First Notice | | 7/7/2003 | 7/7/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 7/7/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9712 issued 7-7-03 to Critical Care Systems.
|
FIRE-Final Inspection | 7/1/2003 | 7/1/2003 | 7/1/2003 | P | PASS |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 7/1/2003 at 9:34:26 AM. Contact: ###-####.
|
BLD-Final | 7/1/2003 | 7/1/2003 | 7/1/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/1/2003 at 9:35:57 AM. Contact: ###-####. OK for Perm Occ. :) :) :) 7/1/2003 1:17:15 PM
|
FIRE-Final Inspection | 7/1/2003 | 7/1/2003 | 7/1/2003 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety, fire alarm and fire sprinkler are finaled
|
Permanent Occupancy | | 7/1/2003 | 7/1/2003 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/27/2003 | 6/30/2003 | 6/30/2003 | A | FAIL |
Troy Cobbley
|
|
|
###-#### The map for the facp that was provided did not match what has been installed and did not include device addresses 6/30/2003 11:14:02 AM
|
BLD-Final | 6/27/2003 | 6/30/2003 | 6/30/2003 | P | NR |
Jim Sly
|
|
|
###-####
|
FIRE-Final Inspection | 6/27/2003 | 6/27/2003 | 6/27/2003 | P | FAIL |
Troy Cobbley
|
|
|
Can't final life safety until the fire alarm has been finaled but it is ready to be finaled 6/27/2003 11:33:43 AM
|
BLD-Final | 6/27/2003 | 6/27/2003 | 6/27/2003 | P | FAIL |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Need fire final 6/27/2003 4:25:44 PM
|
BLD-Framing/Rough-in | 6/19/2003 | 6/19/2003 | 6/19/2003 | P | PASS |
Jim Sly
|
|
|
Jim ceiling grid; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
FIRE-Conference | 6/4/2003 | 6/4/2003 | 6/4/2003 | P | DONE |
Troy Cobbley
|
|
|
jim; Phone #: ###-#### I spoke to jim about the door hardware required at all the exits. I noticed a manual pull station in the tenant space and told him the fire alarm system would need to be addressed before a final inspection was passed 6/4/2003 4:04:17 PM
|
BLD-Conference | 6/4/2003 | 6/4/2003 | 6/4/2003 | P | PASS |
Jim Sly
|
|
|
JIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 5/20/2003 | 5/21/2003 | 5/21/2003 | P | PASS |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Annette Moore jim; Phone #: ###-#### Internet Inspection Request from: Annette Moore 5/21/2003 3:31:33 PM Clean room ok. 5/21/2003 3:31:59 PM
|
BLD-Framing/Rough-in | 5/15/2003 | 5/16/2003 | 5/16/2003 | P | PART |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Frame OK except Clean room. 5/16/2003 4:12:17 PM
|
Plan assigned to (R_H) | 4/11/2003 | | 5/15/2003 | | PASS |
|
|
|
5/15/2003 09:38:23 RMH - activity updated through activity BLDA022 from case BLD03-00759.
|
Routing - PLAN CHECK | 5/14/2003 | | 5/15/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/15/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/15/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/15/2003 | | DONE |
|
|
|
|
Telephone call | | | 5/15/2003 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Issue PAID IN FULL permit | | | 5/15/2003 | | DONE |
|
|
|
|
Routing - FIRE | 5/2/2003 | | 5/14/2003 | | PASS |
|
|
|
Copy of review faxed to architect. Delayed submittals required. Per telcon, Mechanical Designer indicates occupancy is formulating/packaging of IV prescriptions, packaging has to be done in Class 1000 clean room; Infusion room is for patient IV procedures.
|
Routing - PLAN CHECK | 4/15/2003 | | 5/2/2003 | | PEND |
|
|
|
No corrections required by building department. Permit pending fire departments review, Routed plans to the fire department on 5/02/03.
|
Routing - PUBLIC WORKS | 4/11/2003 | | 4/15/2003 | | PASS |
|
|
|
|
Application received | | | 4/10/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/10/2003 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/10/2003 | | DONE |
|
|
|
|
Fee Review-notes | 8/20/2003 | 8/20/2003 | | | |
|
|
|
Waiting for final certs
|
Fee Review-notes | 4/10/2003 | 4/10/2003 | | | |
|
|
|
|