(VISTA AUTO SALES) Remodel to a 528 sq. ft. building with a 528 sq. ft. basement changing occupancy from a residence to a commercial office building per approved plans on file. Work to include demolishing attached lean to addition and exterior basement stairway, enlarging existing opening in basement wall for new exit door, new exterior stairway from basement with handrails and guard, infilling two openings in basement wall, providing one-hour ceiling in basement, strengthening floor framing to meet minimum loading, upgrading restroom to current accessibility standards, new 3' wide interior doors, providing accessible hardware on all doors, new exterior windows and doors, relocated exterior deck with new accessible ramp, interior finish, adding additional insulation in attic space, exterior site/parking modifications per DRH02-00254, mechanical work, plumbing work, and electrical work. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is NOT fire sprinklered. (PC#0174-03) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 8/4/20044/26/2005 DONE
PubWorks Occupancy Approval1/14/20051/14/20051/14/2005 DONE
Finaled without PW approval. No final inspection, drive-by shows complete 1/14/05. R.Rokovitz
Permanent occupancy  8/3/2004 DONE
Perm. Occ. Cert. # 10250 issued 8-3-04 to Vista Auto Sales.
Permanent Occupancy 7/28/20047/28/2004 DONE
Details
BLD-Aging Inspection7/28/20047/28/20047/28/2004 PASS
DetailsJim Storey
final ok 7/28/2004 8:34:09 AM
Print Occupancy Form  7/28/2004 DONE
Code Occupancy Approval5/26/20045/26/20045/26/2004PPASS
DetailsWm. Michael Meloy
Compliance met. 5/26/2004 4:32:08 PM
BLD-Aging Inspection5/17/20045/17/20045/17/2004 NR
DetailsJim Storey
trans to mike w p&z 5/17/2004 8:54:07 AM
BLD-Aging Inspection3/16/20043/16/20043/16/2004 PART
DetailsJim Storey
pending p&z 3/16/2004 8:36:07 AM
BLD-Aging Inspection1/15/20041/15/20041/15/2004 DONE
DetailsJim Storey
pending p&z/achd per last entry. 1/15/2004 8:23:30 AM
Code Occupancy Approval10/9/200310/9/200310/9/2003PFAIL
DetailsWm. Michael Meloy
Larry Christensen, ###-#### called for a final . Inspection found that a substantial amount of the landscaping had not been completed. Trees & scrubs missing from eastside of parking lot, s/e corner, south side and the n/w front of the office.

Additionally, the stripping in the parking lot was not visible, nor was the designation for customer parking. 10/9/2003 3:19:23 PM 10/9/2003 3:21:39 PM
BLD-Final8/15/20038/18/20038/18/2003ADONE
DetailsJim Storey
###-#### larry ###-#### larry pending bond release and achd sign off. 8/18/2003 10:29:24 AM
FIRE-Final Inspection8/15/20038/15/20038/15/2003PPASS
DetailsRick Jackson
###-#### larry
Code Occupancy Approval  8/15/2003 FAIL
Landscaping and stripping not completed. OK to bond for $800.
Inspection Record Card- Bld  8/15/2003 DONE
Print Occupancy Form  8/15/2003 DONE
BLD-Final8/13/20038/14/20038/14/2003ANR
DetailsJim Storey
larry; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in6/25/20036/26/20036/26/2003PPASS
DetailsJim Storey
chris; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Footing6/10/20036/10/20036/10/2003PPASS
DetailsJim Storey
jay ; Phone #: ###-#### Internet Inspection Request from: Annette Moore ft 6/10/2003 3:08:24 PM
Issue PAID IN FULL permit  6/6/2003 DONE
Inspection Record Card- Bld  6/6/2003 DONE
Print Occupancy Form  6/6/2003  
Telephone call  6/6/2003 DONE
LEFT MESS THAT PERMIT IS READY
Routing - PLAN CHECK6/5/2003 6/5/2003 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  6/5/2003 PASS
Plan assigned to (JCB)4/8/2003 6/5/2003 PASS
DetailsJason Blais
6/5/2003 10:19:58 JCB - activity updated through activity BLDA022 from case BLD03-00713.
Routing - FIRE6/4/2003 6/4/2003 PASS
DetailsBill Alexander
Routing - PUBLIC WORKS5/30/2003 6/4/2003 PASS
Plan resubmittals received  6/3/2003 DONE
two copies of A-1 and taken to Jason B.
Routing - PLAN CHECK5/28/2003 5/30/2003 FAIL
Sent fax to architect on remaining issues to be addressed. One building dept. issue concerning relocated deck, fire dept. issues, and public works issues. When resubmittals received will review and route to fire dept. and public works for approval. Plans to route to Public Works again.
Telephone call  5/30/2003  
Called architect Jerrie Wolfe concerning remaining items still needing to be addressed. He acknowledged and will resolve the issues.
Routing - PLANNING5/28/2003 5/28/2003 PASS
Approved per DRH02-254.
Routing - PUBLIC WORKS5/16/2003 5/28/2003 FAIL
Requires O&M plan, geotech report and drainage plan. All per Brian M. kmm
Routing - FIRE5/6/2003 5/16/2003 FAIL
DetailsBill Alexander
Need hydrant location and flows, plus verification of IBC corrections are provided.
Plan Review Completed(1st rev)  5/16/2003 DONE
Plan resubmittals received  5/9/2003 DONE
three copies of A-1.1, two copies of A-2 two copies of A-3 revised cert. of value and taken to Jason B.
Plan resubmittals received  5/8/2003 DONE
received four copies of C-1.0, L-1.0 and taken to Jason
Plan resubmittals requested  5/6/2003  
Plan resubmittals and written response required for further review.
Routing - PLAN CHECK4/15/2003 5/6/2003 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and written response required for further review. Plans routed to Fire Dept.
Plan resubmittals received  5/6/2003 DONE
Received three copies of revised sheets C-1.0. routed to Jason B. kmm
Plan resubmittals received  4/28/2003 DONE
received two copies of A-2 for Sarah and put with the plans in Jasons cubbie.
Routing - PLANNING4/11/2003 4/14/2003 FAIL
Plans have changed since Design Review. Also non-compliance with previous DR approval in regards to parking, drive aisles, cross access agreements,no elevations for the deck and no new plans submitted to DR. Applicant has been called and letter written for notification.
Routing - Erosion and Sediment4/10/2003 4/11/2003 PASS
ESC waiver request approved with conditions attached to plans.
Routing - PUBLIC WORKS4/9/2003 4/10/2003 FAIL
This project is within a defined historical lighting district. Ornamental style street lighting is required along the street frontage. Vista ave street lighting plans must be submitted for approval by this Public Works Street lighting department. Per Bill Colson O&M plan and geotec report required. Per Brian M. kmm
Routing - PLANNING Land Div4/8/2003 4/9/2003 PASS
Approved. Building existing over lot lines prior to Subdivision Ordinance.
Plans ACCEPTED BY PLAN TECH  4/4/2003 DONE
Application received  4/3/2003  
Recd Pcfee & Taken To Pln CK  4/3/2003 DONE
Fee Review-notes6/6/20036/6/2003   
Fee Review-notes4/3/20034/3/2003