Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD03-00634
StatusFinaled
Name BRIGHTON CORPORATION
Site Address 5296 E BARBER STATION WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2004 sq. ft. two story single family dwelling with a 561 sq. ft. attached two car garage, a 56 sq. ft. covered entry way and 170 sq. ft. of covered concrete patio at side of structure per approved plans, all engineering/red-lining and attached requirement lists. (1st floor 1099 sq. ft.)(2nd floor 905 sq. ft.) PC #165 CUP #98-116 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/2/200310/3/200310/3/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/2/2003 at 3:41:36 PM.
DOC - Permit Finaled10/3/200310/3/200310/3/2003APASS
DetailsJim Storey
Finaled by inspector at 10/3/2003 11:07:23 AM
BLD-Final10/2/200310/2/200310/2/2003PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/2/2003 at 7:16:03 AM. provide protection of wood in contact with wood sidding/ 10/2/2003 2:12:44 PM
BLD-Final10/1/200310/1/200310/1/2003PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/1/2003 at 7:08:54 AM. posted c/n on front window. 9/30/2003 10:32:50 PM
BLD-Wall cover7/24/20037/25/20037/25/2003APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/24/2003 at 1:23:24 PM.
BLD-Energy code compliance7/25/20037/25/20037/25/2003APASS
DetailsDave Hannah
BLD-Wall cover7/22/20037/23/20037/23/2003AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/22/2003 at 1:34:45 PM. needs shear walls in garage installed 7/23/2003 9:47:12 AM
BLD-Framing/Rough-in7/16/20037/16/20037/16/2003PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/16/2003 at 8:51:48 AM.
BLD-Other6/26/20036/27/20036/27/2003PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/26/2003 at 4:34:45 PM. Contact: ###-####. shear nail ok to cover ext 6/30/2003 8:56:12 AM
BLD-Foundation5/14/20035/14/20035/14/2003PPASS
DetailsDave Hannah
WES- ###-####
BLD-Foundation5/12/20035/13/20035/13/2003PNR
DetailsDave Hannah
sniper; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Footing5/13/20035/13/20035/13/2003PPART
DetailsDave Hannah
work in progress setbacks ok forms at about 50 %
Issue PAID IN FULL permit  5/8/2003 DONE
Inspection Record Card- Bld  4/9/2003  
Telephone call  4/9/2003 DONE
left mess that permit is ready
Plan assigned to (DJO)4/8/20034/8/20034/8/2003 PASS
DetailsDan Overy
4/8/2003 14:15:07 DJO - activity updated through activity BLDA022 from case BLD03-00634.
Plan Reviewer's activity  4/8/2003 PEND
need to resolve cantilevered floor joist requirement before issuance of permit. have left message with dan foutz.
Plan Reviewer's activity  4/8/2003 DONE
have red-lined plans to indicate discreptions.
Case Summary (BLD)  4/8/2003 DONE
Plan Review Report  4/8/2003 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/8/2003  
Plans ACCEPTED BY PLAN CHECK  4/8/2003  
Routing - PLANNING3/26/2003 3/27/2003 PASS
Routing - PUBLIC WORKS3/27/2003 3/27/2003 PASS
Application received  3/26/2003  
Pending Assignment by DJO3/26/2003    
DetailsDan Overy
Routing - PLAN CHECK3/27/2003