Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD03-00682
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMicron Building #16
Customer NumberPCS5446
ePlanReviewNo
Description
Micron Building #16 - F3 Bldg. 16 CFA addition (Phase 1) * This permit is for the structural approval of a 6'x28'x7' deep concrete facilities tunnel and a 7'x11'x41' tall steel structural for support of a future mechanical duct enclosure. This steel structure is supported by a portion of the new concrete facilities tunnel. This structure will be attached to a portion of the north end of Building #16. This permit is for the structural review and approval only. The finish and mechanical work to be done under a separate submittal. JCM/PC#166-03
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/20/200311/21/200311/21/2003PPASS
DetailsJim Storey
Steve; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes l/c isued on site. 11/21/2003 1:56:56 PM
DOC - Permit Finaled11/21/200311/21/200311/21/2003PPASS
DetailsJim Storey
Finaled by inspector at 11/21/2003 1:56:58 PM
BLD-Aging Inspection9/22/20039/22/20039/22/2003 NR
DetailsJim Storey
wip. 9/22/2003 8:34:39 AM
BLD-Aging Inspection7/21/20037/21/20037/21/2003 PASS
DetailsJim Storey
waiting for coridor wall protection at trench line. wip 7/21/2003 8:30:38 AM
BLD-Footing5/15/20035/19/20035/19/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/15/2003 at 1:04:45 PM. Contact: ###-####. red iron in place appears to be per plan pending special insp reports. 5/19/2003 8:58:57 AM
BLD-Footing5/16/20035/19/20035/19/2003APART
DetailsJim Storey
BLD-Footing5/15/20035/16/20035/16/2003ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/15/2003 at 1:04:03 PM. Contact: ###-####. out of time. 5/16/2003 4:55:15 PM
BLD-Footing5/8/20035/9/20035/9/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/8/2003 at 4:34:05 PM. Contact: ###-####.
BLD-Footing5/1/20035/6/20035/6/2003PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/1/2003 at 11:54:01 AM. Contact: ###-####.
BLD-Footing5/1/20035/5/20035/5/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/1/2003 at 11:53:11 AM. Contact: ###-####. wip covered with special insp. 5/5/2003 8:32:21 AM
BLD-Footing5/1/20035/2/20035/2/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/1/2003 at 11:52:22 AM. Contact: ###-####.wall ok. 5/2/2003 9:46:40 AM
PLANS/APPL TAKEN TO FRONT DESK  4/29/2003 PASS
Telephone call  4/29/2003 DONE
emailed permit ready
Inspection Record Card- Bld  4/29/2003 DONE
Issue & PRINT to be Invoiced  4/29/2003 DONE
Plan assigned to (JCM)4/2/2003 4/29/2003 PASS
DetailsJohn Menard
4/29/2003 14:18:04 JCM - activity updated through activity BLDA022 from case BLD03-00682.
Routing - PLAN CHECK4/7/2003 4/29/2003 PASS
Routing Off Site - STRUCTURAL4/21/2003 4/29/2003 PASS
Sent resubmittal to outside engineer. Spoke with consulting engineer and was advised that the resubmittals had been approved as submitted and a letter would follow. JCM
Additional plans submitted  4/25/2003 DONE
Letter of transmittal received three sets of L2.0.1, A2.2.1,A2.3.1, A5.0, M4.3.1 and taken to John M.
Plan resubmittals received  4/18/2003 DONE
3 sets of resubmittal sheets S3.0 along with cover letter received and forwarded to John M.
Plan resubmittals requested  4/16/2003  
Faxed Paul Marcolina a copy of the review comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL4/2/2003 4/16/2003 FAIL
contacted pdq for outside engineering. kmm Received a comment list from the consulting structural engineer requesting revisions. JCM
Plan Reviewer's activity  4/11/2003 PASS
Plans approved as submitted for the structural frame phase of this project. JCM
Plans ACCEPTED BY PLAN TECH  4/8/2003 DONE
Waiver letter received routed one copy to John M one to Jim R and one in file. kmm
Routing - PLANNING4/7/2003 4/7/2003 PASS
Approve per CZC03-36
Routing - Erosion and Sediment4/4/2003 4/4/2003 PASS
Per Jim Rogers no charge for ESC waiver letter. Micron work is under a General NPDES permit issued by EPA. All work on site must have BMP's as required by the General NPDES permit and Boise City attached to plans. An ESC permit is required by Boise City.
Routing - PUBLIC WORKS4/2/2003 4/4/2003 PASS
Plans ACCEPTED BY PLAN TECH  4/2/2003 DONE
Waiting for waiver letter.
No outside energy review. kmm
Routing - PLANNING Land Div4/2/2003 4/2/2003 PASS
Approved, site is over 5 acres in size.
Plan routing begun/NEW & ADDTN  4/2/2003 DONE
Application received  4/1/2003  
Fee Review-notes4/1/20034/1/2003   
additional value from elect. permit so gave an additional 202,757.00 value