Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD03-00795
StatusFinaled
Name BURGUNDY HOMES
Site Address 5033 N ARROW CREST WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 3378 sq. ft. two story single family dwelling with 1019 sq. ft. attached three car garage, a 60 sq. ft. covered entry way and 276 sq. ft. of covered concrete patio areas at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible space will be maintained. (1st floor 2175 sq. ft.)(2nd floor 816 sq. ft. finished/387 sq. ft. unfinished) Note: Seperate permits will be required to finish bonus room. PC #223 CU #44-94 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/7/200311/10/200311/10/2003APASS
DetailsTony Young
rick- ###-####
DOC - Permit Finaled11/10/200311/10/200311/10/2003APASS
DetailsTony Young
Finaled by inspector at 11/10/2003 11:22:29 AM
BLD-Grading Inspection11/7/200311/7/200311/7/2003 PASS
DetailsRita DeYoung
Final grading and drainage approved. Recommended to the contractor (Rick) that the chains on the front be replaced with downspouts to prevent saturating the ground in front of the house.
BLD-Energy code compliance7/18/20037/21/20037/21/2003APASS
DetailsDave Hannah
rick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover 7/21/2003 9:55:43 AM
BLD-Framing/Rough-in7/17/20037/17/20037/17/2003PPASS
DetailsTony Young
RICK; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows\
int. shear ok also,,, ok to insulate 7/17/2003 3:19:08 PM
BLD-Framing/Rough-in7/15/20037/16/20037/16/2003PPART
DetailsTony Young
late afternoon please Rick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
c/n,, ok to insulate,,, verify int. shear also 7/16/2003 2:55:53 PM
BLD-Framing/Rough-in7/7/20037/8/20037/8/2003PPART
DetailsTony Young
rick shear nail; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ext. shear ok pending eng. letter 7/8/2003 3:57:53 PM
BLD-Framing/Rough-in7/2/20037/3/20037/3/2003AFAIL
DetailsTony Young
rick shear nail; Phone #: ###-#### Internet Inspection Request from: Darla Downs
c/n posted,,, shear inspection only 7/3/2003 1:48:35 PM
BLD-Foundation5/22/20035/23/20035/23/2003APART
DetailsTony Young
dane
BLD-Foundation5/22/20035/22/20035/22/2003PPART
DetailsTony Young
dane; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
wip 5/22/2003 3:07:02 PM
BLD-Footing5/21/20035/21/20035/21/2003PPART
DetailsTony Young
EMANUAL; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Issue PAID IN FULL permit  5/20/2003 DONE
Inspection Record Card- Bld  5/8/2003 DONE
Telephone call  5/8/2003 DONE
permit ready
Plan assigned to (DJO)5/6/20035/6/20035/7/2003 PASS
DetailsDan Overy
5/7/2003 14:23:56 DJO - activity updated through activity BLDA022 from case BLD03-00795.
Plan Reviewer's activity  5/7/2003 DONE
site plan and new rescheck faxed in. ok to issue
PLANS/APPL TAKEN TO FRONT DESK  5/7/2003 DONE
Case Summary (BLD)  5/7/2003 DONE
Plan Review Report  5/7/2003 DONE
Plans ACCEPTED BY PLAN CHECK  5/6/2003  
Plan Reviewer's activity  5/6/2003 DONE
additional site plan required. this will be signed off by
Routing - FIRE4/21/2003 4/22/2003 DONE
NO fire sprinklers required (Arrowhead Canyon sub)
Routing - Erosion and Sediment4/21/2003 4/21/2003 PASS
ESC approved with attached conditions.
Routing - PLANNING4/21/2003 4/21/2003 PASS
Routing - PUBLIC WORKS4/21/2003 4/21/2003 PASS
NORTHWEST BOISE SEWER DISTRICT
Routing - PUBLIC WORKS GRADING4/15/2003 4/18/2003 PASS
DetailsRita DeYoung
Approved as category 3 with conditions of approval in letter from Boise Public Works attached to plansets and this case.
Application received  4/15/2003  
Pending Assignment by DJO4/15/2003    
DetailsDan Overy
Routing - PLAN CHECK4/22/2003