 6/28/2005 | | |
|
|
|
|
MISC ACTIONS | | | 6/28/2005 | | PART |
Tony Young
|
|
|
The entries made by #415 on 8/17 and 8/24 were made in error. Actual permit expiration date was 11/14/04.
|
DOC - Permit Expired | 8/24/2004 | 8/24/2004 | 8/24/2004 | P | PASS |
Tony Young
|
|
|
Expired by inspector at 8/24/2004 1:03:46 PM
|
BLD-Aging Inspection | 8/17/2004 | 8/17/2004 | 8/17/2004 | | FAIL |
Tony Young
|
|
|
void per Bob A 8/24/2004 1:03:44 PM
|
Issue PAID IN FULL permit | | | 5/14/2004 | | DONE |
|
|
|
|
Telephone call | | | 5/6/2004 | | DONE |
|
|
|
per bob archibald void permit after may 14th 2004/mls
|
Agreement of Future work | 5/5/2004 | 5/5/2004 | 5/5/2004 | | PART |
Bob Archibald
|
|
|
Phone conference with Tom Mohr regarding expired application. Tom has agreed to pay/pickup permit no later than 05/14/04. Failure to obtain permit prior to the end of buisness day this date shall result in expiration of application. If work does not start, due to unforseen circumstances, within 180 days of permit issuance, a one time, 180 day extension may be requested in writing prior to permit expiration.
|
Ready Permit EXTENDED | | | 4/22/2004 | | DONE |
|
|
|
per letter from jennifer gilliland extend until March 10th, 2004/mls
|
Telephone call | | | 4/8/2004 | | DONE |
|
|
|
left mess for tom will need to void if not pickup in a week
|
Telephone call | | | 3/24/2004 | | DONE |
|
|
|
talked to tom regarding apartments, per linda hartwell will need to pickup permit by march 31st or will expire. Tom asked if an extension could be applied for & told him in writing to jenifer for request
|
Telephone call | | | 2/26/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Telephone call | | | 1/8/2004 | | DONE |
|
|
|
left mess for tom mohr that permit is ready
|
Inspection Record Card- Bld | | | 10/16/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/16/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/16/2003 | | DONE |
|
|
|
|
Telephone call | | | 10/16/2003 | | DONE |
|
|
|
Faxed fees sheet to Tom with a note that we need ACHD info
|
Routing - PLAN CHECK | 10/3/2003 | | 10/6/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2003 | | DONE |
|
|
|
|
Telephone call | | | 10/6/2003 | | DONE |
|
|
|
Left message for Thomas Mohr to let him know that a Demo permit needs to be pulled before this permit can be issued//10/6/03 BAM
|
Plan assigned to (M_P) | 3/25/2003 | | 10/6/2003 | | PASS |
Mike Phillips
|
|
|
10/6/2003 07:59:49 M_P - activity updated through activity BLDA022 from case BLD03-00609.
|
Routing - FIRE | 9/25/2003 | | 10/3/2003 | | PASS |
|
|
|
Resubmittal acceptable
|
Routing - PLAN CHECK | 9/22/2003 | | 9/25/2003 | | PEND |
|
|
|
Waiting for others to approve prior to issuing permit.
|
Plan resubmittals received | | | 9/24/2003 | | DONE |
|
|
|
Received one copy of United Water Letter and fire hydrant site plan 8x 11 1/2. Routed to Mike P. kmm
|
Plan resubmittals received | | | 9/24/2003 | | DONE |
|
|
|
Received two sets of sheets A2.1, A3.0, A4.0, A7.0, A7.1, A8.0, A9.0, taken to Mike P.
|
Routing - PUBLIC WORKS | 9/15/2003 | | 9/22/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/22/2003 | | 9/22/2003 | | FAIL |
|
|
|
Waiting for details on washer to meet accessibility, one-hour wall to roof deck, fire flow and fire hydrant location.
|
Routing - PLAN CHECK | 6/19/2003 | | 9/15/2003 | | |
|
|
|
brian needed this plan
|
Routing - PUBLIC WORKS | 6/13/2003 | | 6/19/2003 | | FAIL |
|
|
|
Requires drainage plan revisions. Per Brian M. kmm
|
Routing - PLAN CHECK | 5/22/2003 | | 6/13/2003 | | |
|
|
|
Routing to Public Works.
|
Plan resubmittals received | | | 5/29/2003 | | DONE |
|
|
|
Transmittal letter from Tamura with sheets 3.0, 7.0, 7.1, 8.0, 9.0, 10.0 and taken to Mike P.,
|
Routing - PLUMBING | 5/22/2003 | | 5/22/2003 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/15/2003 | | 5/22/2003 | | FAIL |
|
|
|
requires drainage plan
|
Routing - FIRE | 5/7/2003 | | 5/14/2003 | | FAIL |
|
|
|
Fire hydrant location and flow and additional fire resistive construction details required. Review comments faxed to architect.
|
Routing - PLAN CHECK | 4/9/2003 | | 5/7/2003 | | FAIL |
|
|
|
Plan review completed, sent correction report to architect requesting additional information to be submitted for further review prior to issuing permit.
|
Print permit w/o conditions | | | 5/7/2003 | | |
|
|
|
|
Plan resubmittals received | | | 4/10/2003 | | DONE |
|
|
|
Received two copies of resubmittal sheets P2.0 and C4.0 with transmittal. Routed to Mike Phillips.
|
Routing - PLUMBING | 4/8/2003 | | 4/9/2003 | | FAIL |
|
|
|
provide a plan showing sewer and water services, correct detail of water sizing serving units, page P2.0, 1 1/4" min. out of backflow preventor, 1 1/4" to each side of the building, 1" to each unit.
|
Pending Assignment by JCM | 3/26/2003 | | 4/9/2003 | | DONE |
John Menard
|
|
|
4/9/2003 16:39:55 DKL - activity updated through activity BLDA170 from case BLD03-00609.
|
Routing - PLANNING | 4/7/2003 | | 4/7/2003 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 4/3/2003 | | 4/4/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 3/27/2003 | | 4/3/2003 | | FAIL |
|
|
|
requires drainage plan
|
Routing Off Site -Energy | 3/26/2003 | | 4/3/2003 | | FAIL |
|
|
|
Called Ron O for outside energy review. dkl
Additional review will be done by plan review.
|
Routing - PLANNING Land Div | 3/26/2003 | | 3/26/2003 | | PASS |
|
|
|
Lot 1 of Block 1 of Casitas Norte Subdivision.
|
Plans ACCEPTED BY PLAN TECH | | | 3/26/2003 | | DONE |
|
|
|
|
Application received | | | 3/25/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/25/2003 | | DONE |
|
|
|
|
Fee Review-notes | 3/25/2003 | 3/25/2003 | | | |
|
|
|
|