Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD03-00811
StatusFinaled
Name HIGHLANDS HOLLOW
Site Address 2455 N HARRISON HOLLOW LN
Project NameHIGHLANDS HOLLOW BREWHOUSE
Customer Number 
ePlanReviewNo
Description
(HIGHLANDS HOLLOW BREWHOUSE) To construct a new 440 sq ft. (20'x22') uncovered deck with accessible ramp for dining/drinking on the northeast corner of an existing 3,471 sq. ft. restaurant/brew pub building per approved plans on file. Work to include new pressure treated wood deck floor framing joists/beams with support posts and concrete support piers, bolted connections, trex decking, new accessible ramp with handrails, deck perimeter bench/rail, and site/parking lot modifications per Planning Division requirements. Occupant load of deck to be posted at 30 persons maximum. Deck floor live load to also be posted at 100 psf maximum. This is a Scope of Work Permit. Letter of Completion to be issued when done. Planning approval per CZC03-00045. (PC#202-03) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection5/20/20035/21/20035/21/2003APASS
DetailsRick Jackson
jerri; Phone #: ###-#### Internet Inspection Request from: Barbara Moore will occupant load sign for structural; final okay for fire/life safety - no card to sign off 5/21/2003 8:22:24 AM
BLD-Final5/20/20035/21/20035/21/2003PPASS
DetailsTony Young
jerri; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
DOC - Permit Finaled5/21/20035/21/20035/21/2003PPASS
DetailsTony Young
Finaled by inspector at 5/21/2003 4:12:00 PM
BLD-Framing/Rough-in5/13/20035/14/20035/14/2003PPART
DetailsTony Young
jerie; Phone #: ###-#### Internet Inspection Request from: Darla Downs
wip, ok 5/14/2003 2:07:22 PM
Issue PAID IN FULL permit  5/7/2003  
Plan assigned to (JCB)4/21/2003 5/6/2003 PASS
DetailsJason Blais
5/6/2003 13:19:05 JCB - activity updated through activity BLDA022 from case BLD03-00811.
Routing - PLANNING Land Div5/6/2003 5/6/2003 PASS
Parcel is eligible split from parcel created in 1964.
Routing - FIRE4/28/2003 5/6/2003 PASS
Routing - PLAN CHECK5/6/2003 5/6/2003 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  5/6/2003 PASS
Print Pending Permit.LaserJet4  5/6/2003  
Case Summary (BLD)  5/6/2003  
Inspection Record Card- Bld  5/6/2003 DONE
Telephone call  5/6/2003 DONE
LEFT MESS WITH JERRY THAT PERMIT IS READY
Routing - PLAN CHECK4/23/2003 4/28/2003 PEND
Plan review report sent to business owner. No response required. When Fire Dept. and Planning/Land Division department approves the project, a building permit can be issued.
Routing - PLANNING4/22/2003 4/23/2003 PASS
Approved per CZC03-45.
Routing - PLANNING Land Div4/21/2003 4/22/2003 FAIL
Need to verify legal land division. Talked to owner about getting deed.
Plans ACCEPTED BY PLAN TECH  4/21/2003 PEND
1. I have a call into Carol J. of CDH about signing off for a deck.
2. Should probably have a ESC waiver letter. I believe I spoke with the applicant about this.
Plan routing begun/TENANTS  4/21/2003 DONE
Application received  4/16/2003  
Recd Pcfee & Taken To Pln CK  4/16/2003 DONE
Fee Review-notes4/16/20034/16/2003