Permit Information
Permit NumberBLD03-00746
StatusFinaled
Name ST LUKES MSTI (ACCELERATOR #2)
Site Address 100 E IDAHO ST
Project NameST LUKES-MSTI S TOWER
Customer Number 
ePlanReviewNo
Description
(ST LUKES MSTI-SOUTH TOWER-ACCELERATOR #2) To replace existing accelerator equipment and millwork, floor and wall finishes, and install new vault door and closer per approved plans. PC03-186/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/22/2016 DONE
DOC - Permit Finaled6/30/20046/30/20046/30/2004PPASS
DetailsDave Hannah
Finaled by inspector at 6/30/2004 1:51:26 PM
BLD-Aging Inspection6/29/20046/29/20046/29/2004 PASS
DetailsDave Hannah
BLD-Final12/8/200312/9/200312/9/2003ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/8/2003 at 3:27:29 PM. Contact: ###-####.
BLD-Framing/Rough-in12/8/200312/9/200312/9/2003ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/8/2003 at 3:29:00 PM. Contact: ###-####.
BLD-Final12/3/200312/4/200312/4/2003APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/3/2003 at 10:57:38 AM. Contact: ###-####.
FIRE-Final Inspection12/3/200312/3/200312/3/2003APASS
DetailsRick Jackson
BLD-Final11/24/200311/25/200311/25/2003ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/24/2003 at 9:47:26 AM.
BLD-Final11/25/200311/25/200311/25/2003PFAIL
DetailsDave Hannah
needs fire life safty final 11/25/2003 2:35:41 PM
BLD-Framing/Rough-in9/26/20039/26/20039/26/2003APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/26/2003 at 7:09:13 AM. Contact: ###-####.
BLD-Framing/Rough-in9/24/20039/25/20039/25/2003ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/24/2003 at 3:05:00 PM. Contact: ###-####. out of time rescheduled for pm 9/25/2003 1:40:27 PM
BLD-Framing/Rough-in9/25/20039/25/20039/25/2003PNH
DetailsDave Hannah
BLD-Aging Inspection9/22/20039/22/20039/22/2003 DONE
DetailsDave Hannah
Issue & PRINT to be Invoiced  6/23/2003 DONE
Inspection Record Card- Bld  6/12/2003 DONE
Routing - PLAN CHECK6/5/2003 6/11/2003 PASS
Recceived new sheet resubmittals on 6/10/03 & requested engineering on 6/11/03. Inserted all into original plans for permit processing and attached copy of engineering with architects response data included. Routing to permit desk to issue.
Plan resubmittals received  6/11/2003 DONE
Structural Calculations for SLRMC MSTI accelerator Room #2 and taken to Dan S.
PLANS/APPL TAKEN TO FRONT DESK  6/11/2003 PASS
To permit desk for issuing.
Plan assigned to (DRS)4/10/2003 6/11/2003 PASS
DetailsDan Stuart
Energy review by Dan. Energy compliance comments included on plans and GENERAL NOTE plan review comments for follow-up verification in field by inspectors.
1600 hours to permit desk for issue, 6/11/03.
Plan resubmittals received  6/10/2003 DONE
Received six copies of revised sheet S-1, two copies of revised sheet T-1, two copies of revised sheet A3 & two copies of revisedh sheets M1.0, M1.1 & M2.0. Two copies of cover letter. Routed to Dan S. kmm

Routing - FIRE5/23/2003 6/4/2003 PASS
Plan resubmittals requested  5/23/2003 FAIL
Plans incomplete. No structural sheet or design engineering & calcs for new steel plate to be attached above suspended ceiling to existing floor system. Copy faxed to architect & mailed for his response. Routing to fire code analyst for review.
Routing - PLAN CHECK4/16/2003 5/23/2003 FAIL
Resubmittals & clarification required. Copy of plan review comments needing addressed faxed & mailed to architect.
Routing - PLUMBING4/15/2003 4/16/2003 PASS
Routing - PUBLIC WORKS4/10/2003 4/15/2003 PASS
Plans ACCEPTED BY PLAN TECH  4/10/2003 DONE
plans not dimensioned
Application received  4/9/2003