Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/26/2004 | 4/26/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 8/26/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10269 issued 8-26-04 to Pepperhills Elementary School.
|
BLD-Final | 8/19/2004 | 8/20/2004 | 8/20/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/19/2004 at 1:35:00 PM. Contact: ###-####. OK for Perm Occ. :) 8/20/2004 9:47:55 AM
|
Permanent Occupancy | | 8/20/2004 | 8/20/2004 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/12/2004 | 7/13/2004 | 7/13/2004 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled. 7/13/2004 9:46:46 AM
|
FIRE-Final Inspection | 7/12/2004 | 7/13/2004 | 7/13/2004 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled. 7/13/2004 9:46:46 AM
|
BLD-Final | 7/12/2004 | 7/13/2004 | 7/13/2004 | P | NR |
Jim Storey
|
|
|
Wayne; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes pending ada in break rm. 7/13/2004 1:51:49 PM
|
FIRE-Final Inspection | 7/12/2004 | 7/13/2004 | 7/13/2004 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled. 7/13/2004 9:46:46 AM
|
Code Occupancy Approval | | | 7/13/2004 | | PASS |
|
|
|
ALL IN AS REQUIRED AND FINAL SIGNED OFF. ALSO RELEASE OF BOND
|
Temporary occupancy | | | 7/1/2004 | | DONE |
|
|
|
Temp. Occ. Cert. # 5122 issued 7-1-04 to the Pepperhills Elementary School.
|
BLD-Final | 6/30/2004 | 6/30/2004 | 6/30/2004 | P | PART |
Jim Storey
|
|
|
temp ok pending c/n for ada . 6/30/2004 4:32:06 PM
|
FIRE-Final Inspection | 6/29/2004 | 6/29/2004 | 6/29/2004 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave millers permission. Fire alarm plan modifications have been resubmitted to the city of boise. If school is to be occupied prior to final sign off a fire watch will be required. Life safety items are complete and can be finaled when the fire alarm permit is finaled.
|
FIRE-Final Inspection | 6/25/2004 | 6/28/2004 | 6/28/2004 | A | FAIL |
Troy Cobbley
|
|
|
Need fire alarm resubmittals approved. All other items are OK. 6/28/2004 2:16:27 PM
|
BLD-Final | 6/25/2004 | 6/28/2004 | 6/28/2004 | P | NR |
Tom Arcoraci
|
|
|
Should have fire related issues signed off Mon am. Have addressed several issues from the correction notice 6/24. Some items had to be ordered and will take a little while to get. Would like to get a TCO.; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman
|
FIRE-Final Inspection | 6/25/2004 | 6/25/2004 | 6/25/2004 | P | FAIL |
Rick Jackson
|
|
|
Need fire lane curbs painted and fire lane signs on access road around the building; need to verify knox box and complete fire alarm permit 6/25/2004 4:48:19 PM
|
BLD-Final | 6/23/2004 | 6/24/2004 | 6/24/2004 | P | FAIL |
Jim Storey
|
|
|
WAYNE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles c/n on site. 6/24/2004 5:05:58 PM
|
BLD-Framing/Rough-in | 6/23/2004 | 6/23/2004 | 6/23/2004 | P | CANC |
Troy James
|
|
|
WAYNE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Code Occupancy Approval Temp | | | 6/23/2004 | | DONE |
|
|
|
OK TO SIGN TEMP OCCUPANCY WHEN BOND POSTED FOR $115,353 FOR INCOMPLETE LANDSCAPE, FENCE AND PLAY GROUND.
|
PubWorks Occupancy Approval | 6/18/2004 | 6/18/2004 | 6/18/2004 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 6/18/04. R.Rokovitz
|
BLD-Other | 6/9/2004 | 6/11/2004 | 6/11/2004 | A | PASS |
Tom Arcoraci
|
|
|
T-bar inspection. Check fire taping and fire caulking. Grid for earthquake requirements. Every thing needed to get the OK for the installation of ceiling tile. Contact Darrell with CM Co.; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman grid ok all 6/11/2004 9:13:11 AM
|
BLD-Conference | 6/4/2004 | 6/4/2004 | 6/4/2004 | A | DONE |
Troy James
|
|
|
Discuss requirements for occupancy permit.; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman
|
BLD-Conference | 5/10/2004 | 5/10/2004 | 5/10/2004 | P | PART |
Russ Owen
|
|
|
Canopy--fire tape and other; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman. Drywall has been put up under front canopy, the Architect has an RFI for a contious 4 in vent. 5/12/2004 3:07:35 PM
|
BLD-Energy code compliance | 3/24/2004 | 3/25/2004 | 3/25/2004 | A | PART |
Tom Arcoraci
|
|
|
Insulation inspection at E wing stage area; ok to cover this area fire block at deck of 191 184b ok Phone #: ###-#### Internet Inspection Request from: Wayne Coleman 3/25/2004 8:56:00 AM
|
BLD-Framing/Rough-in | 3/23/2004 | 3/23/2004 | 3/23/2004 | A | PART |
Russ Owen
|
|
|
E wing trusses; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman (Ok trusses 3/22/2004 10:01:14 PM
|
BLD-Framing/Rough-in | 3/18/2004 | 3/19/2004 | 3/19/2004 | A | PART |
Russ Owen
|
|
|
Re-inspect A wing at sheer wall. Inspect insulation at A wing.
Inspect balance of framing in E wing.; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman , Need nails at some a-35 clips. 3/19/2004 12:39:04 AM
|
BLD-Framing/Rough-in | 3/17/2004 | 3/18/2004 | 3/18/2004 | A | PART |
Russ Owen
|
|
|
Framing inspection for the administration area of E wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman, need to reinsp area of firewall. 3/18/2004 1:29:55 AM
|
BLD-Framing/Rough-in | 3/17/2004 | 3/18/2004 | 3/18/2004 | A | PART |
Russ Owen
|
|
|
Framing inspection for the administration area of E wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman, need to reinsp area of firewall. 3/18/2004 1:29:55 AM
|
BLD-Framing/Rough-in | 3/8/2004 | 3/9/2004 | 3/9/2004 | A | PART |
Russ Owen
|
|
|
Roof sheathing nailing inspection. E wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman Ok to cover. 3/8/2004 7:07:58 PM
|
BLD-Conference | 3/2/2004 | 3/3/2004 | 3/3/2004 | A | PART |
Russ Owen
|
|
|
Ok for lid in kitchen. 3/2/2004 6:30:39 PM Ok for lid in kitchen. 3/2/2004 6:30:45 PM
|
BLD-Energy code compliance | 3/3/2004 | 3/3/2004 | 3/3/2004 | A | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman Ok for lid in kitchen. 3/2/2004 6:30:39 PM Ok for lid in kitchen. 3/2/2004 6:30:50 PM
|
BLD-Conference | 3/2/2004 | 3/2/2004 | 3/2/2004 | P | CANC |
Russ Owen
|
|
|
Insulation inspection in kitchen ceiling; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman Out of time this day recall for an am Russ. 3/2/2004 12:56:48 AM
|
BLD-Framing/Rough-in | 2/26/2004 | 2/27/2004 | 2/27/2004 | A | PART |
Russ Owen
|
|
|
Framing inspection E wing -- Kitchen; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman. ok to insulate kitchen 2/26/2004 8:55:17 PM
|
BLD-Framing/Rough-in | 2/25/2004 | 2/26/2004 | 2/26/2004 | A | PART |
Tom Arcoraci
|
|
|
Re-inspect for fire barrier in A wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman NAILING OK SOTH WALL OF E-WING FIRE BARRIER OK E WING
2/26/2004 9:59:48 AM
|
BLD-Framing/Rough-in | 2/24/2004 | 2/25/2004 | 2/25/2004 | A | PART |
Russ Owen
|
|
|
Framing re-inspection on A wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman
|
BLD-Framing/Rough-in | 2/18/2004 | 2/19/2004 | 2/19/2004 | A | PART |
Russ Owen
|
|
|
Framing and insulation inspection in A wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman Ok except need to build walls to ceiling in small storage . 2/18/2004 7:57:55 PM
|
BLD-Framing/Rough-in | 2/16/2004 | 2/17/2004 | 2/17/2004 | A | PART |
Russ Owen
|
|
|
Exterior wall nailing at kitchen. Sheer bracing in east end of C wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman. all ok. 2/16/2004 6:15:25 PM
|
BLD-Framing/Rough-in | 2/11/2004 | 2/12/2004 | 2/12/2004 | A | PART |
Russ Owen
|
|
|
Re-inspect roof deck at Kitchen; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman. needs more nails. 2/11/2004 7:03:40 PM
|
BLD-Framing/Rough-in | 2/11/2004 | 2/12/2004 | 2/12/2004 | P | PASS |
Russ Owen
|
|
|
roof 2/11/2004 10:11:22 PM
|
BLD-Framing/Rough-in | 2/11/2004 | 2/11/2004 | 2/11/2004 | P | PART |
Russ Owen
|
|
|
Roof nailing inspection on cafeteria; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman all ok except flat portion . 2/11/2004 4:35:45 PM
|
BLD-Framing/Rough-in | 2/9/2004 | 2/10/2004 | 2/10/2004 | A | NR |
Russ Owen
|
|
|
E wing roof nailing inspection- kitchen roof; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman
|
BLD-Framing/Rough-in | 2/6/2004 | 2/9/2004 | 2/9/2004 | A | PART |
Russ Owen
|
|
|
Framing inspection south side of C wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman . Ok to insulate 2/9/2004 10:27:21 AM
|
BLD-Framing/Rough-in | 2/6/2004 | 2/6/2004 | 2/6/2004 | P | PART |
Russ Owen
|
|
|
E wing (north side) exterior wall sheathing nailing inspection; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman (Ok to cover. 2/6/2004 4:39:06 PM
|
BLD-Framing/Rough-in | 2/4/2004 | 2/5/2004 | 2/5/2004 | A | PART |
Russ Owen
|
|
|
b wing bracing ,ok to cover . 2/5/2004 3:53:01 PM
|
BLD-Energy code compliance | 2/4/2004 | 2/5/2004 | 2/5/2004 | A | PART |
Russ Owen
|
|
|
c wing partial 2/5/2004 3:53:46 PM
|
BLD-Framing/Rough-in | 2/3/2004 | 2/4/2004 | 2/4/2004 | A | CANC |
Tom Arcoraci
|
|
|
B wing bracing east side; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman
|
BLD-Framing/Rough-in | 1/31/2004 | 2/2/2004 | 2/2/2004 | A | PART |
Jim Sly
|
|
|
B wing bracing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman Frame insp C wing (North side) OK.... Detail 5/20 Beam/wall truss/blocking detail Room 105 OK with Eng OK for some blocking flat to allow for conduit. 2/2/2004 9:21:58 AM
|
BLD-Energy code compliance | 1/23/2004 | 1/23/2004 | 1/23/2004 | P | PART |
Russ Owen
|
|
|
Insulation inspection B wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman Ok b -wing. 1/23/2004 3:30:12 PM
|
BLD-Framing/Rough-in | 1/20/2004 | 1/20/2004 | 1/20/2004 | A | PART |
Russ Owen
|
|
|
B wing framing and A wing roof sheathing nailing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman Went over some areas that need some fire caulking and attic area shear wall patches, contractor will recall after walls insulated. 1/20/2004 11:42:07 AM
|
BLD-Framing/Rough-in | 1/16/2004 | 1/19/2004 | 1/19/2004 | A | CANC |
Russ Owen
|
|
|
B wing framing inspection; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman
|
BLD-Framing/Rough-in | 1/14/2004 | 1/15/2004 | 1/15/2004 | A | PART |
Russ Owen
|
|
|
wall sheathing nailing inspection on C wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman out of time rescheduled for tomorrow am 1/14/2004 5:18:08 PM Ok to side, I have also recieved a letter from architect on ceiling shear at ends ok with flat blocking, plan had indicated vertical. 1/15/2004 10:20:45 AM
|
BLD-Framing/Rough-in | 1/14/2004 | 1/14/2004 | 1/14/2004 | P | CANC |
Dave Hannah
|
|
|
wall sheathing nailing inspection on C wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman out of time rescheduled for tomorrow am 1/14/2004 5:18:08 PM
|
BLD-Conference | 1/8/2004 | 1/9/2004 | 1/9/2004 | A | CANC |
Russ Owen
|
|
|
|
BLD-Framing/Rough-in | 1/8/2004 | 1/8/2004 | 1/8/2004 | A | CANC |
Russ Owen
|
|
|
|
BLD-Framing/Rough-in | 1/8/2004 | 1/8/2004 | 1/8/2004 | P | CANC |
Russ Owen
|
|
|
|
BLD-Energy code compliance | 12/30/2003 | 12/31/2003 | 12/31/2003 | A | PART |
Russ Owen
|
|
|
insulation insp D-wing.
|
BLD-Energy code compliance | 12/30/2003 | 12/30/2003 | 12/30/2003 | P | CANC |
Russ Owen
|
|
|
Insulation inspection D wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman Out of time will clone for am inspection Russ. 12/30/2003 4:30:54 PM
|
BLD-Framing/Rough-in | 12/23/2003 | 12/24/2003 | 12/24/2003 | A | PART |
Troy James
|
|
|
exterior wall sheathing nailing B wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman
okay exterior shear wall nailing to wing B. 12/24/2003 10:38:44 AM
|
BLD-Framing/Rough-in | 12/23/2003 | 12/23/2003 | 12/23/2003 | P | PART |
Russ Owen
|
|
|
B wing roof nailing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman
|
BLD-Framing/Rough-in | 12/22/2003 | 12/22/2003 | 12/22/2003 | P | PART |
Russ Owen
|
|
|
Re-inspect D wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman Ok to insulate. 12/22/2003 4:27:15 PM
|
BLD-Framing/Rough-in | 12/18/2003 | 12/19/2003 | 12/19/2003 | A | FAIL |
Russ Owen
|
|
|
Framing inspection D wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman c/n posted in job trailer. 12/19/2003 1:29:18 PM
|
BLD-Framing/Rough-in | 12/17/2003 | 12/18/2003 | 12/18/2003 | A | PART |
Russ Owen
|
|
|
part on roof ok. 12/18/2003 10:01:38 AM
|
BLD-Framing/Rough-in | 12/17/2003 | 12/17/2003 | 12/17/2003 | P | NR |
Russ Owen
|
|
|
reinspect roof nailing @ shear wall in A wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman
|
BLD-Framing/Rough-in | 12/15/2003 | 12/16/2003 | 12/16/2003 | A | PART |
Russ Owen
|
|
|
Roof nailing inspection of C wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman need to complete tops of center shear wall. 12/16/2003 10:59:01 AM
|
BLD-Framing/Rough-in | 12/16/2003 | 12/16/2003 | 12/16/2003 | P | PART |
Russ Owen
|
|
|
center area needs nails at shearwall. 12/16/2003 4:24:01 PM
|
BLD-Framing/Rough-in | 12/11/2003 | 12/12/2003 | 12/12/2003 | P | PART |
Tom Arcoraci
|
|
|
Reinspect wall sheathing nailing and hold down anchors in D wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman d wing ext nailing ok 12/12/2003 3:42:11 PM
|
BLD-Framing/Rough-in | 12/9/2003 | 12/9/2003 | 12/9/2003 | P | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman, most of roof ok , needs nailing at top, over center shear,will recall also questioned engineer about hold down placement and exterior shear waiting for call back from Keith Jones. 12/9/2003 4:53:36 PM 12/9/2003 4:55:03 PM
|
BLD-Footing | 10/15/2003 | 10/16/2003 | 10/16/2003 | A | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman
|
BLD-Footing | 10/13/2003 | 10/14/2003 | 10/14/2003 | A | PART |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman spec insp 10/14/2003 9:27:16 AM
|
BLD-Footing | 10/10/2003 | 10/13/2003 | 10/13/2003 | A | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman
|
BLD-Footing | 9/29/2003 | 9/30/2003 | 9/30/2003 | A | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman
|
BLD-Footing | 9/26/2003 | 9/29/2003 | 9/29/2003 | A | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman
|
BLD-Footing | 9/25/2003 | 9/26/2003 | 9/26/2003 | A | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman
|
BLD-Footing | 9/24/2003 | 9/25/2003 | 9/25/2003 | A | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman
|
BLD-Footing | 9/23/2003 | 9/24/2003 | 9/24/2003 | A | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman
|
BLD-Footing | 9/19/2003 | 9/22/2003 | 9/22/2003 | A | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman. pending special inspection 9/21/2003 6:19:23 PM
|
BLD-Footing | 9/17/2003 | 9/18/2003 | 9/18/2003 | A | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman. s-i 9/17/2003 10:54:57 PM
|
BLD-Footing | 9/16/2003 | 9/17/2003 | 9/17/2003 | A | PART |
Russ Owen
|
|
|
Internet Inspection Request from: Wayne Coleman wip special inspector on site. 9/16/2003 10:05:08 PM
|
BLD-Footing | 9/15/2003 | 9/16/2003 | 9/16/2003 | A | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman unable to go out ok per special inspector. 9/16/2003 1:24:53 AM
|
BLD-Footing | 9/12/2003 | 9/15/2003 | 9/15/2003 | A | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman. walls and footings in progress 9/14/2003 6:17:31 PM
|
BLD-Footing | 9/10/2003 | 9/11/2003 | 9/11/2003 | A | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman subject to s-i. 9/11/2003 11:42:07 PM
|
BLD-Footing | 9/9/2003 | 9/10/2003 | 9/10/2003 | A | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman Subject to s-i. 9/10/2003 5:53:38 PM
|
BLD-Conference | 9/8/2003 | 9/9/2003 | 9/9/2003 | A | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman pending special inspection. 9/9/2003 4:43:17 PM
|
BLD-Conference | 9/5/2003 | 9/8/2003 | 9/8/2003 | A | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Coleman Ok also subject to s-i. 9/7/2003 7:35:35 PM
|
BLD-Footing | 9/3/2003 | 9/5/2003 | 9/5/2003 | A | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Colemanok subject to s-i. 9/4/2003 7:58:28 PM
|
BLD-Footing | 8/29/2003 | 9/2/2003 | 9/2/2003 | A | PART |
Russ Owen
|
|
|
wayne; Phone #: ###-#### Internet Inspection Request from: Marc Lileks Ok pending S-I . 9/2/2003 12:25:26 PM
|
BLD-Footing | 8/27/2003 | 8/28/2003 | 8/28/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/27/2003 at 8:06:05 AM. Contact: ###-####. MTI will perform inspections. 8/28/2003 4:00:43 PM
|
(F) Reprint permit | | | 7/14/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/11/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/9/2003 | | |
|
|
|
|
Print Occupancy Form | | | 7/9/2003 | | DONE |
|
|
|
|
Telephone call | | | 7/9/2003 | | DONE |
|
|
|
LEFT MESS WITH JACKIE THAT PERMIT IS READY
|
Routing - PUBLIC WORKS | 7/3/2003 | | 7/7/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/7/2003 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 4/15/2003 | | 7/7/2003 | | PASS |
Mike Otto
|
|
|
7/7/2003 13:35:17 MLO - activity updated through activity BLDA022 from case BLD03-00781.
|
Routing - PUBLIC WORKS | 7/3/2003 | | 7/3/2003 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 6/30/2003 | | 7/1/2003 | | FAIL |
|
|
|
flood plain corrections
|
Routing Off Site - STRUCTURAL | 6/11/2003 | | 6/19/2003 | | PASS |
|
|
|
sent out revised structural calculations
|
Routing - PUBLIC WORKS | 6/10/2003 | | 6/11/2003 | | FAIL |
|
|
|
floodplain issues per Jim Wyllie
|
Plan resubmittals received | | | 6/10/2003 | | DONE |
|
|
|
Transmittal letter, copy of plan review fax transmittal, with two copies of supplemental structural calculations and taken to Mike O.
|
Routing - FIRE | 6/5/2003 | | 6/10/2003 | | PASS |
|
|
|
Resubmittal acceptable.
|
Routing - PLAN CHECK | 6/2/2003 | | 6/5/2003 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 6/5/2003 | | DONE |
|
|
|
structural review comments
|
Routing Off Site - STRUCTURAL | 5/21/2003 | | 6/5/2003 | | FAIL |
|
|
|
Contacted PDQ to take revised plans to outside engineering. corrections faxed and mailed to architect
|
Plan resubmittals received | | | 5/28/2003 | | DONE |
|
|
|
letter from LKV,wheelchair left package, two sets of 30, 4, 5.2, 5.3, 6, 12.2, and routed to Mike O.
|
Plan resubmittals requested | | | 5/22/2003 | | DONE |
|
|
|
IBC corrections
|
Routing - PLAN CHECK | 5/21/2003 | | 5/22/2003 | | FAIL |
|
|
|
corrections faxed and mailed to architect
|
Plan resubmittals received | | | 5/21/2003 | | DONE |
|
|
|
Response letter to plan review comments, two structural calculations, three copies of C-3 5.5, 7.1, 12, 16, 17, 22, 25, 26, 27, 39, and taken to Mike O.
|
Routing - FIRE | 5/8/2003 | | 5/20/2003 | | FAIL |
|
|
|
review comments faxed to architect; issues with fire hydrants, FD vehicle access and AS control va's.
|
Routing Off Site - STRUCTURAL | 4/15/2003 | | 5/7/2003 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside engineering. kmm corrections faxed and mailed to architect
|
Plan resubmittals requested | | | 5/7/2003 | | DONE |
|
|
|
IBC structural and non-structural corrections
|
Routing - PLAN CHECK | 4/30/2003 | | 5/7/2003 | | FAIL |
|
|
|
corrections faxed and mailed to architect
|
Routing - PLUMBING | 4/24/2003 | | 4/30/2003 | | PASS |
|
|
|
rp required on the equipment make up water, pipe waste from FS-3 in mech. room 182A to s.s., page P-6. additional cross connection protection may be required.
|
Routing - PLANNING | 4/24/2003 | | 4/24/2003 | | PASS |
|
|
|
Approved per CUP02-00135 and CUP02-00135 Mod #1
|
Routing - Erosion and Sediment | 4/23/2003 | | 4/23/2003 | | PASS |
|
|
|
ESC approved with attached conditions. RP to be determined prior to project.
|
Routing - PUBLIC WORKS | 4/15/2003 | | 4/22/2003 | | FAIL |
|
|
|
Requires drainage plan revisions per Brian M. kmm
|
Plans ACCEPTED BY PLAN TECH | | | 4/15/2003 | | DONE |
|
|
|
Energy code compliance documentation is not incorporated into the plans, they are attached. Mech. information is incorporated into the plans. kmm
|
Routing - PLANNING Land Div | 4/15/2003 | | 4/15/2003 | | PASS |
|
|
|
Lot 17, Block 8 of Pepperwood Estates No. 9 Subdivision.
|
Plan routing begun/NEW & ADDTN | | | 4/15/2003 | | |
|
|
|
|
Application received | | | 4/11/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/11/2003 | | DONE |
|
|
|
|
Fee Review-notes | 4/11/2003 | 4/11/2003 | | | |
|
|
|
|