Case Summary (BLD) | | | 3/11/2014 | | DONE |
|
|
|
|
BLD-Final | 12/22/2003 | 12/23/2003 | 12/23/2003 | A | PASS |
Russ Owen
|
|
|
ok perm. 12/23/2003 1:09:33 PM
|
Letter of compliance | | | 12/23/2003 | | DONE |
|
|
|
Letter of Compliaince # 24378 issued 12-23-03.
|
FIRE-Final Inspection | 12/19/2003 | 12/22/2003 | 12/22/2003 | P | PASS |
Rick Jackson
|
|
|
Nick; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Final | 12/19/2003 | 12/22/2003 | 12/22/2003 | P | CANC |
Dave Hannah
|
|
|
Nick; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes out of time reschedule for tomorrow am 12/22/2003 4:51:38 PM
|
FIRE-Final Inspection | 12/19/2003 | 12/19/2003 | 12/19/2003 | P | FAIL |
Rick Jackson
|
|
|
need door hardware; complete fire alarms 12/19/2003 4:59:26 PM
|
Code Occupancy Approval | 12/18/2003 | 12/18/2003 | 12/18/2003 | A | PASS |
Wm. Michael Meloy
|
|
|
Compliance met. 12/18/2003 11:11:41 AM
|
PubWorks Occupancy Approval | 12/18/2003 | 12/18/2003 | 12/18/2003 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 12/18/03. D.Erskine
|
BLD-Framing/Rough-in | 12/15/2003 | 12/15/2003 | 12/15/2003 | P | PART |
Dave Hannah
|
|
|
Nick -- shaft wall in the elevator; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes pass 12/15/2003 5:02:57 PM
|
BLD-Framing/Rough-in | 12/12/2003 | 12/12/2003 | 12/12/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/12/2003 at 8:33:51 AM. Contact: ###-####. ceiling in south stair tower 12/12/2003 2:19:24 PM
|
BLD-Framing/Rough-in | 12/11/2003 | 12/11/2003 | 12/11/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/11/2003 at 8:58:54 AM. Contact: ###-####. one hr wall east stair tower ok to cover 12/11/2003 2:09:36 PM
|
BLD-Framing/Rough-in | 12/9/2003 | 12/9/2003 | 12/9/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/9/2003 at 8:36:09 AM. Contact: ###-####. ceiling grid in lobbys ok to drop in panels 12/9/2003 2:44:48 PM
|
BLD-Framing/Rough-in | 10/16/2003 | 10/17/2003 | 10/17/2003 | A | PART |
Dave Hannah
|
|
|
nick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 10/17/2003 | 10/17/2003 | 10/17/2003 | P | PART |
Dave Hannah
|
|
|
nick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie steel studs ok to cover ext 10/17/2003 12:07:46 PM
|
BLD-Framing/Rough-in | 9/15/2003 | 9/15/2003 | 9/15/2003 | P | PART |
Dave Hannah
|
|
|
nick; Phone #: ###-#### Internet Inspection Request from: Annette Moore red iron bolting mti doing specal inspection on welding and bolting along with all concrete work 9/15/2003 2:23:04 PM
|
BLD-Footing | 7/25/2003 | 7/28/2003 | 7/28/2003 | A | PART |
Dave Hannah
|
|
|
nick ###-#### mti on site test concrete and did rebar inspection 7/28/2003 11:19:29 AM
|
Override - Parcel Holds | | | 7/25/2003 | | |
|
|
|
|
BLD-Footing | 7/24/2003 | 7/24/2003 | 7/24/2003 | P | DONE |
Steven Webb
|
|
|
rebar//early afternoon please//###-#### nick 4 columns and appr. 20' of wall-by special inspection. 7/24/2003 3:33:22 PM
|
Override - Parcel Holds | | | 7/24/2003 | | |
|
|
|
|
BLD-Foundation | 7/21/2003 | 7/22/2003 | 7/22/2003 | A | PART |
Carl Dependahl
|
|
|
###-####...steel in place ok, N,E, & South side walls; MTI onsite testing...ok pend reports... High slump, low air at 1st batch today... 7/22/2003 11:03:42 AM
|
Override - Parcel Holds | | | 7/21/2003 | | |
|
|
|
|
BLD-Footing | 7/15/2003 | 7/16/2003 | 7/16/2003 | A | PART |
Dave Hannah
|
|
|
###-#### nick mti on site to do spec inspection and test concrete 7/16/2003 10:01:19 AM
|
Override - Parcel Holds | | | 7/15/2003 | | |
|
|
|
|
(F) Reprint permit | | | 6/16/2003 | | |
|
|
|
|
Override - Parcel Holds | | | 6/13/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/13/2003 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 6/12/2003 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/12/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/12/2003 | | DONE |
|
|
|
|
Telephone call | | | 6/12/2003 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Routing - FIRE | 6/2/2003 | | 6/10/2003 | | PASS |
|
|
|
resubmittal acceptable.
|
Routing - PLAN CHECK | 6/10/2003 | | 6/10/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/10/2003 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/27/2003 | | 6/10/2003 | | PASS |
|
|
|
Contacted PDQ to take resubmitted plans of 5/27/03 to outside engineering. kmm Received phone call from consulting structural engineer verifying that he had approved the resubmitted structural revisions, letter to follow. JCM
|
Plan assigned to (JCM) | 3/27/2003 | | 6/10/2003 | | PASS |
John Menard
|
|
|
Energy Review - 6/10/2003 15:49:22 JCM - activity updated through activity BLDA022 from case BLD03-00653.
|
Routing - PLANNING Land Div | 6/2/2003 | | 6/2/2003 | | PASS |
|
|
|
Approved. Deed recorded describing one parcel and new tax parcel number.
|
Routing - PLAN CHECK | 6/2/2003 | | 6/2/2003 | | PASS |
|
|
|
Re-route to John before re-routing to fire. kmm
|
Routing - PUBLIC WORKS | 5/19/2003 | | 6/2/2003 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 6/2/2003 | | PASS |
|
|
|
Inserted remaining resubmitted plan sheets and approved plan review. JCM
|
Plan resubmittals received | | | 5/27/2003 | | DONE |
|
|
|
Received two copies of revised sheets S1.0, S1.1, S1.2, S1.3, S2.1, S3.1, S3.2, S3.3 and two copies of revised struct. calcs and cover letter. Routed one copy to John M and one to outside engingeering. Contacted Wes Edwards for a third set. kmm
Received two copies of revised sheets C4.0 and one copy of cover letter, and one copy of United Water letter. Routed to John M. kmm
|
Plan resubmittals received | | | 5/27/2003 | | DONE |
|
|
|
Received two copies of revised sheets S1.0, S1.1, S1.2, S1.3, S2.1, S3.1, S3.2, S3.3 and taken to John
|
Plan resubmittals received | | | 5/19/2003 | | DONE |
|
|
|
received by fax 11 pages of Cooling load calculations for shell & core from Charles Paulin
|
Routing - PLAN CHECK | 5/16/2003 | | 5/19/2003 | | |
|
|
|
|
Plan resubmittals requested | | | 5/19/2003 | | |
|
|
|
Faxed the architect a request for a copy of the energy load calculations. JCM
|
Routing - FIRE | 5/5/2003 | | 5/16/2003 | | FAIL |
|
|
|
REveiw comments faxed to architect. 5/21/emailed comments to architect.
|
Plan resubmittals received | | | 5/9/2003 | | DONE |
|
|
|
Received revised sheets C3.0, C4.0, C5.0, C6.0, C7.0, A0.2, A1.0, A1.1, A1.2, A2.2, A2.4, A6.0, A8.0, E1.0, S1.1, E2.0D, E2.0, E2.1L, E2.2L, E3.0, . Routed to John M. kmm
|
Plan resubmittals requested | | | 5/5/2003 | | |
|
|
|
E-mailed the architect a copy of the plan review comment list and cover letter requesting revisions. JCM
|
Routing - PLAN CHECK | 4/25/2003 | | 5/5/2003 | | |
|
|
|
|
Routing - PLUMBING | 4/23/2003 | | 4/24/2003 | | PASS |
Lee Rice
|
|
|
Just came back from Scott S. on 4/23/03. Routed to plumb. kmm
|
Plan resubmittals requested | | | 4/15/2003 | | |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 3/28/2003 | | 4/14/2003 | | FAIL |
|
|
|
Called pdq for outside engineering. dkl
4/14/2003-received review comments (fail) and forwarded to John M.
|
Routing - PLANNING | 4/10/2003 | | 4/11/2003 | | DONE |
|
|
|
Pending sign-off by responsible Planning Staff for variance, and pending for resubmittal of a landscape plan that complies with DRH02-00017 condition of approval #1e (City Forestry).
OK per variance CVA01-1. SRS
|
Routing - Erosion and Sediment | 4/9/2003 | | 4/10/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 3/28/2003 | | 4/9/2003 | | FAIL |
|
|
|
Building is in the Cottonwood Creek Floodplain (Zone A O, depth=1', velocity=2'/sec). compliance w/boise City Floodplain ordinance is required. Bld FF needs to be elevated to the base flood level or higher. an elevation certificate will be required before a building permit is issued. Per Jim Wylie.
Requires Drainage Plan. Per Brian Murphy.
|
Routing - PLANNING Land Div | 3/27/2003 | | 3/28/2003 | | FAIL |
|
|
|
Need copy of recorded deed describing parcel and new tax parcel #. Called Wes Edwards of ZGA Architects on March 28, 2003 and left voice mail. DAA 3/28/03
|
Plans ACCEPTED BY PLAN TECH | | | 3/27/2003 | | DONE |
|
|
|
|
Application received | | | 3/27/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/27/2003 | | DONE |
|
|
|
|
Fee Review-notes | 3/27/2003 | 3/27/2003 | | | |
|
|
|
|