Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-00689
StatusFinaled
Name CORNEL LARSON
Site Address 2201 E PARKCENTER BLVD
Project NameGold's Gym @ Parkcenter
Customer Number 
ePlanReviewNo
Description
Gold'sGym at Parkcenter (Shell Building) - To construct a new 46,435 square foot, two story shell building and related site improvements for a future Gold's gym and exercise facility. (First Floor 31,790 sq. ft. Second Floor 14,645 sq. ft.). This building is constructed of concrete tilt-up exterior walls and glazed curtain walls with steel joists and metal pan and concrete floors and metal roof deck. This building is fully fire sprinklered. The sprinklers are used for area increase. This is a shell permit only. No occupancy is allowed under this permit. A separate tenant improvement permit is required to finish this building for occupancy. All construction per the approved plans and attached comment list. DRH03-00005/CUP02-00154/03-170/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/6/2013 DONE
Letter of compliance  5/10/2004 DONE
Letter of Compliance issued 5-10-04.
BLD-Final4/30/20045/3/20045/3/2004APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/30/2004 at 3:47:30 PM. Contact: ###-####. final ok. 5/3/2004 1:20:01 PM
BLD-Final4/29/20044/30/20044/30/2004ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/29/2004 at 1:32:23 PM. Contact: ###-####. pending plm sign off of drinking fountian permit. 4/30/2004 8:03:52 AM
BLD-Final4/21/20044/21/20044/21/2004PNR
DetailsJim Storey
Tony; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
FIRE-Final Inspection4/2/20044/2/20044/2/2004PPASS
DetailsRick Jackson
BLD-Final3/5/20043/8/20043/8/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/5/2004 at 7:14:13 AM. Contact: ###-####. pending letter from engineer for special insp defenciecs noted on si final afadavid. 3/9/2004 10:36:08 AM
FIRE-Final Inspection3/5/20043/5/20043/8/2004PPART
DetailsRick Jackson
tony; Phone #: ###-#### Internet Inspection Request from: Darla Downs Phase I okay to occupy per Dave Miller; will need alarms/sprinklers completed for final of Phase II under the shell permit 3/8/2004 9:55:15 AM
BLD-Final3/5/20043/5/20043/5/2004PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/5/2004 at 7:14:13 AM. Contact: ###-####.
Code Occupancy Approval3/5/20043/4/20043/4/2004APASS
DetailsScott M.Brown
ALL IN AS REQUIRED, FINAL SIGNED OFF 3/5/2004 10:09:36 AM
FIRE-Conference2/20/20042/23/20042/23/2004APART
DetailsRick Jackson
met with GC and other inspectors about requirements for temp occupancy as the SE area of the TI work won't be ready for the final occupancy; sprinklers/alarms must be complete for final and other life safety items 2/23/2004 10:37:45 AM
BLD-Aging Inspection1/15/20041/15/20041/15/2004 PASS
DetailsJim Storey
wip 1/15/2004 8:19:52 AM
BLD-Framing/Rough-in10/30/200310/31/200310/31/2003APART
DetailsJim Storey
Tony; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes roof framing of skylights and equment cover ok. 10/31/2003 9:37:23 AM
BLD-Framing/Rough-in10/24/200310/27/200310/27/2003APART
DetailsJim Storey
Tony//roof canopy.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes pending all rfi changes from engineer of record/and special insp. 10/27/2003 2:20:12 PM
BLD-Framing/Rough-in10/24/200310/24/200310/24/2003PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/24/2003 at 7:28:01 AM. Contact: ###-####. out of time rolled over to monday am. 10/24/2003 4:16:57 PM
BLD-Aging Inspection10/1/200310/1/200310/1/2003 PASS
DetailsJim Storey
wip no call for insp. 10/1/2003 8:07:35 AM
BLD-Foundation7/30/20037/31/20037/31/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/30/2003 at 1:23:21 PM. Contact: ###-####. pannels placed with special insp. need to have s/i log up dated in job office. 7/31/2003 10:14:18 AM
BLD-Footing7/18/20037/21/20037/21/2003PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/18/2003 at 1:54:04 PM. Contact: ###-####.
(F) Reprint permit  7/2/2003  
Issue PAID IN FULL permit  7/1/2003 DONE
Inspection Record Card- Bld  6/18/2003  
Print Occupancy Form  6/18/2003 DONE
Inspection Record Card- Bld  6/18/2003 DONE
Telephone call  6/18/2003 DONE
TALKED TO CORNEL TO VERIFY PLANS ARE READY & NEED ACHD
Routing - PLAN CHECK6/13/2003 6/16/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/16/2003 PASS
Plan assigned to (JCM)4/4/2003 6/16/2003 PASS
DetailsJohn Menard
6/16/2003 09:28:39 JCM - activity updated through activity BLDA022 from case BLD03-00689.
Routing - PUBLIC WORKS6/10/2003 6/13/2003 PASS
Routing - PLAN CHECK6/3/2003 6/10/2003  
Routing - PLAN CHECK6/2/2003 6/3/2003  
Plan resubmittals received  6/3/2003 DONE
Received Land Records Parcel Activity Form. Routed one copy to Dave Abo and one to John M. kmm
Routing - PLANNING Land Div6/3/2003 6/3/2003 PASS
ROS #6134. Notice of Buildable Parcel recorded, deed recorded and new tax parcel # provided.
Routing - FIRE5/19/2003 5/30/2003 PASS
Resubmittal acceptable.
Plan resubmittals received  5/21/2003 DONE
letter of transmittal, one set of S-5,S-6, S-7, S-10 and taken John M.
Routing - PLAN CHECK5/14/2003 5/19/2003 PASS
Plan Reviewer's activity  5/19/2003 PASS
Reviewed and approved revisions as submitted. JCM
Plan resubmittals requested  5/19/2003  
Called the architect to request a third copy of the structural resubmittals. JCM
Routing - PUBLIC WORKS5/9/2003 5/13/2003 FAIL
Bill Colson requires street light plan
Routing - PLAN CHECK4/24/2003 5/9/2003  
Routing Off Site - STRUCTURAL5/1/2003 5/2/2003 PASS
Contacted PDQ to take resubs of 4/30/03 to outside engineering. kmm Received a fax from the consulting structural engineer indicating that all comments had been adequately addressed. JCM
Plan resubmittals received  5/1/2003 DONE
received two response letters to structural from Pinnacle Engineers, letter to John from Larson Architects, and two sets of A-2, A-8, A-12, A-15, two sets of E0, E3.1, E3.2, E5.1, E6.1, E7.1, two sets of S-0, S-5, S-6, S-7, S-10 and taken to john
Plan Review Completed(1st rev)  4/24/2003 DONE
DetailsBill Alexander
Routing - FIRE4/18/2003 4/24/2003 FAIL
DetailsBill Alexander
Requires grading issues cleared prior to construction of shell. Reference review notes (faxed to Larson Architects).
Plan resubmittals requested  4/23/2003  
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL4/4/2003 4/22/2003 FAIL
Contacted PDQ for outside engineering. kmm Received comment list from consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  4/18/2003  
Mailed the architect a copy of the plan review comment list requesting revisions. JCM
Routing - PLAN CHECK4/15/2003 4/18/2003 FAIL
Routing - PLUMBING4/11/2003 4/15/2003 PASS
Routing - PLANNING4/9/2003 4/11/2003 PASS
Approved per conditions of approval of CUP02-154; pending Design Review approval.
Routing - Erosion and Sediment4/8/2003 4/9/2003 PASS
ESC approved with conditions attached to plans. ESC previously approved under bld03-00715 & esc03-00401
Routing - PUBLIC WORKS4/4/2003 4/8/2003 FAIL
Site plan doesn't comply with recorded plat and/or legal description. Per April Miller.
Requires drainage plan revisions. Per Brian Murphy.
Routing - PLANNING Land Div4/4/2003 4/4/2003 FAIL
Do not issue building permit for building until Record of Survey process is completed. See Parcel Tag.
Plans ACCEPTED BY PLAN TECH  4/4/2003 DONE
Plan routing begun/NEW & ADDTN  4/4/2003  
Application received  4/1/2003  
Recd Pcfee & Taken To Pln CK  4/1/2003  
Fee Review-notes4/1/20034/1/2003