Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD03-00798
StatusFinaled
Name HUTCHISON SMITH ARCHITECTS
Site Address 3722 W ANDERSON ST
Project NameSchool (Taft Elementary)
Customer Number 
ePlanReviewNo
Description
Taft Elementary School * To place one 28'-0" x 72'-0" 2016 sq. ft.protable classroom building. Work to include stairs, ramp footings and ties downs. Other work includes all site improvements and landscaping per approved plans and attachments. Idaho Tag # 9305 fb CUP03-00020 Note: proposed use is for after school activities occupant load factor 35 sq ft per plan.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 2/4/20042/4/2004 DONE
Permanent occupancy  2/4/2004 DONE
Perm. Occ. Cert. #9973 issued 2-4-04 to Taft Elementary School portable classroom bldg.
Print Occupancy Form  2/2/2004 DONE
FIRE-Final Inspection1/29/20041/30/20041/30/2004ADONE
DetailsTony Young
Scheduled by a contractor via Hello! on 1/29/2004 at 12:39:03 PM. Contact: ###-####. Regular final, not fire,,, 1/29/2004 2:58:25 PM
BLD-Final1/30/20041/30/20041/30/2004PPASS
DetailsTony Young
ok for perm c of o 1/30/2004 1:26:15 PM
DOC - Permit Finaled1/30/20041/30/20041/30/2004PPASS
DetailsTony Young
Finaled by inspector at 1/30/2004 1:26:16 PM
FIRE-Final Inspection1/26/20041/26/20041/26/2004PPASS
DetailsTroy Cobbley
fire alarm and fire life safety finaled 1/26/2004 3:10:05 PM
Permanent Occupancy 1/26/20041/26/2004 DONE
Details
FIRE-Alarm Testing10/9/200310/13/200310/13/2003PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/9/2003 at 12:34:43 PM. Contact: ###-####. per Dave Miller the fire alarm panel will have to be upgraded or meet his timeline for upgrade as all of the relocatables are on one zone but aren't located in the same area; smoke detectors are overspaced; simplex pulls used to facilitate the tamper proof covers 10/13/2003 4:48:14 PM
PubWorks Occupancy Approval8/25/20038/25/20038/25/2003 DONE
Drainage project complete, signed permanent occupancy 8/25/03. R.Rokovitz
FIRE-Final Inspection8/21/20038/22/20038/22/2003APART
DetailsTroy Cobbley
Life safety was given a Temp until the fire dept. access curbing is painted and signed per review notes 4 and 5 and the fire alarm system is finaled 8/22/2003 11:02:58 AM
BLD-Final8/21/20038/22/20038/22/2003PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 8/21/2003 at 4:23:23 PM. Contact: ###-####.
c/n posted,,, 2 pages 8/22/2003 3:20:46 PM
BLD-Foundation8/11/20038/11/20038/11/2003PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 8/11/2003 at 9:12:57 AM. Contact: ###-####.
BLD-Framing/Rough-in8/11/20038/11/20038/11/2003PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 8/11/2003 at 9:14:26 AM. Contact: ###-####.
Issue PAID IN FULL permit  6/25/2003 DONE
(F) Reprint permit  6/25/2003  
Inspection Record Card- Bld  6/19/2003 DONE
Print Occupancy Form  6/19/2003 DONE
Telephone call  6/19/2003 DONE
left mess that permit is ready
Routing - Erosion and Sediment6/13/2003 6/18/2003 PASS
ESC approved with attached conditions.
Case Summary (BLD)  6/18/2003  
PLANS/APPL TAKEN TO FRONT DESK  6/18/2003 DONE
Plan assigned to (MLO)4/17/2003 6/18/2003 PASS
DetailsMike Otto
6/18/2003 15:35:51 MLO - activity updated through activity BLDA022 from case BLD03-00798.
Plan resubmittals received  6/13/2003 DONE
Redeived one copy of Previous transmittal to Jim Rodgers and two copies of Erosion and Sediment Control Plan Narrative. Routed to Mike O. kmm
Routing - Erosion and Sediment5/30/2003 5/30/2003 FAIL
Need 2 copies of esc narrative.
Plan resubmittals received  5/30/2003 PASS
DetailsRita DeYoung
Transmittal from Hutchison Smith Arch, two copies of esc plan narrative. taken to Mike O.
Routing - PUBLIC WORKS5/27/2003 5/29/2003 PASS
DetailsBrandi Dominguez
ready fo re-review after fire
Routing - FIRE4/30/2003 5/9/2003 PASS
Routing - PLAN CHECK4/28/2003 4/30/2003 PASS
Routing - PLUMBING4/24/2003 4/28/2003 PASS
DetailsLee Rice
approved per 2000 UPC and note.
Routing - PLANNING4/24/2003 4/24/2003 PASS
Approved pre CUP03-00020
Routing - PUBLIC WORKS4/17/2003 4/23/2003 FAIL
Requires Drainage plan. Kmm
Routing - Erosion and Sediment4/23/2003 4/23/2003 FAIL
Narratives needed per Ord. 8-17 and PD certification, (App. A and C).
Plans ACCEPTED BY PLAN TECH  4/17/2003 PEND
Requires Id tag number. contacted Ross Holloway at ###-####.
Routing - PLANNING Land Div4/17/2003 4/17/2003 PASS
Approved. Site is over 5 acres in size.
Plan routing begun/TENANTS  4/17/2003 DONE
Application received  4/15/2003  
Recd Pcfee & Taken To Pln CK  4/15/2003 DONE
Fee Review-notes4/15/20034/15/2003