Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-00742
StatusFinaled
Name H.W. INVESTMENTS LLC
Site Address 100 W MAIN ST
Project NameHW Investments
Customer Number 
ePlanReviewNo
Description
(HW INVESTMENTS LLC) This building is NOT fire sprinklered. To convert an existing 3,220 square foot house to an office building. This building has a 1,660 square foot first floor and a 1,560 square foot second floor. The basement (270 square feet) is approved as a mechanical equipment room only. Storage is NOT allowed in the basement. The 1994 Uniform Code for Building Conservation (UCBC) shall be used to regulate this conversion. Work is to include a new exterior ramp accessible to the disabled, interior nonbearing walls, a restroom accessible to the disabled, and an accessible route throughout the first floor all per approved drawings and plan review report on file. DRH03-00019 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  3/13/2007  
First Notice 7/2/20037/2/2003 DONE
Permanent occupancy UNPAID FEE  7/2/2003 DONE
Perm. Occ. Cert. #9710 issued 7-2-03 to H.W. Investments, LLC.
BLD-Final6/30/20037/1/20037/1/2003APASS
DetailsCarl Dependahl
TEMP OCC -DON; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...ok for c/o 7/1/2003 1:29:52 PM
Permanent Occupancy 7/1/20037/1/2003 DONE
Details
BLD-Conference6/27/20036/30/20036/30/2003PPASS
DetailsCarl Dependahl
Don; t/o req's... 6/30/2003 1:02:07 PM
BLD-Final6/30/20036/30/20036/30/2003PPART
DetailsCarl Dependahl
###-####; ok for t/o 90 days 6/30/2003 1:02:31 PM
BLD-Conference6/30/20036/30/20036/30/2003APASS
DetailsCarl Dependahl
complete door hdwe
BLD-Final6/26/20036/27/20036/27/2003PNR
DetailsCarl Dependahl
DON; Phone #: ###-#### Internet Inspection Request from: Darla Downs...need plbg. 6/27/2003 6:35:37 PM
PubWorks Occupancy Approval6/25/20036/25/20036/25/2003 DONE
Drainage project complete, signed permanent occupancy 6/25/03. M.Strasser
FIRE-Final Inspection6/23/20036/24/20036/24/2003APASS
DetailsRick Jackson
don; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Code Occupancy Approval6/23/20036/23/20036/23/2003PPASS
DetailsWm. Michael Meloy
Compliance met. 6/23/2003 1:16:49 PM
BLD-Footing6/9/20036/10/20036/10/2003PCANC
DetailsCarl Dependahl
don; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in6/4/20036/5/20036/5/2003PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 6/4/2003 at 1:40:49 PM. Contact: ###-####....ok to cover int walls pend plbg....discussed rails w/ bldr. 6/5/2003 3:03:10 PM
FIRE-Conference6/3/20036/3/20036/3/2003PPART
DetailsRick Jackson
don; Phone #: ###-#### Internet Inspection Request from: Barbara Moore met with Don about door hardware - main exit will be the north exit and south door to be openable from the inside without special knowledge; extinguishers needed on both floors 6/3/2003 3:41:09 PM
Routing - PLAN CHECK5/30/2003 6/2/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/2/2003 PASS
Print Occupancy Form  6/2/2003 DONE
Telephone call  6/2/2003 DONE
permit ready
Issue PAID IN FULL permit  6/2/2003 DONE
Plan assigned to (CJW)4/10/2003 6/2/2003 PASS
DetailsCarl Westfall
6/2/2003 06:50:35 CJW - activity updated through activity BLDA022 from case BLD03-00742.
Routing - PLAN CHECK5/23/2003 5/30/2003 PASS
Forwarded back to Brian Murphy for approval.
Routing - PUBLIC WORKS5/30/2003 5/30/2003 PASS
Brian Murphy approved resubmitted drainage plans and returned to Plan Review.
Routing - PUBLIC WORKS5/22/2003 5/23/2003  
Modified drawings. Sent back to Brial Murphy to review new drainage pattern.
Routing - PLAN CHECK5/19/2003 5/22/2003 PASS
Plan resubmittals received  5/21/2003 DONE
Received three copies of revised sheets C1.0, A1.0, A2.0. One copy of cover letter and one copy of response letter and one copy of stormwater management calculations. Routed to Carl W. kmm
Routing - FIRE5/9/2003 5/19/2003 PASS
Routing - PLAN CHECK4/23/2003 5/9/2003  
Failed first UBC review. UBC plan review started May 9, 2003 and finished the same day. A response from the designer was required. See the plan review report.
Routing - PUBLIC WORKS4/23/2003 4/23/2003 PASS
Went back later because of modified drawings.
Routing - PLAN CHECK4/16/2003 4/23/2003  
Routing - PLANNING4/15/2003 4/16/2003 PASS
Approved per DRH03-19.
Routing - PUBLIC WORKS4/10/2003 4/15/2003  
Failed first review. Requires a drainage plan.
Routing - Erosion and Sediment4/15/2003 4/15/2003 PASS
ESC approved with conditions attached to plans.
Plan resubmittals received  4/11/2003 DONE
Received three copies of revised sheet A2.0. Put with plans. kmm
Routing - PLANNING Land Div4/10/2003 4/10/2003 PASS
Approved by ROS 5285.
Application received  4/9/2003  
Plans ACCEPTED BY PLAN TECH  4/9/2003  
Failed first submittal. Requires
1. Interior elevations
2. Dimensions