BLD-Aging Inspection | 5/13/2005 | 5/13/2005 | 5/13/2005 | | CANC |
Tom Arcoraci
|
|
|
|
DOC - Permit Expired | 5/13/2005 | 5/13/2005 | 5/13/2005 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 6/1/2004 | 6/1/2004 | 6/1/2004 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/1/2004 at 6:57:18 AM. ceilling ok 6/1/2004 8:42:37 AM
|
BLD-Framing/Rough-in | 4/16/2004 | 4/16/2004 | 4/16/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/16/2004 at 5:35:07 AM. 4/16/2004 10:48:40 AM
|
BLD-Framing/Rough-in | 3/4/2004 | 3/4/2004 | 3/4/2004 | P | PART |
Russ Owen
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Barbara Moore I have a detail for a new door opening and clairification for above exterior wall. Ok still working on other items etc. contractor Todd on site. 3/3/2004 9:31:01 PM
|
BLD-Energy code compliance | 3/1/2004 | 3/1/2004 | 3/1/2004 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 3/1/2004 at 7:44:18 AM. Ok to drywall restroom, still working on other areas. 3/1/2004 6:13:08 PM
|
BLD-Framing/Rough-in | 2/17/2004 | 2/17/2004 | 2/17/2004 | P | NR |
Russ Owen
|
|
|
todd; Phone #: ###-#### or ###-#### Internet Inspection Request from: Barbara Moore. needs plumbing and mec approved in restroom. 2/17/2004 12:39:10 AM
|
BLD-Conference | 2/5/2004 | 2/6/2004 | 2/6/2004 | A | PART |
Russ Owen
|
|
|
Meet Geroge and contractor to go over plans, and disscused scope of work ,I belive contractor/etc all understand what needs to be done to get project up and forward as this work was started w-oout a permit approx a year ago. 2/6/2004 4:34:24 PM
|
BLD-Conference | 2/5/2004 | 2/5/2004 | 2/5/2004 | P | DONE |
Russ Owen
|
|
|
Called Joe contractor, talk about the work and latter called the electrical inspector and found out he had been there under a permit addressed at 2100 cole, Then I found a mec permit ,mec 03-00228 also addressed at this 2100 cole,I checked history of this permit and they were issued a stop work order for not having a building permit. 2/5/2004 3:47:20 PM
|
BLD-Other | 1/26/2004 | 1/26/2004 | 1/26/2004 | P | DONE |
Russ Owen
|
|
|
I stoped by job to check status but no one was here. 1/26/2004 3:44:00 PMI stoped by job to check status but no one was here. 1/26/2004 3:44:08 PM
|
BLD-Other | 1/26/2004 | 1/26/2004 | 1/26/2004 | P | DONE |
Russ Owen
|
|
|
I stoped by job to check status but no one was here. 1/26/2004 3:44:00 PMI stoped by job to check status but no one was here. 1/26/2004 3:44:14 PM
|
BLD-Conference | 1/20/2004 | 1/21/2004 | 1/21/2004 | A | FAIL |
Russ Owen
|
|
|
###-#### joe fields > Walls and raised floors were constructed before a permit was obtained, contractor has questions on ceilings and exterior wall and ramps along with other items I sujested he talk with the architect, as he seemed unaware of work that needed to be performed. No inspection done and no approval granted to cover anymore, note there is now drywall on walls and no tape at this time. "Note". On the plans it references existing walls, the wording of the permit should have stated, work started prior to permit being issued. 1/21/2004 10:19:19 AM
|
(F) Reprint permit | | | 1/20/2004 | | DONE |
|
|
|
|
BLD-Aging Inspection | 11/3/2003 | 11/3/2003 | 11/3/2003 | | CANC |
Russ Owen
|
|
|
|
Override - Parcel Holds | | | 8/4/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/4/2003 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 7/28/2003 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/28/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/28/2003 | | |
|
|
|
|
Telephone call | | | 7/28/2003 | | DONE |
|
|
|
permit ready and fees due
|
Plan resubmittals received | | | 7/25/2003 | | DONE |
|
|
|
two copies of A-2,AO.1 taken to Dan S.
|
Telephone call | | | 7/25/2003 | | DONE |
|
|
|
Call to Bob Hess to review seismic design data provide and the suspended ceiling installation requirements. Bob is sending be new sheets A0.1 & A-2 for clarificiation & details.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2003 | | PASS |
|
|
|
To permit desk for issue.
|
Plan assigned to (DRS) | 4/4/2003 | | 7/25/2003 | | PASS |
Dan Stuart
|
|
|
7/25/2003 13:42:09 DRS - activity updated through activity BLDA022 from case BLD03-00680.
|
Routing - PLAN CHECK | 6/2/2003 | | 7/25/2003 | | PASS |
|
|
|
Approved as noted on and attached plan review comments & conditions of all reviewing agencies.
|
Plan resubmittals received | | | 7/23/2003 | | DONE |
|
|
|
Transmittal letter, ES report, Aerial photo, Seismic data, HVAC load calcs, plan review fax transmittal, two sets of AO.1,A-1,A-2,A2.1,A-3, MH-1,MH-2, taken to Dan S.
|
Routing - FIRE | 5/20/2003 | | 5/30/2003 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 5/19/2003 | | FAIL |
|
|
|
Plan review report of needed clarifications & corrections forwarded to architect by mail & fax.Routing plans to fire code analyst.
|
Routing - PLAN CHECK | 4/15/2003 | | 5/19/2003 | | FAIL |
|
|
|
Copy of plan resubmittal clarifications required faxed and mailed to architect. Forwarding plans to fire code analyst for review.
|
Routing - PUBLIC WORKS | 4/4/2003 | | 4/15/2003 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/1/2003 | | DONE |
|
|
|
|
Application received | | | 3/31/2003 | | |
|
|
|
|